Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.0 CrAdmitted-Finance | -14.99% | ₹1.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.1 Cr+₹4.0 L (3.87%)Admitted-Finance AT JAMARA PO BAGHUNI PS NEMALO DIST CUTTACK PIN 754209 | CUTTACK | ODISHA | 754209 | -11.70% | ₹1.1 Cr+₹4.0 L (3.87%) | L2 | Admitted-Finance |
| 3 | L3₹1.1 Cr+₹6.1 L (5.88%)Admitted-Finance | -9.99% | ₹1.1 Cr+₹6.1 L (5.88%) | L3 | Admitted-Finance |
| 4 | L4₹1.2 Cr+₹18.2 L (17.6%)Admitted-Finance | +0.00% | ₹1.2 Cr+₹18.2 L (17.6%) | L4 | Admitted-Finance |
| 5 | L4₹1.2 Cr+₹18.2 L (17.6%)Admitted-Finance | +0.00% | ₹1.2 Cr+₹18.2 L (17.6%) | L4 | Admitted-Finance |
Tender Value
₹1.2 Cr
EMD Value
₹1.2 L
Closing Date
28 May 2026, 5:30 pmClosed
CCE Cuttack RandB Circle
O/o CCE Cuttack RandB Circle
Building work
2026_EICCL_129380_1
CCE.Ctc.(RandB)20/2025-26
National Competitive Bid
Civil Works - Buildings
Percentage
270 days
Kendrapara
As per DTCN
3 documents required · 3 mandatory
₹10,000
₹1.2 L
Yes
20 Aug 2026
16 May 2026
29 May 2026
16 May 2026
28 May 2026
16 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Civil work - Earthwork in excavation in hard soil for site leveling, foundation, pits, trenches and other civil works upto and including 1.5metre lift and stacking the soil upto a lead of 100 metre and including dewatering, removing slush, shoring and strutting (as required), complete as per specification and as directed by the Engineer-In-Charge. | 130.46 | Cum | 276.89 | ₹36,123.07 |
| 2 | Filling in foundation trenches and plinth, with excavated earth including laying the earth in layers not exceeding 23.5 cm thick ramming & watering with all leads & lifts including cost of all labour,T&P completed as directed by the Engineer-in-charge. | 130.46 | Cum | 153.83 | ₹20,068.66 |
| 3 | Supplying and filling sand in foundation and over areas including watering, ramming, consolidating and dressing, labours, tools, taxes etc. all complete as per the specification and direction of Engineer-In-Charge. | 130.69 | Cum | 728.25 | ₹95,174.99 |
| 4 | Providing and laying plain cement concrete 1:4:8 (1 cement : 4 sand : 8 stone agregate 40mm nominal size) as levelling course in floor and plinth including tempering, curring, shuttering etc. complete all depth and height. | 20.78 | Cum | 6,199.47 | ₹1,28,824.99 |
| 5 | Providing and laying of Cement Concrete of grade 1: 3 :6 (1cement : 3 sand : 6 graded stone aggregate of size 25mm to 40 mm hard granite crusher broken metal ) , mixing in concrete mixer ,lowering and compacting in proper thickness , watering & curing for the required period .including all cost of labour ,material, conveyance,all taxes & royalities of materials, T & P etc.complete as per the directions of Engineer-in-charge. (Ground Floor) | 31.41 | cum | 6,593.62 | ₹2,07,105.6 |
| 6 | First class Fly ash Brick masonry using bricks of size 25 cm. x 12 cm. x 8 cm. having crushing strength not less than 75 kg. Per. Sqr. Cm. in cement mortar of mix( 1:6) with ordinary Portland slag cement(PSC) and screened & washed sand for mortar after immersing the bricks for 6 (Six) hours in water before use in Foundation & Plinth including splays cutting, circular moulding, corbelling, chamfering and similar such type of works, watering and curing etc. including cost, conveyance, loading, unloading, royalties and taxes of all materials, cost of all labour, scaffolding, sundries, T&P required for the works etc. complete in all respect as directed by the Engineer-in-Charge. | 11.15 | Cum | 6,131.25 | ₹68,363.44 |
| 7 | Fly Ash. brick masonry of size 25 cm. x 12 cm. x 8 cm. having crushing strength not less than 75 kg. Per Sqr. Cm. in cement mortar of mix (1:6) with approved grade cement and screened & washed sand for mortar after immersing the bricks for 6 (Six) hours in water before use in Superstructure including splays cutting, circular moulding, corbelling, chamfering and similar such type of works, watering and curing etc. including cost, conveyance, loading, unloading, royalties and taxes of all materials, cost of all labour, scaffolding, sundries, T&P required for the works etc. complete in all respect as directed by the Engineer-in-charge. (Ground Floor) | - | Cum | 6,164.58 | - |
| 8 | First Floor | 48.74 | Cum | 6,542.96 | ₹3,18,903.87 |
| 9 | Terrace Floor | 4.3 | Cum | 6,978.11 | ₹30,005.87 |
| 10 | Half brick work with Fly Ash brick masonry in cement mortar (1:4) in super structure having a crushing strength of not less than 75 kg./sqcm with dimensional tolerance ± 2% including splays cutting circular moulding chamfering and corbelling and similar such type of works with all necessary projections watering and curing after immersing the bricks in water at least for six hours before use including cost, conveyance, royalties and taxes of all materials with all labour,labour cess and T & P required for the work complete in all respect as per direction of Engineer-in-Charge. (Ground Floor) | 3.02 | Cum | 6,391.39 | ₹19,302 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.09 MB
DTCN.pdf
Tender Documents • 0.57 MB
BOQ_591565.xls
BOQ • 1.21 MB
Clarification_OM.pdf
Additional Documents • 2.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .