| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.6 LAccepted-AOC 0 AJAY KUMAR 85 HASTAM HASTAM BANDA UTTAR PRADESH 210001 HASTAM BANDA UTTAR PRADESH 210001 UDYAM UP 13 0007628 | BANDA | UTTAR PRADESH | 210001 | L1 | Accepted-AOC AOC | |
| 2 | L2₹29.0 L+₹2.4 L (9.08%)Rejected-Finance NA | NA | NA | 121004 | L2 | Rejected-Finance Higher then L1 |
| Sl No | Description | Qty | Unit | M/S S R CONSTRUCTION L2 | M/s Ajay Kumar Contractor L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work in Foundation in dry soil (Loam clay or sand) including lift up to 1.5 M and lead up to 30 m and including back filling, watering and ramming of excavated earth into the plinth with removal and disposal of surplus earth as directed by the Engineer-in-charge up to distance of 30 M from the foundation trenches
(a) Building and Other structure
(ii) By Manual | 446.5 | Cum | 30 ₹13,395 Lowest | 36 ₹16,074 |
| 2.00 | Laying C.C.1:2:4 M-15 with cement ,coarse sand & 10 to 20 mm downgraded stone grit including cost of all material,labour and T & P etc. Complete. but excludiing the cost of shuttering. | 61.34 | Cum | 5,800 ₹3,55,772 | 4,000 ₹2,45,360 Lowest |
| 3.00 | Brick work in 1:4 cement mortar in Abutment, Wing wall & Parapet etc.up to 3 m lift and 60 M lead including cost of all material, labour and T&P required for proper completion of work. | 0.86 | Cum | 5,300 ₹4,558 | 4,500 ₹3,870 Lowest |
| 4.00 | Laying P.C.C. M-20 with cement ,coarse sand & 10 to 20 mm downgraded stone grit including cost of all material,labour and T & P etc. Complete | 12.43 | Cum | 6,300 ₹78,309 | 6,000 ₹74,580 Lowest |
| 5.00 | Laying R.C.C. M-20 with cement ,coarse sand & 10 to 20 mm down graded stone grit including cost of all material,labour and T & P etc. Complete | 5.8 | Cum | 6,700 ₹38,860 | 6,000 ₹34,800 Lowest |
| 6.00 | Laying R.C.C. M-25 with cement ,coarse sand & 10 to 20 mm down graded stone grit including cost of all material,labour and T & P etc. Complete | 169.82 | Cum | 7,200 ₹12,22,704 | 6,000 ₹10,18,920 Lowest |
| 7.00 | Reinforcement including cutting ,bending and binding in position including all cost of labour,material and T & P etc. complete | 11.38 | M.T. | 55,000 ₹6,25,900 Lowest | 90,000 ₹10,24,200 |
| 8.00 | Centering and shuttering in straight portion of C.C. pier and abutment.including cost of all material,labour and T & P etc. Complete | 178.8 | Sqm | 450 ₹80,460 | 270 ₹48,276 Lowest |
| 9.00 | Ordinary centering and shuttering of ply wood or steel for R.C.C work.including cost of all material,labour and T & P etc. Complete | 443.88 | Sqm | 700 ₹3,10,716 | 270 ₹1,19,847.6 Lowest |
| 10.00 | Centering and shuttering/Form work for concrete block.including cost of all material,labour and T & P etc. Complete | 8.18 | Sqm | 450 ₹3,681 | 270 ₹2,208.6 Lowest |
Tender Value
₹34.0 L
EMD Value
₹67,900
Closing Date
17 Jun 2026, 1:00 pmClosed
Suprintending Engineer
SE MGCCC MORADABAD
Construction of Aqueduct at Km 1.132 of Chhachera Minor.
2026_UPIDC_1147085_6
01/SE/2026-27
Open Tender
Civil Works
Item Wise
Sambhal
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹67,900
14 Sept 2026
10 Jun 2026
17 Jun 2026
10 Jun 2026
17 Jun 2026
10 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in Foundation in dry soil (Loam clay or sand) including lift up to 1.5 M and lead up to 30 m and including back filling, watering and ramming of excavated earth into the plinth with removal and disposal of surplus earth as directed by the Engineer-in-charge up to distance of 30 M from the foundation trenches
(a) Building and Other structure
(ii) By Manual | 446.5 | Cum | 132 | ₹58,938 |
| 2 | Laying C.C.1:2:4 M-15 with cement ,coarse sand & 10 to 20 mm downgraded stone grit including cost of all material,labour and T & P etc. Complete. but excludiing the cost of shuttering. | 61.34 | Cum | 5,991.4 | ₹3,67,512.48 |
| 3 | Brick work in 1:4 cement mortar in Abutment, Wing wall & Parapet etc.up to 3 m lift and 60 M lead including cost of all material, labour and T&P required for proper completion of work. | 0.86 | Cum | 5,222.8 | ₹4,491.61 |
| 4 | Laying P.C.C. M-20 with cement ,coarse sand & 10 to 20 mm downgraded stone grit including cost of all material,labour and T & P etc. Complete | 12.43 | Cum | 6,455.4 | ₹80,240.62 |
| 5 | Laying R.C.C. M-20 with cement ,coarse sand & 10 to 20 mm down graded stone grit including cost of all material,labour and T & P etc. Complete | 5.8 | Cum | 6,872.4 | ₹39,859.92 |
| 6 | Laying R.C.C. M-25 with cement ,coarse sand & 10 to 20 mm down graded stone grit including cost of all material,labour and T & P etc. Complete | 169.82 | Cum | 7,703.6 | ₹13,08,225.35 |
| 7 | Reinforcement including cutting ,bending and binding in position including all cost of labour,material and T & P etc. complete | 11.38 | M.T. | 72,805.1 | ₹8,28,522.04 |
| 8 | Centering and shuttering in straight portion of C.C. pier and abutment.including cost of all material,labour and T & P etc. Complete | 178.8 | Sqm | 500 | ₹89,400 |
| 9 | Ordinary centering and shuttering of ply wood or steel for R.C.C work.including cost of all material,labour and T & P etc. Complete | 443.88 | Sqm | 822 | ₹3,64,869.36 |
| 10 | Centering and shuttering/Form work for concrete block.including cost of all material,labour and T & P etc. Complete | 8.18 | Sqm | 294 | ₹2,404.92 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.79 MB
Retenderbooklot2.pdf
Tender Documents • 2.71 MB
BOQ_2171384.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .