Tender Value
₹2.4 Cr
EMD Value
₹3.5 L
Closing Date
13 Oct 2025, 9:30 pmClosed
Public Works Department
EXECUTIVE ENGINEER
Road Widening and Development of MDR Road Work Connecting to Guggarahatti Kakarlatota Mundrigi Mincheri Chainage from Km 0.60 to 1.50 Km in Ballari city Under 5054 Appendix-E for the year 2024-25.
PWD/2025-26/RD/WORK_INDENT22199/CALL-3
PWD/2025-26/RD/WORK_INDENT22199/CALL-3
Open
Roads
Two Tender Document System(Two Cover)
PWD Division Office Ballari
7 documents required · 7 mandatory
Reports on the financial standing of the tenderer, such as profit and loss statements and auditor’s reports for the last five years
To qualify for award of this contract, each Tenderer in his name should have in the last five years i.e., 2020-21, 2021-22, 2022-23 2023-24 and 2024-25, achieved in at least two financial years an annual financial turnover (in all classes of civil engineering construction works only) of Rs.471.50 Lakhs.
To qualify for award of this contract, each Tenderer in his/her name To qualify for award of this contract, each Tenderer in his name should have in the last five years i.e., 2020-21, 2021-22, 2022-23 2023-24 and 2024-25, satisfactorily completed as prime contractor, at least one similar work such as - CONSTRUCTION/ IMPROVEMENTS OF BITUMINOUS ROAD WORKS not less than Rs.118.00 Lakhs.
To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2020-21, 2021-22, 2022-23 2023-24 and 2024-25, (c)executed in any one year, the following minimum quantities of work: (a)Earthwork Excavation/ Embankment/Subgrade : 4602.00 Cum, (b) Granular sub base : 341.00 Cum, (c) WBM/ WMM : 1199.00 Cum, (d) DBM/BM/BC/SDBC - 389.00 Cum, (e) PCC/ RCC : 486.00 Cum and (f) Steel : 32.75 MT.
Liquid Assets and /or availability of credit facilities of not less than Rs.78.60 Lakhs (Credit Lines/letter of credit/ certificates from the banks for meeting the fund requirement etc.,)
Principal Place of Business.
Information on Existing commitments and on going works which are yet to be completed
Information of the works for which Tender acceptance letters are received.
Information of the works for which Tenderer has submitted Tender
Information on litigation in which the Tenderer is involved
Constitutional or Legal Status of the Tenderer.
Principal Place of Business.
Copy of Registration for having registered in KPWD
Detailed information on committed offers of works on hand and ongoing works which are yet to be completed
Detailed information of the works for which Tenderer has submitted his tender in different departments either Central or State.
₹5,000
₹3.5 L
13 Oct 2025
30 Sept 2025
14 Oct 2025
8 Oct 2025
3 Oct 2025
Flexible pavement
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable ...
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, arricading, caution lig...
Compacting original ground supporting embankment : Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth o...
Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded with desired compaction. (Royalty shall be...
Construction of Sub Grade and Earthen shouders
Construction of sub-grade and earthen shoulders with approved material Gravel/Murrum with all lifts & leads, transporting to site, spreading, grading to ...
Granular Sub-Base
A Plant Mix Method Construction of Granular Sub-Base of required grading as per design mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in ...
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carria...
Prime Coat over WMM/WBM Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0....
Tack coat on Bituminous surface Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned w...
Bituminous Macadam Grading - II for traffic 20 MSA Providing and laying Bituminous Macadam with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading premixed with bituminous ...
Semi Dense Bituminous Concrete Providing and laying Semi Dense Bituminous Concrete with 40/60 TPH capacity hot mix plant batch type using crushed aggregates of specified grading premixed with bitumino...
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:...
Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal ...
Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class B Type IV retro reflective sheeting fixed ove...
Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size mad...
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, arricading, caution lig...
Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS...
Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material i...
Construction of Embankment by excavating the available approved Gravel/
Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreadin...
One Vent Pipe Culverts 2 No at ch 0.862 km & and 0.872 km
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete,wood work, steel work, including T&P and scaffolding wherever nece...
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, arricading, caution lig...
Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS...
Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 ...
Form work ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work,...
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation,...
Construction of Sub Grade and Earthen shouders
Construction of sub-grade and earthen shoulders with approved material Gravel/Murrum with all lifts & leads, transporting to site, spreading, grading to ...
Painting on concrete surface Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applyin...
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, arricading, caution lig...
Providing bedding for the pipeline trenches in black cotton and rock reaches including watering and consolidation by punners etc. complete with all lead and lift with Murrum. ---- with all lead, lifts...
Providing UNPLASTICISED PVC pipes conforming to IS 16098:2013
with latest amendments ended with integral sockets with ISI mark and conveying to worksite, rolling and lowering into trenches, laying tru...
Providing UNPLASTICISED PVC pipes conforming to IS 16098:2013
with latest amendments ended with integral sockets with ISI mark and conveying to worksite, rolling and lowering into trenches, laying tru...
Providing and constructing of Machinehole chambers conical in shape at top with CC 1:3:6 foundation using 40mm and down size graded metal of approved quality and with an offset of 0.15m alround the ch...
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by r...
Utility Pipes and Ducts
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, arricading, caution lig...
conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and unloading at both destinations and rolling and lowering into trenches, laying true to line and joint...
Providing and installing at site of work P.V.C. pipes including cost of pipes and specials and labour, including lowering into trenches, laying true to line, level and perfect linking at joints leak p...
Supply and delivery at site special moulded variety PVC service saddles Supply and delivery at site special moulded variety PVC service saddles as per IS 7834/ 1987 and fabricated as per IG124/ 1984 w...
Supply and delivery at site special moulded variety PVC tee as per IS
7834/ 1987 and fabricated as per IG124/ 1984 with ISI mark with its
latest amendments ---- with all lead, lifts, loading, un-loadi...
Cable Duct Across the Road Providing and laying of a reinforced cement concrete pipe duct, 300 mm dia, across the road (new construction), extending from drain to drain in cuts and toe of slope to toe...
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by r...
protection wall on LHS ch 0.640 to 0.790, 0.880 Km to 1.020Km and 1.06Km to 1.098 Km
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, arricading, caution lig...
Supplying, filling, spreading & leveling stone boulders of size range 5cm to 20 cm, in recharge pit, in the required thickness, for all leads & lifts, all complete as per direction of Engineer-in-char...
Construction of Embankment by excavating the available approved Gravel/
Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreadin...
Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS...
Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with supe...
Appendix I Additionalities for Formwork, Centering & Scaffolding -Foundation upto Plinth b. All other types 3% (volume-1 Pg No:111) For Retaining Wall Raf ---- with all lead, lifts, loading, un-loadi...
Providing and laying in Cement Concrete for all Basement & surface level works, return walls, retaining walls, sunken floors etc. The granite/trap/ basalt crushed graded coarse aggregates and fine agg...
Appendix I Additionalities for Formwork, Centering & Scaffolding -SI.No.11- Earth Retaining structures 10% (volume-1 Pg No:112) For protection Wall Stem ---- with all lead, lifts, loading, un-loading...
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...
Back filling behind abutment, wing wall and return wall
complete including compaction as per drawing and Technical
Specification . A Granular material 710.1.4.of IRC:78 &2200 ---- with all lead, lifts...
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towar...
Painting on concrete surface Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applyin...
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by r...
Boundary pillar / Guard Stone:- Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting ----...
Maintenance of road
Road Maintenance for 3rd year for road with BM+SDBC as wearing coat Maintenance of road for 3rd year by clearing and uprooting vegetation on either sides of the road, Maintenance od surface drains by ...
Road Maintenance for 4th year for road with BM+SDBC as wearing coat Maintenance of road for 4th year by clearing and uprooting vegetation on either sides of the road, Maintenance od surface drains by ...
Road Maintenance for 5th year for road with BM+SDBC as wearing coat Maintenance of road for 5th year by clearing and uprooting vegetation on either sides of the road, Maintenance od surface drains by ...
Electrical work
RCC Pole - 9 Mtr Long, 145 Kg WL ELE SR 2023-24, ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineri...
Labour charges ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of ...
Horizontal X-arms with HTSTS ELE SR 2023-24, ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transp...
Labour charges ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of ...
9Mtr Long Rcc Pole DP Set Complete with Poles ELE SR 2023-24, (Page No- 1, BESCOM V Cost Data Sheet-1,) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost ...
Labour charges ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of ...
11 kV, 5 kN Composite/Polymeric Pin Insulator ELE SR 2023-24, ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportat...
LT 4 Pin Cross Arm with clamps, bolts, nuts and
washers ELE SR 2023-24, ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, tr...
Labour charges ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of ...
1.1 kV Ceramic Pin Insulator (Shell only) ELE SR 2023-24, ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transpo...
1.1 kV GI Pin for 1.1 kV Ceramic Shell Insulator ELE SR 2023-24, ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transport...
No.8 Strain Insulator ELE SR 2023-24, ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineri...
No.15 Strain Insulator ELE SR 2023-24, ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries...
Labour charges ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of ...
45 KN Disk Insulators ELE SR 2023-24, ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineri...
Releasing & Restringing of Conductor ELE SR 2023-24, (Page No- 3, BESCOM IV ,) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, ...
Labour charges ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of ...
Spiral Earth Electrode ELE SR 2021-22, ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machinerie...
Labour charges ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of ...
Fish Plate-MS ELE SR 2021-22, ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machin...
Labour charges ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of ...
Anchor Raod using 12mm round/G ELE SR 2021-22 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transpor...
Labour charges ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of ...
Turn buckle (GI) ELE SR 2021-22, ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machiner...
Labour charges ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of ...
G.I Grounding pipe,B-Class, 4 ELE SR 2021-22, ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, tr...
Labour charges ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of ...
PART-B DISTRIBUTION TRANSFORMER
Erection of Double Pole Transformer Structure using 9 Mtr Long RCC (145 Kg WL)/PSCC (300 Kg WL) Pole including fixing of Structure Materials, Erection of Poles etc., complete for mounting of Transform...
Releasing of 3-ph, 11 kV/433V 100-250KVA Distribution Transformer
"90% of the Pole
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of ...
Releasing & Fixing of DOLO ELE SR 2023-24, (Page No- 5, BESCOM IV ,)
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, tran...
Releasing & Fixing of LT Kit ELE SR 2023-24, (Page No- 5, BESCOM IV ,)
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, tr...
Releasing & Fixing of 200A GOS ELE SR 2023-24, (Page No- 5, BESCOM IV ,)
---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, ...
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
22199 CALL-3 Bid Documnet KW-4.doc
Tender Document • 1.61 MB
2018-19(e) krbs-section 600 - 900.rar
Others - Specification • 24.16 MB
krbs-facing sheet.rar
Others - Specification • 0.00 MB
2018-19(a) krbs-foreword.rar
Others - Specification • 0.01 MB
2018-19(b) krbs-index.rar
Others - Specification • 0.01 MB
2018-19(c) krbs-detailed index.rar
Others - Specification • 0.10 MB
2018-19(d) krbs-section 100 - 500.rar
Others - Specification • 13.33 MB
eproc_formats(new).xls
Instructions to Tenderers • 0.11 MB
bridgeculvertspecification.pdf
Others - Specification • 1.80 MB
road specific.pdf
Others - Specification • 1.52 MB
environemnt management system - regulatory requirements.doc
Others - EMS • 0.21 MB
2018-19(g) krbs-section 2400 - 3100 & appendices 1 - 23.rar
Others - Specification • 40.88 MB
2018-19(f) krbs-section 1000 - 2300.rar
Others - Specification • 20.00 MB
emd-bank gurantee format.doc
Others - EMD BG • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .