Tender Value
₹1.3 Cr
EMD Value
₹1.6 L
Closing Date
28 Sept 2026, 11:00 am
S.O.(CIVIL)
Khadia Area Dist.-Sonebhadra U.P.
Development works near canteen and rest shelter and extension of existing building for shift incharge and staff at OB time office at Khadia Project.
2026_NCL_365261_1
GM /KHD/C/26-27/ETN-11 Date 10.09.2026
Open Tender
Civil Works - Others
Percentage
180 days
Khadia Area Dist.-Sonebhadra U.P.
REFER NIT
5 documents required · 5 mandatory
₹1.6 L
10 Sept 2026
10 Sept 2026
29 Sept 2026
10 Sept 2026
28 Sept 2026
11 Sept 2026
10 Sept 2026 - 21 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.1 | Item Description/ Heading | - | - | - | - |
| 1PART A- RCC drain | |||||
| 2 | Earth work in excavation in all kind of soil/ silt by mechanical means (hydraulic excavaror)/ manual means including dozering, trasnportation, unloading at designated place, levelling and dressing of dump sites all inclusive as per instructions of EIC. with all
lifts (for all project of NCL) Lead upto 1.00 KM | 875 | Cum | 37.07 | ₹32,436.25 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 50 | cum | 5,402.95 | ₹2,70,147.5 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete,excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3
graded stone aggregate 20 mm nominal size de rived from natural sources) | 214 | cum | 6,908.3 | ₹14,78,376.2 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete | 125 | sqm | 218 | ₹27,250 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 1,952 | sqm | 479.6 | ₹9,36,179.2 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platform | 27 | sqm | 556.8 | ₹15,033.6 |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Cold twisted bars | 12,840 | kg | 101.25 | ₹13,00,050 |
| 9 | Filling available excavated earth (excluding rock) in trenches, plinth, sides offoundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 292 | cum | 170.25 | ₹49,713 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.74 MB
BOQ_378180.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .