Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹45.2 LAccepted-AOC | L1 | Accepted-AOC L1 Bidder | |
| 2 | L2₹45.5 L+₹30,569.54 (0.68%)Rejected-Finance | L2 | Rejected-Finance Committee Decision |
Tender Value
₹45.2 L
EMD Value
₹48,000
Closing Date
15 Jul 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Project Director, DRDA, Virudhunagar
DRDA, Collectorate Complex, Virudhunagar
Rejuvenation and improvements to Tank-1 no. and Deepening and Improvements to the Ooranies - 11 nos. in AGAMT-II-2021-22 Village panchayats of Vembakottai Block in Virudhunagar District in Package no.VMK-1.
2022_RDTN_237316_52
C9/5832/2021 dated 18.06.2022
Open Tender
Civil Works
Works
180 days
Vembakottai Block
Two Cover System. Refer tender document.
5 documents required · 5 mandatory
₹0
₹48,000
DRDA, Collectorate Complex, Virudhunagar
16 Sept 2022
29 Jun 2022
15 Jul 2022
29 Jun 2022
15 Jul 2022
6 Jul 2022
6 Jul 2022
90 days
Amount
Part-1:- Deepening of Pillayar Kovil Oorani with Construction of Bathing Ghat
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete.
Plain Cement concrete 1:3:6 using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete.
Supplying and erecting centering shuttering and formwork for sides & soffits of Cement concrete surfaces including all cost and conveyance of materials and all labour charges etc, complete.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete.
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Part-2:- Desilting of Singathu Oorani with Revetment 32m in InamReddiapatti village
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete.
Plain Cement concrete 1:3:6 using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete.
Supplying and erecting centering shuttering and formwork for sides & soffits of Cement concrete surfaces including all cost and conveyance of materials and all labour charges etc, complete.
Gravel backing for revetments including cost and conveyance and all labour charges etc complete - 10 cum.
Rough stone dry packing for aprons and revetments including cost and conveyance and all labour charges etc complete - 10 cum.
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Part-3:- Deepaning of Oorani and Construction of Bathing Ghat with Revetment length 80m and Retaining wall length 5m in Thungareddiapatti Kuttai (Mayana Oorani)
Clearing the Light jungle rooting and disposing of the same as directed by the Engineer in charge of the works as per technical (A8)
Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Hard stiff clay, stiff black cotton, hard red earth, shales,murram, gravel, stoney earth and earth mixed with small size boulders SS.20
Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Hard stiff clay, stiff black cotton, hard red earth, shales,murram, gravel, stoney earth and earth mixed with small size boulders SS.20
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
centering and Shuttering for wall Work including cost and conveyance of all materials to site and all labour charges etc complete
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Plastering with cement mortar 1:4 mix to 20 mm thick including cost and conveyance and all labour charges etc complete
Provision for Bathing Ghat
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete.
Plain Cement concrete 1:3:6 using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete.
Supplying and erecting centering shuttering and formwork for sides & soffits of Cement concrete surfaces including all cost and conveyance of materials and all labour charges etc, complete.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete.
Gravel backing for revetments including cost and conveyance and all labour charges etc complete - 10 cum.
Rough stone dry packing for aprons and revetments including cost and conveyance and all labour charges etc complete - 10 cum.
Part-4:- Deepening of Mayandi Oorani with Contsruction of Bathing Ghat
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete.
Plain Cement concrete 1:3:6 using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete.
Supplying and erecting centering shuttering and formwork for sides & soffits of Cement concrete surfaces including all cost and conveyance of materials and all labour charges etc, complete.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete.
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Part-5:- Improvements of Ayyanar kovil oorani Oorani with Retaining wall 8.0m and Revetment 16.0m in kottaipatti village
Clearing the Light jungle rooting and disposing of the same as directed by the Engineer in charge of the works as per technical (A8)
Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Hard stiff clay, stiff black cotton, hard red earth, shales,murram, gravel, stoney earth and earth mixed with small size boulders SS.20
Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Hard stiff clay, stiff black cotton, hard red earth, shales,murram, gravel, stoney earth and earth mixed with small size boulders SS.20
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
centering and Shuttering for wall Work including cost and conveyance of all materials to site and all labour charges etc complete
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Plastering with cement mortar 1:4 mix to 20 mm thick including cost and conveyance and all labour charges etc complete
Gravel backing for revetments including cost and conveyance and all labour charges etc complete - 10 cum.
Rough stone dry packing for aprons and revetments including cost and conveyance and all labour charges etc complete - 10 cum.
Part-6:- Improvements of Kottaipatti Kanmai with Retaining wall 20.0m and weir apron repair in kottaipatti village
Clearing the Light jungle rooting and disposing of the same as directed by the Engineer in charge of the works as per technical (A8)
Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Hard stiff clay, stiff black cotton, hard red earth, shales,murram, gravel, stoney earth and earth mixed with small size boulders SS.20
Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Hard stiff clay, stiff black cotton, hard red earth, shales,murram, gravel, stoney earth and earth mixed with small size boulders SS.20
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
centering and Shuttering for wall Work including cost and conveyance of all materials to site and all labour charges etc complete
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Part-7:- Deepening of Chelliyaramman Kovil oorani and Revetment (40m) in Melaottampatti
Clearing the Light jungle rooting and disposing of the same as directed by the Engineer in charge of the works as per technical (A8)
Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Hard stiff clay, stiff black cotton, hard red earth, shales,murram, gravel, stoney earth and earth mixed with small size boulders SS.20
Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Hard stiff clay, stiff black cotton, hard red earth, shales,murram, gravel, stoney earth and earth mixed with small size boulders SS.20
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Centering charges for all c.c works including cost and conveyance pf all materials to site and all labour charges etc complete.
Cement concrete 1:3:6 mix using 20mm metal including cost and conveyance pf all materials to site and all labour charges etc complete.
Gravel backing for revetments including cost and conveyance and all labour charges etc complete - 10 cum.
Rough stone dry packing for aprons and revetments including cost and conveyance and all labour charges etc complete
Grouting with CC 1:2:4 mix and Pointing for Revetment works etc, complete
Part-8:- Deepening of Konar Oorani with Construction of Bathing ghat and Revetment (12 m) in Melaottampatti
Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Hard stiff clay, stiff black cotton, hard red earth, shales,murram, gravel, stoney earth and earth mixed with small size boulders SS.20
Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Hard stiff clay, stiff black cotton, hard red earth, shales,murram, gravel, stoney earth and earth mixed with small size boulders SS.20
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Centering charges for all c.c works including cost and conveyance pf all materials to site and all labour charges etc complete.
Cement concrete 1:3:6 mix using 20mm metal including cost and conveyance pf all materials to site and all labour charges etc complete.
Gravel backing for revetments including cost and conveyance and all labour charges etc complete - 10 cum.
Rough stone dry packing for aprons and revetments including cost and conveyance and all labour charges etc complete
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete.
Part-9:- Deepening of Manthai Oorani with Retaining wall (15.00m), Bathing Ghat @ Puliparaipatti Village
Clearing the Light jungle rooting and disposing of the same as directed by the Engineer in charge of the works as per technical (A8)
Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Hard stiff clay, stiff black cotton, hard red earth, shales,murram, gravel, stoney earth and earth mixed with small size boulders SS.20
Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Hard stiff clay, stiff black cotton, hard red earth, shales,murram, gravel, stoney earth and earth mixed with small size boulders SS.20
Gravel backing for revetments including cost and conveyance and all labour charges etc complete - 10 cum.
Rough stone dry packing for aprons and revetments including cost and conveyance and all labour charges etc complete - 10 cum.
Grouting with CC 1:2:4 mix and Pointing for Revetment works etc, complete
Provision for Bathing Ghat
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete.
Random rubble masonry in cement mortar 1:5 mix with simultaneous pointing including cost and conveyance pf all materials to site and all labour charges etc complete.
Supplying and erecting centering shuttering and formwork for sides & soffits of Cement concrete surfaces including all cost and conveyance of materials and all labour charges etc, complete.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete.
Plastering with cement mortar 1:4 mix to 20 mm thick including cost and conveyance and all labour charges etc complete
Part-10:- Deepening of Ayyan Oorani with Construction Bathing ghat in Sankarapandiapuram Village
Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Hard stiff clay, stiff black cotton, hard red earth, shales,murram, gravel, stoney earth and earth mixed with small size boulders SS.20
Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Hard stiff clay, stiff black cotton, hard red earth, shales,murram, gravel, stoney earth and earth mixed with small size boulders SS.20
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Centering charges for all c.c works including cost and conveyance pf all materials to site and all labour charges etc complete.
Cement concrete 1:3:6 mix using 20mm metal including cost and conveyance pf all materials to site and all labour charges etc complete.
Gravel backing for revetments including cost and conveyance and all labour charges etc complete - 10 cum.
Rough stone dry packing for aprons and revetments including cost and conveyance and all labour charges etc complete
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete.
Part-11:- Deepening of Oorani with Construction of Bathing ghat and Revetment (14m) and weir repair in Mankundanpatti
Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Hard stiff clay, stiff black cotton, hard red earth, shales,murram, gravel, stoney earth and earth mixed with small size boulders SS.20
Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Hard stiff clay, stiff black cotton, hard red earth, shales,murram, gravel, stoney earth and earth mixed with small size boulders SS.20
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Centering charges for all c.c works including cost and conveyance pf all materials to site and all labour charges etc complete.
Cement concrete 1:3:6 mix using 20mm metal including cost and conveyance pf all materials to site and all labour charges etc complete.
Gravel backing for revetments including cost and conveyance and all labour charges etc complete - 10 cum.
Rough stone dry packing for aprons and revetments including cost and conveyance and all labour charges etc complete
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete.
Part-12:- Deepening of West Oorani with Retaining wall (18.00m), Bathing Ghat @ Inam meenachipuram Village
Clearing the Light jungle rooting and disposing of the same as directed by the Engineer in charge of the works as per technical (A8)
Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Hard stiff clay, stiff black cotton, hard red earth, shales,murram, gravel, stoney earth and earth mixed with small size boulders SS.20
Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Hard stiff clay, stiff black cotton, hard red earth, shales,murram, gravel, stoney earth and earth mixed with small size boulders SS.20
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
centering and Shuttering for wall Work including cost and conveyance of all materials to site and all labour charges etc complete
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Plastering with cement mortar 1:4 mix to 20 mm thick including cost and conveyance and all labour charges etc complete
Provision for Bathing Ghat
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete.
Plain Cement concrete 1:3:6 using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete.
Supplying and erecting centering shuttering and formwork for sides & soffits of Cement concrete surfaces including all cost and conveyance of materials and all labour charges etc, complete.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete.
GST Amount for providing Service to the above Government Contract Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
SREE BALAJI CONSTRUCTIONS
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .