| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.0 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹5.5 L+₹49,311.35 (9.86%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹6.0 L+₹95,205.36 (19.0%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹6.2 L+₹1.2 L (24.8%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹6.4 L+₹1.4 L (28.4%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹9.6 L
EMD Value
₹19,200
Closing Date
18 Sept 2026, 6:00 pmClosed
Executive Engineer PWD RandB PROJECT DIVISION III
Office of the PWD RandB PROJECT DIVISION III JAMMU
Waterproofing of various blocks at Ahata Amar Singh. CNo-238 P
2026_PWDJK_324514_5
Short e-NIT No. 67 of 2026-2027 Dated 12-09-2026
Open Tender
Civil Works
Percentage
30 days
JAMMU
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Executive Engineer PWD RandB PD III Jammu
₹19,200
Office of the PWD RandB PROJECT DIVISION III JAMMU
6 Oct 2026
12 Sept 2026
19 Sept 2026
12 Sept 2026
18 Sept 2026
12 Sept 2026
16 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Preparing the surface by removal of old layers of mortar on roof and cleanig the cracks with wire brush etc, shifting of debries /mulba from roof, parapets, momties and adjoining area o to le dumping sites by engaging labours. Skilled | 16 | each | 734 | ₹11,744 |
| 2 | Unskilled | 20 | each | 553 | ₹11,060 |
| 3 | 12mm Cement plaster of mix: 1 : 4 ( 1 cement : 4 fine sand) for levelling of surface | 1,106.32 | sqm | 283.8 | ₹3,13,973.62 |
| 4 | Providing and Laying water proofing treatment on roofs of slabs by applying cement slurry mixed with water proofing cement compound consisting of applying (alafter surface preparation, first layer of cement @0.488 kg/sqm mixed with water proofing cement compound @0.253kg/sqm(b)laying second layer of fibre glass cloth when the first layer is still green. Ovelaps of joints of fiber cloth should not be less than 10cm. (c)third layer of 1.5mm thickness consisting of slurry of cement @1.289kg/sqm mixed with water proofing cement compound @0.670kg/sqmand coarse sand @1.289kg/sqm. this will be allowed to air cure for 4 hours following by water curing for 48 hours the entire treatment will be upto 30cm on parapet wall and tucked into groove in parapet all around | 1,106.32 | sft | 556.2 | ₹6,15,335.18 |
| 5 | Shifting of debries / cleaning site /other allied works at site by engaging each skilled and unskilled labours, unskilled | 4 | each | 553 | ₹2,212 |
| 6 | Engaging trolley for shitting of mulba from site to beyond the municipality each limit inct. Loading and unloading complete job | 2 | each | 1,000 | ₹2,000 |
| 7 | Engaging welder along with kit for repair work | 2 | each | 1,800 | ₹3,600 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.75 MB
BOQ_1094654.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .