| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.6 CrAccepted-AOC 119 A 1 BAGHAJATIN REGENT ESTATE SOUTH 24 PARGANAS KOLKATA WEST BENGAL 700092 | KOLKATA | WEST BENGAL | 700092 | ₹6.6 Cr Quoted ₹5,235 | L1 | Accepted-AOC L1 |
| 2 | L2₹3.3 CrAccepted-AOC 16 RADHANATH CHOWDHURY ROAD KOLKATA WEST BENGAL 700015 | KOLKATA | WEST BENGAL | 700015 | ₹3.3 Cr Quoted ₹5,250 | L2 | Accepted-AOC L2 |
| 3 | L3₹82.6 LAccepted-AOC VILL MIRPUR MONDAL PARA P O CHAK ENAYETNAGAR P S BISHNUPUR DIST 24 PGS SOUTH PIN 743503 | 24 PARAGANAS SOUTH | WEST BENGAL | 743503 | ₹82.6 L Quoted ₹5,290 | L3 | Accepted-AOC L3 |
| 4 | L4₹1.7 CrAccepted-AOC 487 A 1 GOPAL MISHRA ROAD BEHALA KOLKATA 700034 | KOLKATA | WEST BENGAL | 700034 | ₹1.7 Cr Quoted ₹5,970 | L4 | Accepted-AOC L4 |
Tender Value
Refer Docs
EMD Value
₹1.3 L
Closing Date
28 Mar 2024, 2:00 pmClosed
Director General (S and D)
5, S.N Banerjee Road Kolkata-700 013
Contractual operation and maintenance of 15 nos. 3 in 1 machine (Manhole de-silting cum jetting cum suction) for a period of five years under north, central and south division of sewer cleansing wing under S and D department.
2024_KMC_679869_1
KMC/S and D/SCD(C)/2023-24/19
Open Tender
MECHANICAL
1825 days
KMC Area
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹1.3 L
Office of the DG (S and D)
19 Mar 2025
6 Mar 2024
30 Mar 2024
7 Mar 2024
28 Mar 2024
7 Mar 2024
15 Mar 2024
Amount
Rate should be quoted on per shift per machine basis (8hour). Rate should be inclusive provision of engagement of one Driver of Highly Skilled category and Two Helpers of Skilled category for each machine. Cost of CNG, Engine Oil, Hydraulic Oil, all type of maintenance both of major or minor including cost of spare parts, Tyre, Tube etc as mentioned details in maintenance schedule are in the part of bidder. The rate should be inclusive cost of necessary safety equipment’s like uniform, gumboot, PVC hand gloves, helmet, medicated mask etc. Rate should be inclusive provision of engagement of one Supervisor against per two machines and inclusive all types of taxes if any. Bidder should also considered jetting and suction hose end fitting(socketing). Everything of this contract are in the part of bidder. The period of contract is for five years, so the bidder should quote their rate accordingly. For estimation purpose bidder may consider CNG consumption rate @approx 3.5 Kg per hour and 24 average working days in a month.
RAJ CONSTRUCTION
R S SARDAR SHEET METAL ENG WORKS
STAR ENTERPRISE
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid