Executive Engineer JSD PHE Mech Rural Division Sgr
Executive Engineer JSD PHE Mech Rural Division Sgr
For fixing of rate contract for repairs to various capacities of HT/LT Distribution Transformers at various WSSs of District Ganderbal, Budgam and Srinagar for one year
2022_PHE_187347_1
PHE/MRD/TS/ 80 of 09/2022
Open Tender
Miscellaneous Works
Item Rate
5 days
Srinagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Executive Engineer JSD PHE Mech Rural Division Sgr
₹15,000
Executive Engineer JSD PHE Mech Rural Division Sgr
6 Oct 2022
7 Sept 2022
28 Sept 2022
7 Sept 2022
27 Sept 2022
7 Sept 2022
17 Sept 2022
Amount
Repairs to 25KVA HT/LT Transformer with respect following works (11/0.44 KV)
Disconnecting from active HT circuit, transportation of damaged transformers from water supply scheme to contractors workshop, loading / unloading of damaged transformers at respective locations, arranging for inspections, opening bolt-nuts of top cover, opening of the top plate, assessment of repairs, disconnecting of leads/connections, cleaning all healthy parts, removal of core yoke and windings and re-assembling of the dismantled materials and metal parts and positioning the core back after repairs, winding and complete electrical connections, bolting up top cover after filtration and top-up /filling-up of transformer oil and other fittings on cover or tank. Testing on no load and full load at testing bay of workshop, loading of repaired transformer from workshop, transportation and unloading at installation site, connecting to HT circuit, testing on no load and then on full load
Providing / Fitting of HV winding (Aluminum)
Providing / Fitting of LV Winding (Aluminum)
Providing / Fitting of HV Porcelain bushings
Providing / Fitting of HV terminal Bolt with 4 nuts and washer.
Providing / Fitting of LV Bushing.
Providing / Fitting of LV terminal Bolt with 4 nuts and washer.
Providing / Fitting of Top cover gasket and gaskets of oil gauge, breather cap, oil cap etc.
Providing / Fitting of HV/LV rod gaskets eg. flat gasket, D-bush, cone bush
Providing / Fitting of Breather with Silica Gel
Providing / Fitting of Drain Valve and Filter Valve with Plug
Providing / Fitting of CRGO Lamination of grade M4 or M3
Providing / Fitting of Explosion vent
Providing / Fitting of Core Bolt with insulation
Providing / Fitting of Insulating materials such as Press Board, Cotton Tape, Kraft Paper
Providing / applying of Paint of Tank as per IEE rules
Providing / Fitting of MS bolts and Nuts, washers, spring washers of different size
Providing / Fitting of Connection Wire (copper)
Providing / Fitting of Soldering Lead + Flux + Brazing Rod
Providing / Fitting of SRBP Tube
Providing / Fitting of Lid bolts
Providing / filling of Insulating media (Toil) of 40 KVA grade dielectric strength of 5 KV at 1mm air gap
Welding of tank and other parts at the point of leakages near leaking bushes
Cost on account of Drying of active parts by opening for 48 to 72 hours at heated premises for removal of moisture of the repaired Transformer
Cost on account of Oil filtering to remove carbon content and other desired impurities
Cost of scrap windings (aluminum)
Damaged brass parts
Cost of scrap Iron /MS
Repairs to 63KVA HT/LT Transformer with respect following works (11/0.44 KV)
Disconnecting from active HT circuit, transportation of damaged transformers from water supply scheme to contractors workshop, loading / unloading of damaged transformers at respective locations, arranging for inspections, opening bolt-nuts of top cover, opening of the top plate, assessment of repairs, disconnecting of leads/connections, cleaning all healthy parts, removal of core yoke and windings and re-assembling of the dismantled materials and metal parts and positioning the core back after repairs, winding and complete electrical connections, bolting up top cover after filtration and top-up /filling-up of transformer oil and other fittings on cover or tank. Testing on no load and full load at testing bay of workshop, loading of repaired transformer from workshop, transportation and unloading at installation site, connecting to HT circuit, testing on no load and then on full load
Providing / Fitting of HV winding (Aluminum)
Providing / Fitting of LV Winding (Aluminum)
Providing / Fitting of HV Porcelain bushings
Providing / Fitting of HV terminal Bolt with 4 nuts and washer.
Providing / Fitting of LV Bushing.
Providing / Fitting of LV terminal Bolt with 4 nuts and washer.
Providing / Fitting of Top cover gasket and gaskets of oil gauge, breather cap, oil cap etc.
Providing / Fitting of HV/LV rod gaskets eg. flat gasket, D-bush, cone bush
Providing / Fitting of Breather with Silica Gel
Providing / Fitting of Drain Valve and Filter Valve with Plug
Providing / Fitting of CRGO Lamination of grade M4 or M3
Providing / Fitting of Explosion vent
Providing / Fitting of Core Bolt with insulation
Providing / Fitting of Insulating materials such as Press Board, Cotton Tape, Kraft Paper
Providing / applying of Paint of Tank as per IEE rules
Providing / Fitting of MS bolts and Nuts, washers, spring washers of different size
Providing / Fitting of Connection Wire (copper)
Providing / Fitting of Soldering Lead + Flux + Brazing Rod
Providing / Fitting of SRBP Tube
Providing / Fitting of Lid bolts
Providing / filling of Insulating media (Toil) of 40 KVA grade dielectric strength of 5 KV at 1mm air gap
Welding of tank and other parts at the point of leakages near leaking bushes
Cost on account of Drying of active parts by opening for 48 to 72 hours at heated premises for removal of moisture of the repaired Transformer
Cost on account of Oil filtering to remove carbon content and other desired impurities
Cost of scrap windings (aluminum)
Damaged brass parts
Cost of scrap Iron /MS
Repairs to 100KVA HT/LT Transformer with respect following works (11/0.44 KV)
Disconnecting from active HT circuit, transportation of damaged transformers from water supply scheme to contractors workshop, loading / unloading of damaged transformers at respective locations, arranging for inspections, opening bolt-nuts of top cover, opening of the top plate, assessment of repairs, disconnecting of leads/connections, cleaning all healthy parts, removal of core yoke and windings and re-assembling of the dismantled materials and metal parts and positioning the core back after repairs, winding and complete electrical connections, bolting up top cover after filtration and top-up /filling-up of transformer oil and other fittings on cover or tank. Testing on no load and full load at testing bay of workshop, loading of repaired transformer from workshop, transportation and unloading at installation site, connecting to HT circuit, testing on no load and then on full load
Providing / Fitting of HV winding (Aluminum)
Providing / Fitting of LV Winding (Aluminum)
Providing / Fitting of HV Porcelain bushings
Providing / Fitting of HV terminal Bolt with 4 nuts and washer.
Providing / Fitting of LV Bushing.
Providing / Fitting of LV terminal Bolt with 4 nuts and washer.
Providing / Fitting of Top cover gasket and gaskets of oil gauge, breather cap, oil cap etc.
Providing / Fitting of HV/LV rod gaskets eg. flat gasket, D-bush, cone bush
Providing / Fitting of Breather with Silica Gel
Providing / Fitting of Drain Valve and Filter Valve with Plug
Providing / Fitting of CRGO Lamination of grade M4 or M3
Providing / Fitting of Explosion vent
Providing / Fitting of Core Bolt with insulation
Providing / Fitting of Insulating materials such as Press Board, Cotton Tape, Kraft Paper
Providing / applying of Paint of Tank as per IEE rules
Providing / Fitting of MS bolts and Nuts, washers, spring washers of different size
Providing / Fitting of Connection Wire (copper)
Providing / Fitting of Soldering Lead + Flux + Brazing Rod
Providing / Fitting of SRBP Tube
Providing / Fitting of Lid bolts
Providing / filling of Insulating media (Toil) of 40 KVA grade dielectric strength of 5 KV at 1mm air gap
Welding of tank and other parts at the point of leakages near leaking bushes
Cost on account of Drying of active parts by opening for 48 to 72 hours at heated premises for removal of moisture of the repaired Transformer
Cost on account of Oil filtering to remove carbon content and other desired impurities
Cost of scrap windings (aluminum)
Damaged brass parts
Cost of scrap Iron /MS
Repairs to 250KVA (Aluminium wound) HT/LT Transformer with respect following works (11/0.44 KV)
Disconnecting from active HT circuit, transportation of damaged transformers from water supply scheme to contractors workshop, loading / unloading of damaged transformers at respective locations, arranging for inspections, opening bolt-nuts of top cover, opening of the top plate, assessment of repairs, disconnecting of leads/connections, cleaning all healthy parts, removal of core yoke and windings and re-assembling of the dismantled materials and metal parts and positioning the core back after repairs, winding and complete electrical connections, bolting up top cover after filtration and top-up /filling-up of transformer oil and other fittings on cover or tank. Testing on no load and full load at testing bay of workshop, loading of repaired transformer from workshop, transportation and unloading at installation site, connecting to HT circuit, testing on no load and then on full load
Providing / Fitting of HV winding (Aluminum)
Providing / Fitting of LV Winding (Aluminum)
Providing / Fitting of HV Porcelain bushings
Providing / Fitting of HV terminal Bolt with 4 nuts and washer.
Providing / Fitting of LV Bushing.
Providing / Fitting of LV terminal Bolt with 4 nuts and washer.
Providing / Fitting of Top cover gasket and gaskets of oil gauge, breather cap, oil cap etc.
Providing / Fitting of HV/LV rod gaskets eg. flat gasket, D-bush, cone bush
Providing / Fitting of Breather with Silica Gel
Providing / Fitting of Drain Valve and Filter Valve with Plug
Providing / Fitting of CRGO Lamination of grade M4 or M3
Providing / Fitting of Explosion vent
Providing / Fitting of Core Bolt with insulation
Providing / Fitting of Insulating materials such as Press Board, Cotton Tape, Kraft Paper
Providing / applying of Paint of Tank as per IEE rules
Providing / Fitting of MS bolts and Nuts, washers, spring washers of different size
Providing / Fitting of Connection Wire (copper)
Providing / Fitting of Soldering Lead + Flux + Brazing Rod
Providing / Fitting of SRBP Tube
Providing / Fitting of Lid bolts
Providing / filling of Insulating media (Toil) of 40 KVA grade dielectric strength of 5 KV at 1mm air gap
Welding of tank and other parts at the point of leakages near leaking bushes
Cost on account of Drying of active parts by opening for 48 to 72 hours at heated premises for removal of moisture of the repaired Transformer
Cost on account of Oil filtering to remove carbon content and other desired impurities
Cost of scrap windings (aluminum)
Damaged brass parts
Cost of scrap Iron /MS
Repairs to 250KVA (Copper Wound) HT/LT Transformer with respect following works (11/0.44 KV)
Disconnecting from active HT circuit, transportation of damaged transformers from water supply scheme to contractors workshop, loading / unloading of damaged transformers at respective locations, arranging for inspections, opening bolt-nuts of top cover, opening of the top plate, assessment of repairs, disconnecting of leads/connections, cleaning all healthy parts, removal of core yoke and windings and re-assembling of the dismantled materials and metal parts and positioning the core back after repairs, winding and complete electrical connections, bolting up top cover after filtration and top up/filling up of transformer oil and other fittings on cover or tank. Testing on no load and full load at testing bay of workshop, loading of repaired transformer from workshop, transportation and unloading at installation site, connecting to HT circuit, testing on no load and then on full load
Providing / Fitting of HV winding Copper)
Providing / Fitting of LV Winding (Copper)
Providing / Fitting of HV Porcelain bushings
Providing / Fitting of HV terminal Bolt with 4 nuts and washer
Providing / Fitting of LV Bushing
Providing / Fitting of LV terminal Bolt with 4 nuts and washer
Providing / Fitting of Top cover gasket and gaskets of oil gauge, breather cap, oil cap etc.
Providing / Fitting of HV/LV rod gaskets eg. flat gasket, D bush, cone bush
Providing / Fitting of Breather with Silica Gel
Providing / Fitting of Drain Valve and Filter Valve with Plug
Providing / Fitting of CRGO Lamination of grade M4 or M3
Providing / Fitting of Explosion vent
Providing / Fitting of Core Bolt with insulation
Providing / Fitting of Insulating materials such as Press Board, Cotton Tape, Kraft Paper
Providing / applying of Paint of Tank as per IEE rules
Providing / Fitting of MS bolts and Nuts, washers, spring washers of different size
Providing / Fitting of Connection Wire (copper)
Providing / Fitting of Soldering Lead + Flux + Brazing Rod
Providing / Fitting of SRBP Tube
Providing / Fitting of Lid bolts
Providing / filling of Insulating media (Toil) of 40 KVA grade dielectric strength of 5 KV at 1mm air gap
Welding of tank and other parts at the point of leakages near leaking bushes
Cost on account of Drying of active parts by opening for 48 to 72 hours at heated primesis for removal of moisture of the repaired Transformer
Cost on account of Oil filtering to remove carbon content and other desired impurities
Cost of scrap windings (Copper)
Damaged brass parts
Cost of scrap Iron /MS
Repairs to 400KVA HT/LT Transformer with respect following works (11/0.44 KV)
Disconnecting from active HT circuit, transportation of damaged transformers from water supply scheme to contractors workshop, loading / unloading of damaged transformers at respective locations, arranging for inspections, opening bolt-nuts of top cover, opening of the top plate, assessment of repairs, disconnecting of leads/connections, cleaning all healthy parts, removal of core yoke and windings and re-assembling of the dismantled materials and metal parts and positioning the core back after repairs, winding and complete electrical connections, bolting up top cover after filtration and top up/filling up of transformer oil and other fittings on cover or tank. Testing on no load and full load at testing bay of workshop, loading of repaired transformer from workshop, transportation and unloading at installation site, connecting to HT circuit, testing on no load and then on full load
Providing / Fitting of HV winding Copper)
Providing / Fitting of LV Winding (Copper)
Providing / Fitting of HV Porcelain bushings
Providing / Fitting of HV terminal Bolt with 4 nuts and washer
Providing / Fitting of LV Bushing
Providing / Fitting of LV terminal Bolt with 4 nuts and washer
Providing / Fitting of Top cover gasket and gaskets of oil gauge, breather cap, oil cap etc.
Providing / Fitting of HV/LV rod gaskets eg. flat gasket, D bush, cone bush
Providing / Fitting of Breather with Silica Gel
Providing / Fitting of Drain Valve and Filter Valve with Plug
Providing / Fitting of CRGO Lamination of grade M4 or M3
Providing / Fitting of Explosion vent
Providing / Fitting of Core Bolt with insulation
Providing / Fitting of Insulating materials such as Press Board, Cotton Tape, Kraft Paper
Providing / applying of Paint of Tank as per IEE rules
Providing / Fitting of MS bolts and Nuts, washers, spring washers of different size
Providing / Fitting of Connection Wire (copper)
Providing / Fitting of Soldering Lead + Flux + Brazing Rod
Providing / Fitting of SRBP Tube
Providing / Fitting of Lid bolts
Providing / filling of Insulating media (Toil) of 40 KVA grade dielectric strength of 5 KV at 1mm air gap
Welding of tank and other parts at the point of leakages near leaking bushes
Cost on account of Drying of active parts by opening for 48 to 72 hours at heated primesis for removal of moisture of the repaired Transformer
Cost on account of Oil filtering to remove carbon content and other desired impurities
Cost of scrap windings (Copper)
Damaged brass parts
Cost of scrap Iron /MS
Repairs to 400KVA (Aluminium wound) HT/LT Transformer with respect following works (11/0.44 KV)
Disconnecting from active HT circuit, transportation of damaged transformers from water supply scheme to contractors workshop, loading / unloading of damaged transformers at respective locations, arranging for inspections, opening bolt-nuts of top cover, opening of the top plate, assessment of repairs, disconnecting of leads/connections, cleaning all healthy parts, removal of core yoke and windings and re-assembling of the dismantled materials and metal parts and positioning the core back after repairs, winding and complete electrical connections, bolting up top cover after filtration and top-up /filling-up of transformer oil and other fittings on cover or tank. Testing on no load and full load at testing bay of workshop, loading of repaired transformer from workshop, transportation and unloading at installation site, connecting to HT circuit, testing on no load and then on full load
Providing / Fitting of HV winding (Aluminum)
Providing / Fitting of LV Winding (Aluminum)
Providing / Fitting of HV Porcelain bushings
Providing / Fitting of HV terminal Bolt with 4 nuts and washer.
Providing / Fitting of LV Bushing.
Providing / Fitting of LV terminal Bolt with 4 nuts and washer.
Providing / Fitting of Top cover gasket and gaskets of oil gauge, breather cap, oil cap etc.
Providing / Fitting of HV/LV rod gaskets eg. flat gasket, D-bush, cone bush
Providing / Fitting of Breather with Silica Gel
Providing / Fitting of Drain Valve and Filter Valve with Plug
Providing / Fitting of CRGO Lamination of grade M4 or M3
Providing / Fitting of Explosion vent
Providing / Fitting of Core Bolt with insulation
Providing / Fitting of Insulating materials such as Press Board, Cotton Tape, Kraft Paper
Providing / applying of Paint of Tank as per IEE rules
Providing / Fitting of MS bolts and Nuts, washers, spring washers of different size
Providing / Fitting of Connection Wire (copper)
Providing / Fitting of Soldering Lead + Flux + Brazing Rod
Providing / Fitting of SRBP Tube
Providing / Fitting of Lid bolts
Providing / filling of Insulating media (Toil) of 40 KVA grade dielectric strength of 5 KV at 1mm air gap
Welding of tank and other parts at the point of leakages near leaking bushes
Cost on account of Drying of active parts by opening for 48 to 72 hours at heated premises for removal of moisture of the repaired Transformer
Cost on account of Oil filtering to remove carbon content and other desired impurities
Cost of scrap windings (aluminum)
Damaged brass parts
Cost of scrap Iron /MS
M/s SAJID ENGINEERING WORKS
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .