Tender Value
₹31.2 L
EMD Value
₹31,200
Closing Date
22 Feb 2022, 11:00 amClosed
The Chief Engineer, PWD (NH), Nagaland, Kohima
O/o The Chief Engineer, PWD (NH), Nagaland, Kohima
FDR works on NH-702 under National Highways Division-V, Mon Nagaland during 2021-22
2022_MoRTH_673513_1
CE/NH/FDR/2021-22/Mon
Open Tender
Civil Works - Highways
Item Rate
90 days
Kohima
Please refer Tender Documents
4 documents required · 4 mandatory
₹0
₹31,200
24 Feb 2022
14 Feb 2022
23 Feb 2022
14 Feb 2022
22 Feb 2022
14 Feb 2022
Amount
Land slide clearance in soil (Clearance of Land slide in soil and ordinary rock by bull-dozer D 80 A-12, 180 HP and disposal of the same on the valley side)
Contruction of Sausage Wall:- Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.-Ordinary soil
Boulder apron laid in wire crates (Providing and laying of boulder apron laid in wire crates made with 4mm dia GI wire conforming to IS: 280 & IS:4826 in 100mm x 100mm mesh (weaved diagonally) including 10% extra for laps and joints laid with stone boulders weighing not less than 40 kg each.)
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification. Granular material
Construction of Hume Pipe Culvert:- Excavation of soil by manual. Earthwork excavation for foundation of structure as per drawing and tech. specn.,including setting out,const.of shoring and bracing, removal of stumps and other deleterious matters, dressing of sides and bottom and backfilling with approved materials. (I) Ordinary soil by manual means up to 3m Depth
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications. PCC M15 Grade Case -II
Stone masonry work in cement mortar 1:3 in foundation complete as drawing and Technical Specification
Laying RCC Pipe NP4 in first class bedding in single row. (Laying Reinforced cement concrete pipe NP4/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapet). 1200 mm dia
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification
M/s A.Neangba
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .