Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹31.1 LAccepted-AOC 28 29 205A LINK ROAD LAJPAT NAGAR III NEW DELHI 110024 | NEW DELHI | NEW DELHI | DELHI | 110024 | L-1 | Accepted-AOC Making approaches in the jungle safari area in Eco Park on ash dyke at NTPC Badarpur | |
| 2 | L-2₹39.5 L+₹2.9 L (7.86%)Rejected-Finance | L-2 | Rejected-Finance Not L-1 Bidder | |
| 3 | L-3₹41.8 L+₹5.1 L (14.0%)Rejected-Finance | L-3 | Rejected-Finance Not L-1 Bidder | |
| 4 | L-4₹49.1 L+₹12.4 L (33.9%)Rejected-Finance A 151 VIDYUT NAGAR NTPC TOWNSHIP NTPC DADRI VILLAGE TOWN VIDYUT NAGAR CITY DADRI GAUTAM BUDDHA NAGAR UTTAR PRADESH 201008 INDIA | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201008 | L-4 | Rejected-Finance Not L-1 Bidder |
Tender Value
₹47.6 L
EMD Value
₹50,000
Closing Date
3 Sept 2020, 3:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Niranjan Naik Manager-Contracts
Faridabad Gas Power Station Village- Mujedi, PO - Nimka Faridabad 121004
Making approaches in the jungle safari area in Eco Park on ash dyke at NTPC Badarpur
2020_NTPC_39502_1
NTPC/SSC - Hydro and DBF(Fbd)/9900205728
Open Tender
Civil Works
Works
90 days
Badarpur Eco Park
As per tender documents
3 documents required · 3 mandatory
₹1,062
NTPC Limited
₹50,000
23 Jul 2021
1 Aug 2020
5 Sept 2020
1 Aug 2020
3 Sept 2020
1 Aug 2020
1 Aug 2020 - 24 Aug 2020
120 days
Amount
Making approaches in the jungle safari area in Eco Park on ash dyke at NTPC Badarpur
Providing good earth to the site from the borrow areas/ locations as available to the contractor (including excavation, loading, transportation, unloading etc. at all leads & lifts) and filling / banking the same in the areas in all leads & lifts in observation mound, roads, pathways & other structures in NTPC eco park, Badarpur (being built on old ash pond of NTPC Badarpur plant) as per the specifications,drawings and instructions of engineer-in-charge to the required grade/levels in layers not exceeding 20 cm in depth including spreading, breaking clods, watering, leveling, any required clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm at site area, surface dressing, removal of rubbish / debris before fillingconsolidating /compacting each deposited layer by ramming, rolling each layer with half tonne roller or wooden / steel rammers and rolling every third layer and the top most layer with minimum 8.0 Tonne capacity power roller upto 95% of maximum dry density of filling materials including cost of carrying compaction test. For the purpose of payment, the volume of compacted filled up earth shall be measured using trapezoidal method for calculation of volume. The spot levels of ground before filling the earth and after filling the earth shall be jointly taken by contractor and owner for the purpose of measurement and calculation of volume for payment. (DSR Ref-Code 2.6.1-Excavation, 1.1.2-Transportation 15 Km, 2.38- filling compaction)
Excavation of ash/ pond ash from locations within NTPC Badarpur Ash Dyke area, loading,staking whereever required, transportingand filling the same at all leads & lifts in the areas as per the specifications,drawings and instructions of engineer-in-charge to the required grade/ levels in layers not exceeding 20 cm in depth including spreading, breaking clods, watering, leveling, any required clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm at site area, surface dressing, removal of rubbish / debris before fillingconsolidating / compacting each deposited layer by ramming, rolling each layer with half tonne roller or wooden / steel rammers and rolling every third layer and the top most layer with minimum 8.0 Tonne capacity power roller upto 90% of maximum dry density of filling materials including cost of carrying compaction test. For the purpose of payment, the volume of compacted filled up ash shall be measured using trapezoidal method for calculation of volume. The spot levels of ground before filling the ash and after filling the ash shall be jointly taken by contractor and owner for the purpose of measurement and calculation of volume for payment. (DSR Ref-Code 2.6.1-Excavation, 1.1.2-Transportation 2 Km, 2.38- filling compaction)
SR39 Engineers Pvt. Ltd.
BGS INFRA
SHAILESH ENGINEERING CO
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .