Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.7 LAdmitted-Fee/PreQual/Technical/Finance | -43.10% | ₹5.7 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹5.8 L+₹11,001.99 (1.93%)Admitted-Fee/PreQual/Technical/Finance | -42.00% | ₹5.8 L+₹11,001.99 (1.93%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹6.3 L+₹63,011.44 (11.1%)Admitted-Fee/PreQual/Technical/Finance | -36.80% | ₹6.3 L+₹63,011.44 (11.1%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹6.5 L+₹77,514.07 (13.6%)Admitted-Fee/PreQual/Technical/Finance | -35.35% | ₹6.5 L+₹77,514.07 (13.6%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | - | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
Tender Value
₹10 L
EMD Value
₹20,000
Closing Date
10 Sept 2026, 6:00 pmClosed
XEW REW UDHAMPUR
XEW REW UDHAMPUR
BOQ
2026_RDPR_323193_11
e.NIT No. 155 REW UDHAMPUR of 2026.27 Dated 02-09-2026
Open Tender
Civil Works
Percentage
60 days
Udhampur
NIT
2 documents required · 2 mandatory
₹600
XEW REW UDHAMPUR
₹20,000
14 Sept 2026
3 Sept 2026
11 Sept 2026
3 Sept 2026
10 Sept 2026
3 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth | 27.41 | cum | 479.3 | ₹13,137.61 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 14.74 | cum | 4,826.5 | ₹71,142.61 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 51.95 | cum | 5,733.6 | ₹2,97,860.52 |
| 4 | Hand packing of Stones and Boulders including supply of stones. | 33.32 | cum | 937.7 | ₹31,244.16 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 7.84 | cum | 6,591.25 | ₹51,675.4 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form work for Foundations, footings, bases for columns | 214.48 | cum | 286.35 | ₹61,416.35 |
| 7 | Carriage of sand 140 km MT and 4.00 km AT | 34.88 | cum | 5,386.92 | ₹1,87,895.77 |
| 8 | Carriage of agg 40 km MT and 4.00 km AT | 66.03 | cum | 4,282.95 | ₹2,82,803.19 |
| 9 | Providing CIB including painting, writing etc | 1 | nos | 3,000 | ₹3,000 |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.21 MB
BOQ_1087012.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .