Tender Value
₹3.0 L
EMD Value
₹5,950
Closing Date
17 Jun 2026, 2:00 pm
EXECUTIVE ENGINEER (W/S) , GRWW
OFFICE OF THE EXECUTIVE ENGINEER (WATER SUPPLY) GARDEN REACH WATER WORKS, BIDHANGARH, KOL-66
STRENGTHENING OF TWO NOS. 1500 MM DIA PSC, CC GRID INCLUDING ONE MS CLEAT OPPOSITE TO WEST BENGAL TRANSPORT CORPORATION MAIN GATE AND ANOTHER NEAR MODERN FOOD ON TARATALA ROAD.
2026_KMC_1025983_1
EEWS/KMC/GRWW/26-27/20
Open Tender
MECHANICAL
10 days
ON TARATALA ROAD
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹5,950
1 Jun 2026
1 Jun 2026
19 Jun 2026
1 Jun 2026
17 Jun 2026
1 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches levelling, dressing and
ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm | - | CUBIC METER PERCENT | 119.27 | - | item1 |
| 2 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches levelling, dressing and ramming the bottom, bailing out water as required complete (b) Depth of excavation for additional depth beyond 1,500 mm. and upto 3,000 mm. but not requiring shoring | 0.84 | CUBIC METER PERCENT | 192.38 | ₹161.6 | item2 |
| 3 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches levelling, dressing and
ramming the bottom, bailing out water as required complete (c)Depth of excavation for additional depth
beyond 3000 mm. upto 4000mm. excluding cost of shoring as necessary. | 1 | CUBIC METER PERCENT | 234.7 | ₹234.7 | item3 |
| 4 | Hire and labour charges for shoring work (including necessary close plank walling, framing, Eucalyptus/Jhou bulla piling, strutting etc) complete as
per direction of the Engineer-in charge for foundation excavation (vertical surface are in contact with supported earth is to be measured.) (This item should be executed on specific direction of the Enginner in charge).(a) Depth upto 1.5 m. | 46.8 | SQUARE METER | 386 | ₹18,064.8 | item4 |
| 5 | Hire and labour charges for shoring work (including necessary close plank walling, framing, Eucalyptus/Jhou bulla piling, strutting etc) complete as
per direction of the Engineer-in charge for foundation excavation (vertical surface are in contact with supported earth is to be measured.) (This item should be executed on specific direction of the Enginner in charge).(b) Depth upto 1.5 m. upto 3.0 m | 0.2 | SQUARE METER | 439 | ₹87.8 | item4 |
| 6 | Hire and labour charges for shoringwork (including necessary close plank walling, framing, Eucalyptus/Jhou bulla piling, strutting etc) complete as
per direction of the Engineer-in charge for foundation excavation (vertical surface are in contact with supported earth is to be measured.) (This item should be executed on specific direction of the Enginner in charge)(c) For additional depth beyond 3.00 m. | - | SQUARE METER | 498 | - | item6 |
| 7 | Hire and labour charges for 100 mm dia bamboo railing on 150 mm dia Jhau/Eucalyptus or other approved timber posts each 2.0 m in length, tied 2 number post strongly with coir ropes in the fashion of a scissor with a spacing of 1.8 m over pacca road without damaging the surface and tying strongly 3 (three) rows of bamboo railing on each leg and 1 (one) railing connecting all the pivot junctions including cost of loading unloading, stacking & carriage of all materials and labour complete, and maintaining barricading for a period beyond 5 (five) days after the reported & recorded time of completion of the entire work to the satisfaction of Engineer-in- Charge. (Note: This work should not be executed without specific permission of Superintending Engineer). (100 mm. dia bamboo railing & 150mm. dia Jhau/Eucalyptus/other approved timber posts @ 1.80m apart). (ii) Railing 3 row on each leg and 1 at pivot point. | 44 | METER | 178 | ₹7,832 | item7 |
| 8 | Sealing of uneven gap in PSC Socket/spigot joint by insertion of 19 mm thick asbestos graphite packing (AMP-32) including supplying. fitting and fixing all complete | 1 | METER | 870 | ₹869.13 | item9 |
| 9 | Cutting to requisite length or shape departmental R.S.Joists, channels, angles, tees, plates etc. (Payment to be made on area of cut surface) | 3,287.96 | SQUARE CENTIMETER | 8 | ₹26,303.68 | item9 |
| 10 | Welding in M.S.structural work with gas or electric: (a) Tack weld | 110 | POINT | 9 | ₹990 | item9 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.32 MB
BOQ_2520811.xls
BOQ • 0.36 MB
TBID20.pdf
Tender Documents • 0.56 MB
OIDDETAILS.pdf
Additional Documents • 0.68 MB
Download all tender documents and submit your bid