Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.3 LAccepted-AOC WARD NO 3 NEAR SBI BANK NARNAUND DISTRICT HISAR 125039 HARYANA | NARNAUND | HISAR | HARYANA | 125039 | ₹10.3 L | L1 | Accepted-AOC AOC |
| 2 | L2₹10.7 L+₹38,802.68 (3.75%)Rejected-Finance BAWANI KHERA MAIN ROAD BAWANI KHERA BELOW MUNICIPAL COMMITTEE BAWANI KHERA 127032 | BAWANI KHERA | BHIWANI | HARYANA | 127032 | ₹10.7 L+₹38,802.68 (3.75%) | L2 | Rejected-Finance L2 |
| 3 | L3₹10.9 L+₹50,443.49 (4.87%)Rejected-Finance | ₹10.9 L+₹50,443.49 (4.87%) | L3 | Rejected-Finance L3 |
| 4 | L4₹12.6 L+₹2.3 L (22.1%)Rejected-Finance | ₹12.6 L+₹2.3 L (22.1%) | L4 | Rejected-Finance L4 |
| 5 | L5₹13.6 L+₹3.2 L (31.2%)Rejected-Finance | ₹13.6 L+₹3.2 L (31.2%) | L5 | Rejected-Finance L5 |
Tender Value
₹12.9 L
EMD Value
₹25,868
Closing Date
8 May 2026, 6:55 pmClosed
Pankaj Garg
Municipal Committee Bawani Khera
Construction of Street from Somar Puri Kutia to H/o Ramphal S/o Motu Chamar in W.No. 01, M.C., Bawani Khera.
2026_HRY_519013_1
2026C27637E1 2FB1 4399 B69D AA1408A42C08343ULB
Open Tender
Civil Works
Works
180 days
Bawani Khera
2 documents required · 2 mandatory
₹1,000
₹25,868
Yes
21 May 2026
1 May 2026
11 May 2026
1 May 2026
8 May 2026
1 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | HSR Item 4.33-Excavating, supplying and filling of local earth
(including royalty) by mechanical transport up to a lead of 1
km also including ramming and watering of the earth in layers
not exceeding 20 cm in trenches, plinth, sides of foundation
etc. complete.
HSR Rate(Rs.) 138.00 Through Rate | 1 | cum | 138 | ₹137.86 |
| 2 | HSR Item 3.1.2-By Mechanical Transport including loading,
unloading and stacking 2. Earth
HSR Rate(Rs.) 6.00 Beyond 5km up to 10km per KM | - | cum | 6 | - |
| 3 | HSR Item 17.8.3-Compaction 3. Extra for rolling to
specifications
HSR Rate(Rs.) 27.00 Through Rate | 1 | cum | 27 | ₹26.97 |
| 4 | HSR Item 3.1.2-By Mechanical Transport including loading,
unloading and stacking 2. Earth
HSR Rate(Rs.) 83.00 5km | 1 | cum | 83 | ₹82.92 |
| 5 | HSR Item 17.69.2-Interlocking Concrete Block Pavement 2.
Providing and Laying 80 mm thick ISI marked Interlocking
Paver Blocks conforming to IS 15658:2006/IRC SP 63: 2004
of all shapes and colours in design mix cement M 40 over the
bed of 30 mm thick fine sand complete in all respect.
HSR Rate(Rs.) 655.00 Through Rate | - | Sqm | 655 | - |
| 6 | HSR Item 13.29.2-Steel work welded in built up sections/
framed work, including cutting, hoisting, fixing in position and
applying a priming coat of approved steel primer using
structural steel etc. as required. 2. In gratings, frames, guard
bar, ladder, railings, brackets, gates and similar works
HSR Rate(Rs.) 83.00 Through Rate | - | Kg | 83 | - |
| 7 | HSR Item 10.100.2-Cement Concrete 1:8:16 Flooring 2.
Cement Concrete 1:8:16 with stone aggregate 40 mm size in
foundation and plinth.
HSR Rate(Rs.) 1863.00 Through Rate | 1 | cum | 1,863 | ₹1,861.14 |
| 8 | HSR Item 21.8-First class flat brick 7.50 cm thick laid in
reimbursements in and on 1:4 cement sand mortar as above.
HSR Rate(Rs.) 3434.00 Through Rate | - | 10 sq m. | 3,434 | - |
| 9 | HSR Item 21.4-Tega 11.50 cm thick formed of first class
bricks on end laid in cement sand mortar 1:5 as above.
The rates for items 21.3 and item 21.4 include for all
excavation and roll for all bends, curve, cutting and wastage
of bricks required. The external surface of the exposed joints
must be struck flush as the work proceeds and left perfectly
smooth.
HSR Rate(Rs.) 1031.00 Through Rate | - | 10 Metres | 1,031 | - |
| 10 | HSR Item 21.53-Constructing standard drain type I drain
moulded and laid over lime concrete foundation rendered and
finished smooth with 6 mm thick rendering concrete to be of
1.3.6 parts by volume of cement sand stone bajri and
rendering to be 1:1 cement sand mortar
HSR Rate(Rs.) 160.00 Through Rate | - | Metres | 160 | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.88 MB
BOQ_597903.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .