Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance MECHATRONICS HOUSE MUMBAI BANGALORE BYPASS HIGHWAY WARJE PUNE MAHARASHTRA 411058 | PUNE | MAHARASHTRA | 411058 | Admitted-Finance |
| 2 | Admitted-Finance 109 KUSAL BAZAR 32 33 NEHRU PLACE NEW DELHI SOUTH DELHI DELHI 110019 | SOUTH EAST DELHI | DELHI | 110019 | Admitted-Finance |
| 3 | Rejected-Technical B 46 INDUSTRIAL AREA SECTOR 59 NOIDA UP 201301 | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201301 | Rejected-Technical Disqualified |
Tender Value
Refer Docs
Closing Date
5 May 2022, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE,Hydrology Project Div Kalva Thane
Office of EE, Hydrology Project Div Opp Sahakar Vidylaya old Mumbai Pune Road Kalva Thane 400605
SUPPLY, INSTALLATION, TESTING, COMMISSIONING AND MAINTENANCE OF ADDITIONAL REAL TIME DATA ACQUISITION SYSTEM FOR WESTWARD FLOWING RIVERS BASINS IN KONKAN REGION.
2022_PAHN_785559_1
NCB E-TENDER NOTICE NO. 09/2021-22
Open Tender
Civil Works - Others
Item Rate
270 days
Kalwa
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
Exempted
16 Jun 2022
30 Mar 2022
6 May 2022
30 Mar 2022
5 May 2022
30 Mar 2022
45 days
Amount
PART A. PRICE SCHEDULE FOR SUPPLY OF GOODS AS PER SCHEDULE OF REQUIREMENT
Line Item No 1: Automated Rain Gauge (ARG) Sensor Equipment set necessary hardware as per technical specifications
Line Item No 2: Automated Weather station (AWS) comprising of following equipment:
2a: Air Temperature & Relative Humidity sensor, cable with Radiation shield, Equipment set necessary hardware as per technical specifications
2b: Wind speed & wind direction sensor and cable set necessary hardware as per technical specifications
2c: Atmospheric Pressure sensor and cable set necessary hardware as per technical specifications
2d: Solar Radiation sensor and cable set necessary hardware as per technical specifications
Line Item No 3: Automated River Water Level (stage) and River Discharge Stations(GD): Automated Water Level Recorder (non-contact-RADAR) for River/ Canals/ Reservoirs having 35 m range with all necessary hardware as per technical specifications
Line Item No 4: Automated Reservoir Water Level and Outflow Discharge Stations on Radar type water Level:
4a: Automated Water Level Recorder (non-contact-RADAR) for River/ Canals/ Reservoirs having 35 m range with all necessary hardware as per technical specifications
4b: Automated Water Level Recorder (non-contact-RADAR) for River/ Canals/ Reservoirs having 70 m range with all necessary hardware as per technical specifications
Line Item No 5: Shaft Encoder based rotary Gate position sensor for monitoring of Spillway gates, Intake Gates, Silt flushing gates including cabling & integration with datalogger as per technical specifications.
Line Item No 6:
6a: Data Loggers with 2AI channels, with INSAT, GSM & GPRS based telemetry, Antenna including all necessary equipment for data transmission as per technical specifications.
6b: Supply of Solar panel for ARG and/or AWLR system with all connectors, cables and conduit as per technical specifications
6c: Supply of Battery, charger regulator for ARG and/or AWLR system with all interconnecting connectors, cables for DCP as per technical specifications
6d: Supply of NEMA4X OR Equivalent Enclosure box to suit master unit equipment with locking, other ancillary equipment, fittings earthling, lightening arrestor with all connectors, cables and conduit for cables, mast to mount DCP for ARG and/or AWLR system, sensor mount complete as per technical specifications
Line Item No 7:
7a: Data Logger with 8AI channels, with INSAT, GSM & GPRS based telemetry, Antenna including all necessary equipment for data as per technical specifications.
7b: Supply of Solar panel with all connectors for AWS / Gate positon monitoring system, cables and conduit for cables as per technical specifications
7c: Supply of Battery, charger regulator connectors for AWS / Gate positon monitoring system with all interconnecting connectors, cables for DCP as per technical specifications
7d: Supply of NEMA4X OR Equivalent Enclosure box to suit master unit equipment with locking, other ancillary equipment, fittings earthling, lightening arrestor with all connectors, cables and conduit for cables, connectors, mast to mount DCP for Gate positon monitoring system, sensor mount complete as per technical specifications
7e: Supply of NEMA4X OR Equivalent Enclosure box to suit master unit equipment with locking, other ancillary equipment, fittings earthling, lightening arrestor with all connectors, cables and conduit for cables, connectors, 10mts triangular Tower with guy rope support to mount DCP for AWS system, sensor mount complete as per technical specifications
Line Item No 8: Set of Data Center Equipment including design, manufacture, testing, delivery at State Data Center (SDC), Nashik and complete with associated interface wiring, termination, commissioning, site acceptance testing, etc. as per technical specifications to collect and store the data received from proposed RTDAS Computer Node (Workstation) along with Monitor at Divisional office and necessary all accessories as per technical specifications.
PART B. PRICE AND COMPLETION SCHEDULE - RELATED SERVICES
Service N0. S1 : Automated Rain Gauge Station comprising of following Related Services: Installation, Testing & Commissioning of Automated Rain Gauge (ARG) sensor Equipment set as per technical specifications
Service N0. S2 : Automated Weather station (AWS) comprising of following Related Services:
S2a: Installation, Testing & Commissioning of Air Temperature & Relative Humidity sensor, cable with Radiation shield, Equipment set necessary hardware as per technical specifications
S2b: Installation, Testing & Commissioning of Wind speed & wind direction sensor and cable set necessary hardware as per technical specifications
S2c: Installation, Testing & Commissioning of Atmospheric Pressure sensor and cable set necessary hardware as per technical specifications
S2d: Installation, Testing & Commissioning of Solar Radiation sensor and cable set necessary hardware as per technical specifications
Service N0. S3 : Automated River Water Level (stage) and River Discharge Stations(GD): Installation, Testing & Commissioning of Automated Water Level Recorder (non-contact-RADAR) for River/ Canals/ Reservoirs and associated civil works for mounting the RADAR having 35 m range with all necessary hardware as per technical specifications
Service N0. S4 : Automated Reservoir Water Level and Outflow Discharge Stations on Radar type water Level:
S4a: Installation, Testing & Commissioning of Automated Water Level Recorder (non-contact-RADAR) for River/ Canals/ Reservoirs and associated civil works for mounting the RADAR having 35 m range with all necessary hardware as per technical specifications
S4b: Installation, Testing & Commissioning of Automated Water Level Recorder (non-contact-RADAR) for River/ Canals/ Reservoirs and associated civil works for mounting the RADAR having 70 m range with all necessary hardware as per technical specifications
Service N0. S5 : Installation, Testing & Commissioning of Shaft Encoder based rotary Gate position sensor for monitoring of Spillway gates, Intake Gates, Silt flushing gates including cabling & integration with datalogger as per technical specifications.
Service N0. S6 :
S6a: Installation, Testing & Commissioning of Data Loggers with 2 AI channels, with INSAT, GSM & GPRS based telemetry, Antenna including all necessary equipment for data transmission as per technical specifications.
S6b: Installation, Testing & Commissioning of Solar panel for ARG and/or AWLR system with all connectors, cables and conduit as per technical specifications
S6c: Installation, Testing & Commissioning of Battery, charger regulator for ARG and/or AWLR system with all interconnecting connectors, cables for DCP as per technical specifications
S6d: Installation, Testing & Commissioning of NEMA4X OR Equivalent Enclosure box to suit master unit equipment with locking, other ancillary equipment, fittings earthling, lightening arrestor with all connectors, cables and conduit for cables, mast to mount DCP for ARG and/or AWLR system, sensor mount complete as per technical specifications
Service N0. S7 :
S7a: Installation, Testing & Commissioning of Data Logger with 8AI channels, with INSAT, GSM & GPRS based telemetry, Antenna including all necessary equipment for data as per technical specifications.
S7b: Installation, Testing & Commissioning of Solar panel with all connectors for AWS / Gate positon monitoring system, cables and conduit for cables as per technical specifications
S7c: Installation, Testing & Commissioning of Battery, charger regulator connectors for AWS / Gate positon monitoring system with all interconnecting connectors, cables for DCP as per technical specifications
S7d: Installation, Testing & Commissioning of NEMA4X OR Equivalent Enclosure box to suit master unit equipment with locking, other ancillary equipment, fittings earthling, lightening arrestor with all connectors, cables and conduit for cables, connectors, mast to mount DCP for Gate positon monitoring system, sensor mount complete as per technical specifications
S7e: Installation, Testing & Commissioning of NEMA4X OR Equivalent Enclosure box to suit master unit equipment with locking, other ancillary equipment, fittings earthling, lightening arrestor with all connectors, cables and conduit for cables, connectors, 10mts triangular Tower with guy rope support to mount DCP for AWS system, sensor mount complete as per technical specifications
Service N0. S8 : Integration of INSAT and GSM-GPRS data from proposed RTDAS stations with the existing State Data Center (SDC) at Nashik and Installation, Testing & Commissioning of Computer Node (Workstation) along with Monitor at Divisional office and all necessary accessories as per technical specifications
Service N0. S9 : Operation & Maintenance during Five Years Comprehensive Warranty period, for entire RTDAS System with Telemetry as specified in Schedule of Requirement along with accessories, installed at designated locations and Data Center equipments under this contact after final acceptance of RTDAS systems. This includes replacement of material/ goods &consumables as & when required at bidders cost. The cost of Communication for GSM & GPRS telemetry for data transmission shall be borne by bidder. The license fee as applicable for DOT for INSAT transmission shall be borne by purchaser.
Skymet Weather Services Private Limited
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .