| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.1 LAccepted-AOC | ₹11.1 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹12.2 L+₹1.1 L (9.89%)Rejected-AOC | ₹12.2 L+₹1.1 L (9.89%) | L2 | Rejected-AOC Rejected |
| 3 | L2₹12.2 L+₹1.1 L (9.89%)Rejected-AOC MAHANADI SOUTH DIVISION NO I CUTTACK | ₹12.2 L+₹1.1 L (9.89%) | L2 | Rejected-AOC Rejected |
| 4 | L2₹12.2 L+₹1.1 L (9.89%)Rejected-AOC | ₹12.2 L+₹1.1 L (9.89%) | L2 | Rejected-AOC Rejected |
| 5 | L2₹12.2 L+₹1.1 L (9.89%)Rejected-AOC | ₹12.2 L+₹1.1 L (9.89%) | L2 | Rejected-AOC Rejected |
Tender Value
₹12.2 L
EMD Value
₹12,200
Closing Date
24 Jun 2026, 5:00 pmClosed
SE Cuttack RandB Division No.I, Cuttack
O/O SE Cuttack RandB Division No.I, Cuttack
Buildings work
2026_EICCL_132316_1
SE CTC(R and B) 11 of 2026-27
Open Tender
Civil Works - Buildings
Percentage
90 days
Cuttack
As per DTCN
2 documents required · 2 mandatory
₹6,000
₹12,200
Yes
17 Jul 2026
18 Jun 2026
25 Jun 2026
18 Jun 2026
24 Jun 2026
18 Jun 2026
18 Jun 2026 - 24 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches in all kinds of soil up to the required depth including Moorum, stony earth and earth mixed with boulders except sheet rocks and boulders requiring blasting including dressing, leveling the bed and depositing the excavated materials away from work site with initial leads and lifts, T&P shoring, shuttering and dewatering if required etc, complete as directed by Engineer-in-charge. | 58.82 | Cum | 255.43 | ₹15,024.39 |
| 2 | Earth work in filling in foundation and plinth with excavated earth deposited at worksite including watering, ramming with cost, conveyance, royalties, taxes of all materials and cost of all labour with T&P, sundries required for the work etc., complete as per direction of Engineer-in-charge. | 19.6 | Cum | 141.9 | ₹2,781.24 |
| 3 | Supplying, & filling in foundation and plinth with good quality river sand including watering, ramming with cost, conveyance, royalties, taxes of all materials and cost of all labour with T&P, sundries required for the work etc., complete (Measurement will be taken on finished compacted section) as per specification and direction of Engineer-in-charge. | 21.72 | Cum | 483.66 | ₹10,505.1 |
| 4 | Plain Cement concrete (1:4:8) using 4cm(1½”) size hard crusher broken granite stone metal of approved quality and from approved quarry including lowering, laying concrete, watering, curing, centering & shuttering for covering columns, scaffolding etc, complete to required levels laid in layers not exceeding 0’-6” thick including cost, conveyances, royalties, taxes of all materials and cost of all labour with sundries, T&P required for the work etc, complete as per specification & direction of the Engineer-in-charge. | 5.85 | Cum | 6,076.1 | ₹35,545.19 |
| 5 | Fly Ash Brick masonry using Fly Ash Bricks (25cmX12cmX8cm) having crushing strength not less than 75Kg/sqcm with dimensional tolerance +2% in cement mortar (1:6) after immersing the bricks for six hours in water before use in FOUNDATION, PLINTH AND BASEMENT and for ornamental flower beds, plinth molding and similar such type of works with all necessary projections, cutting, circular molding, corbelling, watering, curing etc. including cost, conveyances, royalties, taxes of all materials and cost of all labour with T&P required for the work etc. complete as per specification & direction of Engineer-in-charge. | 7.47 | Cum | 5,519.23 | ₹41,228.65 |
| 6 | Fly Ash Brick masonry using Fly Ash Bricks (25cmX12cmX8cm) having crushing strength not less than 75Kg/sqcm with dimensional tolerance +2% in cement mortar (1:6) after immersing the bricks for six hours in water before use in SUPERSTRUCTURES in all floors including splays, cutting, circular moulding, corbelling, champhering and similar such type of works, scaffolding, watering, curing, including cost, conveyances, royalties, taxes of all materials and cost of all labour with T&P required for the work etc. complete as per specification & direction of Engineer-in-charge. | 28.01 | Cum | 5,552.56 | ₹1,55,527.21 |
| 7 | R.C.C work of M-25 Grade having a minimum compressive strength (in work test) 200kg/sqcm in 15cm cubes at 28 days after mixing and test conducted in accordance with IS 456 and IS516 using 20mm down graded size black hard crusher broken granite stone chips as per the design mix of approved quality and from approved quarry including hoisting, lowering, laying and compaction by using vibrators, watering, curing for 28days, centering, shuttering and finishing the exposed surface smooth, providing grooves or beads where necessary including cost, conveyances, royalties, taxes of all materials and cost of all labour with T&P required for the work etc. complete in all respect but excluding cost of MS Rod or tor steel and binding wires & labour charges for bending binding and tying the grills etc. as per specification and direction of the Engineer-in-Charge. RCC Slab
(a)Footing | 8.28 | Cum | 7,324.91 | ₹60,650.25 |
| 7.1 | (b)Plinth beam | 5.25 | Cum | 8,195.26 | ₹43,025.12 |
| 7.2 | (C )Coping Beam | 2.12 | Cum | 8,195.26 | ₹17,373.95 |
| 7.3 | (D)Column | 5.31 | Cum | 18,996.81 | ₹1,00,873.06 |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 4.08 MB
Tendernotice_1.pdf
PDF • 0.24 MB
BOQ_596943.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .