Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 LAccepted-Finance | ₹2.0 L | L1 | Accepted-Finance As per TC committee recommendation |
| 2 | L2₹2.1 LRejected-Finance FULBERIA SAMDI BARDHAMAN 713359 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713359 | ₹2.1 L | L2 | Rejected-Finance As per TC committee recommendation |
| 3 | Rejected-Technical | - | - | Rejected-Technical documents not submitted as per NIt |
| Sl No | Description | Qty | Unit | M.M.N.M.ENGINEERINGS WORKS PRIVATE LIMITED L1 | RAKESH ELECTRICAL L2 |
|---|---|---|---|---|---|
| 1.00 | Supply of indicator LED 110 V and holder for ON, OFF & E/L, O/I Trip indicator | 4 | Nos | 250 ₹1,000 | 1,000 ₹4,000 |
| 2.00 | Supply & fitting of earth leakage set with CBT 50-750 MA | 1 | No | 12,500 ₹12,500 | 12,500 ₹12,500 |
| 3.00 | Supply of Timer relay kit assembly | 1 | Set | 2,500 ₹2,500 | 9,100 ₹9,100 |
| 4.00 | Supply of C.T ratio 150/5 | 3 | Nos | 1,200 ₹3,600 | 2,000 ₹6,000 |
| 5.00 | Supply of 1 No. ML 12, 3 Pole power contractor rating current 300 Amps providingfor star delta operating | 3 | Nos | 28,550 ₹85,650 | 28,000 ₹84,000 |
| 6.00 | Cost of terminal insulator with copper stud for incoming and out going | 9 | No | 1,200 ₹10,800 | 700 ₹6,300 |
| 7.00 | Supply of PT 550 /415/220/110/24/8 volt 3 phase | 1 | Nos | 15,700 ₹15,700 | 15,000 ₹15,000 |
| 8.00 | Supply of copper bus bar | 3 | nos | 3,000 ₹9,000 | 2,500 ₹7,500 |
| 9.00 | PVC Terminal 70,90 sq mm lead | 5 | mtr | 1,200 ₹6,000 | 1,200 ₹6,000 |
| 10.00 | Cost of new Thermal overload relay wiyh mounting kit | 1 | set | 9,100 ₹9,100 | 10,200 ₹10,200 |
Updated dates
Tender Value
₹2.3 L
EMD Value
₹2,900
Closing Date
23 Mar 2026, 6:00 pmClosed
AE EandM
Office of AE EandM
Upgradation of 90 HP Auto Transformer starter in controlling to submersible pump Bonjemihary Colliery under Salanpur Area.
2026_ECL_356055_1
ECL/SLN/GM/EnM/ etender/25-26/93, dt. 09.03.2026
Open Tender
Electrical and Maintenance Works
15 days
Bonjemihary
6 documents required · 6 mandatory
₹2,900
31 Mar 2026
9 Mar 2026
24 Mar 2026
9 Mar 2026
23 Mar 2026
9 Mar 2026
9 Mar 2026 - 12 Mar 2026
Supply of indicator LED 110 V and holder for ON, OFF & E/L, O/I Trip indicator
Supply & fitting of earth leakage set with CBT 50-750 MA
Supply of Timer relay kit assembly
Supply of C.T ratio 150/5
Supply of 1 No. ML 12, 3 Pole power contractor rating current 300 Amps providingfor star delta operating
Cost of terminal insulator with copper stud for incoming and out going
Supply of PT 550 /415/220/110/24/8 volt 3 phase
Supply of copper bus bar
PVC Terminal 70,90 sq mm lead
Cost of new Thermal overload relay wiyh mounting kit
Supply of Amp meter
Cost of single- phase preventer
Supply of HRC fuse link with holder
Supply isolator (300 Amps)
Supply of brass Nut, Bolt and washer & paint
Complete wiring wire 1.5 sq. mm & insulating materials
Labour charges for fitting, testing etc.
Transporting cost with loading & unloading
Add: Other Expenses
Add: Provident fund on Labour cost
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.34 MB
Tendernotice_2.pdf
PDF • 1.77 MB
Tendernotice_3.pdf
PDF • 0.24 MB
BOQ_368906.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid