Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.1 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹7.7 L+₹66,319.76 (9.41%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹8.3 L+₹1.3 L (18.2%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | Rejected-Technical | - | Rejected-Technical Disqualify |
| Sl No | Description | Qty | Unit | M/S ASHOK SINGH CONTRACTOR & SUPPLIER L3 | V.D. CONSTRUCTION L2 | C B CONSTRUCTION COMPANY L1 |
|---|---|---|---|---|---|---|
| 1.00 | Jungle clearance Cutting heavy under growth and bushes up to 7.5 cm. Diameter including removal from toe to toe of both banks including all Cost of Labour T&P Etc | 54,611.55 | M2 | 1,09,223.1 ₹1,09,223.1 | 1,11,953.68 ₹1,11,953.68 | 1,02,669.71 ₹1,02,669.71 Lowest |
| 2.00 | Removal of thick Besharam/Sarpat with uprooting in internal section, bank ,and doula including all removal /disposal Including all Cost of Labour T&P etc | 8,680 | M2 | 52,080 ₹52,080 | 47,132.4 ₹47,132.4 | 42,966 ₹42,966 Lowest |
| 3.00 | Bed and berm scrapping including earth up to 7.5cm. Including all cost of labour T&P etc Complete | 17,540 | M2 | 89,454 ₹89,454 | 77,877.6 ₹77,877.6 | 71,914 ₹71,914 Lowest |
| 4.00 | Removal of jalkhumbi (hyacinth)or sewar from Reservoir including its disposal etc | 30,277 | M2 | 90,831 ₹90,831 | 84,472.83 ₹84,472.83 | 77,206.35 ₹77,206.35 Lowest |
| 5.00 | Silt clearance by manual labour in drains and minors with service road with its disposal, ramming and dressing including lift up to 1.5 m and lead upto 30 m. | 6,929.95 | M3 | 4,92,026.45 ₹4,92,026.45 | 4,49,892.35 ₹4,49,892.35 | 4,10,253.04 ₹4,10,253.04 Lowest |
Tender Value
₹9.4 L
EMD Value
₹19,000
Closing Date
7 Oct 2026, 1:00 pmClosed
EE ID FIRST KARVI
EE ID FIRST KARVI
Jungle Cleaning, Removal of jalkhumbi (hyacinth) Sewar, bed berm Scrapping and Silt clearance work in Chillimal main canal from Km 3.800 to Km 22.200.
2026_UPIDC_1190524_1
01/EE/2026-27
Open Tender
Civil Works
Item Rate
30 days
ID1
Jungle Cleaning, Removal of jalkhumbi (hyacinth) Sewar, bed berm Scrapping and Silt clearance work in Chillimal main canal from Km 3.800 to Km 22.200.
2 documents required · 2 mandatory
₹1,154
₹19,000
Yes
16 Oct 2026
28 Sept 2026
7 Oct 2026
28 Sept 2026
7 Oct 2026
28 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Jungle clearance Cutting heavy under growth and bushes up to 7.5 cm. Diameter including removal from toe to toe of both banks including all Cost of Labour T&P Etc | 54,611.55 | M2 | - | - |
| 2 | Removal of thick Besharam/Sarpat with uprooting in internal section, bank ,and doula including all removal /disposal Including all Cost of Labour T&P etc | 8,680 | M2 | - | - |
| 3 | Bed and berm scrapping including earth up to 7.5cm. Including all cost of labour T&P etc Complete | 17,540 | M2 | - | - |
| 4 | Removal of jalkhumbi (hyacinth)or sewar from Reservoir including its disposal etc | 30,277 | M2 | - | - |
| 5 | Silt clearance by manual labour in drains and minors with service road with its disposal, ramming and dressing including lift up to 1.5 m and lead upto 30 m. | 6,929.95 | M3 | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.77 MB
BID.pdf
Tender Documents • 6.48 MB
BOQ_2244056.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .