| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 CrAccepted-AOC | ₹1.9 Cr | L1 | Accepted-AOC As directed by CWC, Contract Agreement is placed on the L1 contractor, Leela Constructions, Chennai, at their quoted total amount of Rs. 1,90,14,289.00 /- for the work. |
| 2 | L2₹1.9 Cr+₹3.9 L (2.03%)Rejected-Finance | ₹1.9 Cr+₹3.9 L (2.03%) | L2 | Rejected-Finance Being L2 not accepted by CWC |
| 3 | L3₹2.0 Cr+₹13.2 L (6.95%)Rejected-Finance NO 24 46 4TH FLOOR AGNI BUSINESS CENTRE K B DASAN ROAD ALWARPET CHENNAI TAMIL NADU 600018 | CHENNAI | TAMIL NADU | 600018 | ₹2.0 Cr+₹13.2 L (6.95%) | L3 | Rejected-Finance Being L3 not accepted by CWC |
| Sl No | Description | Qty | Unit | Vishnusurya Projects & Infra Limited L3 | DEEPAM ENTERPRISES L2 | Leela Constructions L1 |
|---|---|---|---|---|---|---|
| 1.00 | Dismantling of floor,hearth or wall tiling including cement mortar bedding (but not backing),removing serviceable tiles to store and rubbish off the premises. | 570 | SQM | 101 ₹57,570 | 85 ₹48,450 Lowest | 110 ₹62,700 |
| 2.00 | Demolition of un reinforced cement concrete in ground floors and paving not exceeding 15cm thick
(below or above GL) . | 20 | CUM | 1,400 ₹28,000 | 1,350 ₹27,000 Lowest | 1,430 ₹28,600 |
| 3.00 | Demolition of un reinforced cement concrete in ground floors and paving exceeding 15cm thick
(below or above GL) . | 45 | CUM | 2,687 ₹1,20,915 | 1,950 ₹87,750 Lowest | 2,475 ₹1,11,375 |
| 4.00 | Demolition of reinforced cement concrete in ground floors and paving not exceeding 15cm thick
(below or above GL) . | 2 | CUM | 2,415 ₹4,830 | 1,750 ₹3,500 Lowest | 2,220 ₹4,440 |
| 5.00 | Demolition of brickwork or stone/boulder masonry, built in cement mortar. | 12.5 | CUM | 1,792 ₹22,400 | 1,350 ₹16,875 Lowest | 1,700 ₹21,250 |
| 6.00 | Dismantling structural steel work including doors, gates but excluding framed truss etc., | 12 | Quintal | 698 ₹8,376 | 610 ₹7,320 Lowest | 645 ₹7,740 |
| 7.00 | Dismantling of movable rack, almarah and fixing at designated area with in 2.00Km lead with in Factory including transportation the same. | 1 | WJ | 73,450 ₹73,450 | 60,000 ₹60,000 | 45,000 ₹45,000 Lowest |
| 8.00 | Transporting to the lead of not less than 2.km and Fixing MS pipes any dia and any description in position as directed. | 75 | RM | 624 ₹46,800 | 625 ₹46,875 | 585 ₹43,875 Lowest |
| 9.00 | Taking down window frame with shutter not exceeding 1.5 sq.m and handing over the same to CE (Fy) stores. | 22 | Each | 402 ₹8,844 | 310 ₹6,820 Lowest | 375 ₹8,250 |
| 10.00 | Taking down door shutters but exc 1 sq. m and n exc 2 sq. m each and handing over the same to CE (Fy) Stores, | 14 | Each | 209 ₹2,926 Lowest | 225 ₹3,150 | 225 ₹3,150 |
Tender Value
₹2.1 Cr
EMD Value
₹2.8 L
Closing Date
4 Aug 2026, 2:00 pmClosed
THE CHIEF GENERAL MANAGER
THE CGM, FMU-HVF, AVADI, CHENNAI - 600 054
EXTENSION OF AVANI AVISHKAR CENTRE AT HVF, AVADI AND CREATION OF OFFICE ACCOMMODATION FOR 50 DESIGNERS AT AVANI AVISHKAR CENTRE AT HVF, AVADI.
2026_AVNL_283099_1
HVF/TE/13025/CEO/2026-27/33
Open Tender
Civil Works
Works
240 days
HVF, AVADI
DETAILS ENCLSOED
8 documents required · 8 mandatory
₹0
₹2.8 L
24 Aug 2026
6 Jul 2026
5 Aug 2026
6 Jul 2026
4 Aug 2026
6 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of floor,hearth or wall tiling including cement mortar bedding (but not backing),removing serviceable tiles to store and rubbish off the premises. | 570 | SQM | 102.93 | ₹58,670.1 |
| 2 | Demolition of un reinforced cement concrete in ground floors and paving not exceeding 15cm thick
(below or above GL) . | 20 | CUM | 1,586.43 | ₹31,728.6 |
| 3 | Demolition of un reinforced cement concrete in ground floors and paving exceeding 15cm thick
(below or above GL) . | 45 | CUM | 2,754.37 | ₹1,23,946.65 |
| 4 | Demolition of reinforced cement concrete in ground floors and paving not exceeding 15cm thick
(below or above GL) . | 2 | CUM | 2,464.11 | ₹4,928.22 |
| 5 | Demolition of brickwork or stone/boulder masonry, built in cement mortar. | 12.5 | CUM | 1,888.23 | ₹23,602.88 |
| 6 | Dismantling structural steel work including doors, gates but excluding framed truss etc., | 12 | Quintal | 717.14 | ₹8,605.68 |
| 7 | Dismantling of movable rack, almarah and fixing at designated area with in 2.00Km lead with in Factory including transportation the same. | 1 | WJ | 75,000 | ₹75,000 |
| 8 | Transporting to the lead of not less than 2.km and Fixing MS pipes any dia and any description in position as directed. | 75 | RM | 650 | ₹48,750 |
| 9 | Taking down window frame with shutter not exceeding 1.5 sq.m and handing over the same to CE (Fy) stores. | 22 | Each | 415.84 | ₹9,148.48 |
| 10 | Taking down door shutters but exc 1 sq. m and n exc 2 sq. m each and handing over the same to CE (Fy) Stores, | 14 | Each | 245.99 | ₹3,443.86 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
BOQ_330241.xls
BOQ • 0.48 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .