Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹52.1 LAccepted-AOC BINA BUS STAND PO BINA DISTT SONEBHADRA U P 231220 | SONBHADRA | UTTAR PRADESH | 231220 | L1 | Accepted-AOC L1 | |
| 2 | L2₹53.7 L+₹1.6 L (3.02%)Rejected-Finance | L2 | Rejected-Finance Not L1 | |
| 3 | L3₹55.0 L+₹2.9 L (5.53%)Rejected-Finance GT ROAD UKHRA BARDHAMAN PASCHIM BARDHMAN WEST BENGAL 713363 | UKHRA | PASCHIM BARDHMAN | WEST BENGAL | 713363 | L3 | Rejected-Finance Not L1 | |
| 4 | Rejected-Technical | - | Rejected-Technical Rejected |
Tender Value
₹52.4 L
EMD Value
₹65,500
Closing Date
22 Nov 2025, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Area Engineer (Civil), Jhanjra Area
Office of the General Manager, Jhanjra Area, PO - Jhanjra (BO), PIN - 713385
Cleaning and deepening of pond at Old Colony Jhanjra.
2025_ECL_346804_1
GM/JNR/CIVIL/e-Tender/25-26/18 Date 03-11-2025
Open Tender
Civil Works - Others
Percentage
75 days
Jhanjra
Please refer Tender documents.
5 documents required · 5 mandatory
₹65,500
21 Aug 2026
6 Nov 2025
24 Nov 2025
6 Nov 2025
22 Nov 2025
7 Nov 2025
6 Nov 2025 - 15 Nov 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Based on analysis | - | - | - | - |
| 2 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. | 9,000 | M2 | 10.8 | ₹97,200 |
| 3 | Banking excavated earth by mechanical I manual means in layers not exceeding 20 cm in depth, breaking clods, watering, rolling each layer with 'A tonne roller, or wooden or steel rarnmers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up, in embankments for roads, food banks, marginal banks, and guide banks etc., lead upto 50 m and for all lift : All kinds of soil | 1,968.75 | M3 | 131.3 | ₹2,58,496.88 |
| 4 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 73.41 | M3 | 188.75 | ₹13,856.14 |
| 5 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. All kinds of soil | 3,682.5 | M3 | 128.35 | ₹4,72,648.88 |
| 6 | Filling available excavated earth (excluding rock) in trenches, plinth. sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and for all lift | 27.9 | M3 | 121.05 | ₹3,377.29 |
| 7 | Felling trees of the girth (measured at a height of 1 m above ground level), including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. Beyond 30 cm girth upto and including 60 cm girth | 8 | EA | 327.5 | ₹2,620 |
| 8 | Felling trees of the girth (measured at a height of 1 m above ground level), including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. Beyond 60 cm girth upto and including 120 cm girth | 9 | EA | 1,457.9 | ₹13,121.1 |
| 9 | Felling trees of the girth (measured at a height of 1 m above ground level), including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. Beyond 120 cm girth upto and including 240 cm girth | 4 | EA | 6,763 | ₹27,052 |
| 10 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 39.58 | M3 | 1,061.6 | ₹42,018.13 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.85 MB
Tendernotice_2.pdf
PDF • 1.11 MB
Tendernotice_1.pdf
Tender Document • 1.85 MB
Tendernotice_2.pdf
Tender Document • 1.11 MB
BOQ_359494.xls
BOQ • 0.32 MB
BOQ_359494.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .