Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹38,900
Closing Date
13 Aug 2024, 11:15 amClosed
EE ENM M3
DELHI JAL BOARD TU BLOCK PITAMPURA DELHI-34
Dehydration overhauling and repairing of Bharat Bijlee 2500 KVA Transformer No 1 installed at New Avantika BPS re invite
2024_DJB_260678_1
NIT NO. 6(M-3)
Open Tender
Miscellaneous Works
Item Rate
90 days
EE ENM M 3
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
Account No 50448339804
₹38,900
Yes
16 Aug 2024
6 Aug 2024
13 Aug 2024
6 Aug 2024
13 Aug 2024
6 Aug 2024
Dismantling of 11 / 0.4 K V power supply of transformer after draw out the VCB from the respective chambers by an expert person from HT panel & transformer
Dismantling the complete transformer. Removing the top cover, oil tank, silica jel breather and fins etc. lifting the core and coils from the transformer tank.
Debrazing of connections, dismantling of old winding from the transformer core. dismantling of damaged core punching from the T/r , straightening, smoothening of .damaged core punching cleaning of old varnish chemically and phosphating treatment ofall the core punching F class core plate varnish coating in automatic varnish coating tunnel type temperature controlled conveyorised baking oven uniform thickness test on varnishedand baked core punching. Assembling of core punching in T/r by staggering repressing hydraulically, locking of complete assembled T/r core
Rewinding of 11 K V HT winding limbs, removing the burnt winding. Providing the new DPC copper strips and making the new HT coils as per original. Fixing the coil in transformer core with proper HT insulation. Making the connection and brazing the same with silver mixed copper rod and insulation with HT insulation Varnishing the HT winding with Dr.Beck oil proof varnish and baking the same.
Re-insulation of 0.4 K V winding limbs, Annealing and cleaning the copper strips, Re-insulation of copper strips with craft paper tape and making the coils as per original shape Fixing the coils in transformer core with proper LT insulation. Making the connection and brazing the same with silver mixed copper rod and insulation with LT insulation varnishing the HT winding with Dr, Beck oil proof varnish and baking the same
Fixing the core and coil in the transformer tank with safe and sound condition. Replacement of top cover gasket and insulator gasket oil seal for stopping the leakage
Repairing of tape changer
Repairing of LT Copper bolt and Pam, remettaling and finishing the same as per original shape and size
Repair of cooling fins, replacement of cooling fins gasket and oil seal for stopping the Leakage
Filling the new transformer oil make Savita
Dehydration of transformer oil
Assembling the complete transformer and installation the same and testing on load at site
Transformer 1ifting & lowering with the help of hydra and heavy loader labour.
M.B. Enterprises
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .