| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹58.2 LAdmitted-Finance | -20.00% | ₹58.2 L | L1 | Admitted-Finance |
| 2 | L1₹58.2 LAdmitted-Finance | -20.00% | ₹58.2 L | L1 | Admitted-Finance |
| 3 | L2₹58.3 L+₹728.10 (0.01%)Admitted-Finance AT P O NATI P S NIALI DIST CUTTACK PIN 754294 | NATI | CUTTACK | ODISHA | 754294 | -19.99% | ₹58.3 L+₹728.10 (0.01%) | L2 | Admitted-Finance |
| 4 | L3₹72.8 L+₹14.6 L (25.0%)Admitted-Finance | +0.00% | ₹72.8 L+₹14.6 L (25.0%) | L3 | Admitted-Finance |
| 5 | L3₹72.8 L+₹14.6 L (25.0%)Admitted-Finance | +0.00% | ₹72.8 L+₹14.6 L (25.0%) | L3 | Admitted-Finance |
Tender Value
₹72.8 L
EMD Value
₹72,810
Closing Date
10 Jun 2026, 5:00 pmClosed
Executive Officer, Balasore Municipality
Executive Officer, Balasore Municipality
Construction of New Market Complex under Balasore Municipalty near Fandi chhak (Ground floor and First floor)
2026_ORULB_129636_1
BM_05_2026_27
Open Tender
Civil Works - Others
Percentage
120 days
Balasore Municipality
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹72,810
Yes
19 Aug 2026
22 May 2026
11 Jun 2026
22 May 2026
10 Jun 2026
22 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches in hard soil within 50 meter initial leadand 1.5mt. Intial lift including rough dressing and levelling the bed and depositing the soil away from work site including cost of all labour, T&P etc. complete as directed by the Engineer in Charge. | 86.35 | Cum | 276.89 | ₹23,909.45 |
| 2 | Supplying and filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalties and taxes of all materials and cost of all labour, T&P required for the work etc. complete as directed by the Engineer-in Charge. | 90.85 | Cum | 1,388.4 | ₹1,26,136.14 |
| 3 | Cement concrete (1:3:6) using 12 mm(½") Size hard crusher broken granite chips of approved quality from approved quarry including lowering lying concrete watering and curing etc. complete to required levels laid in layers including cost,conveyance,royalities and taxes of all materials and cost of all labour ,T&P required for the work etc. complete as directed by the Engineer-in-charge. | 30.02 | Cum | 6,440.2 | ₹1,93,334.8 |
| 4 | R.C.C. work M-20 grade with 25mm and down grade C.B chips having a minimum compressive strength (in work test) 200 kg/cm2 in 15cm cubes at 20 days after mixing and test conduct in accordance with I..S 456 and I.S 516 including hoisting lowring laying concrete and compacting with vibrators, curing for 28 days with smooth centering and shuttering and finishing the exposed surface smooth providing grooves or beads where necessary including cost, conveyance, royalties & T&P required for the work complete in all respect but excluding cost of HYSD and binding wires and labour charges for bending binding and tying the grills as per drawing, specification and direction of Engineer-in-Charge( Pile Cap) . | 86.33 | Cum | 6,677.8 | ₹5,76,494.47 |
| 5 | Supplying HYSD (FE 415)/ (FE 500) of SAIL/TATA/JINDAL STEEL/SHYAM STEEL for reinforcement tying the grills and placing in position as required for the RCC works and for providing fan hooks hoisting and lowering,laying including cost,conveyance & taxes of HYSD bars and binding wires of 18 to 20 gauge required for the work and bending binding and tying the grills ( Payment will be made on weight of HYSD bars only and no separate payment will be made towords the weight of binding wires)etc. complete as per specification and direction of the Engineer - in - charge | 86 | Qntl | 9,359.7 | ₹8,04,934.2 |
| 6 | Rigid Smooth centering & shuttering for RCC worksetc complete including Cost & conveyancce of all material required etc. A. G.beam | 132.47 | Sqm | 248.7 | ₹32,945.29 |
| 7 | Coloum & Beam | 202.06 | Sqm | 1,204.5 | ₹2,43,381.27 |
| 8 | Lintel | 64.39 | Sqm | 574 | ₹36,959.86 |
| 9 | Stair Case | 12.84 | Sqm | 1,057.6 | ₹13,579.58 |
| 10 | Roof Slab | 130.45 | Sqm | 762.1 | ₹99,415.94 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.79 MB
BOQ_592216.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .