| # | Company |
|---|---|
| 1 |
Tender Value
Refer Docs
EMD Value
₹5.8 L
Closing Date
4 Jun 2020, 11:00 amClosed
Pallavi Mishra
Power Grid Corporation of India Limited Northern Region-III, Regional Head Quarter 12, Rana Pratap Marg Lucknow (UP) - 226001.
DISMANTLING AND BUYBACK OF DISMANTLED AC SYSTEM, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF CENTRALISED AIR CONDITIONING SYSTEM AT HVDC DADRI SUBSTATION ( Package B)
2002000172/OTHERS/DOM/K00 - NR3 RHQ -1
Open
Air-Conditioner
Works
Dadri S/s
₹25,000
₹5.8 L
11 Sept 2020
3 Mar 2020
5 Jun 2020
3 Mar 2020
3 Jun 2020
3 Mar 2020
20 Mar 2020
Rihand
Water cooled chilling machine Microprosessor based control panel
Supply, installation, testing and commissioniing of water cooled water chilling machine of 2x32TR (minimum) capacity driven by suitable KW motor, with flow swiches at condensor & chiller outlet, microprosessor based control panel accessories etc. for control room area confirming to technical specification attached. Chilling machine shall have interface cards compatible with BMS system.
Supply, installation, testing and commissioniing of water cooled water chilling machine of 50TR (minimum) capacity driven by suitable KW motor, with flow swiches at condensor & chiller outlet, microprosessor based control panel accessories etc. for Service Buidling area confirming to technical specification attached. Chilling machine shall have interface cards compatible with BMS system.
Chilled Water Pump sets
Supply, installation testing and commissioning of end suction back pullout Chilled water centrifugal pump sets (Main & Standby) for chilled water recirculation with suitable KW motor for 1x50TR & 2X32 TR chillers confirming to technical specification attached. The chilled water pumps shall also include the cost of thermal insulation..
Condensor Water Pump sets
Supply, installation testing and commissioning of end suction back pullout condensor water centrifugal pump sets (Main & Standby) for condensor water recirculation with suitable KW motor (Main and standby) for complete HVAC system confirming to technical specification attached.
Cooling Tower (minimum 100TR)
Supply, installation, testing and commissioning of Cooling tower of capacity minimum 100TR (Main and standby) with Base frame, Basin, foundation, piping, valves, Control Panel, Vibration Isolator, Anti Vibration Mountings, Control System for Operating through BMS, Electrical cables, motor starters, ladders etc .
Water treatment Plant
Supply, Installation, Testing & Commissioning of min. 1000 LPH water softening & RO Plant alongwith water storage tank & its associated Piping, tank, Motor, Starter with Rain protective enclosure, bypass arrangement, etc (complete in all respect).
Double Skinned Floor Monunted Air Handling Unit
Supply, installtion and commissioning of Double skinned chilled water AHU floor mounted with extruded Aluminium sections and Galvanised steel sheet outside and inside with blower, blower section and blower motor. AHU shall have 6 Row cooling coil made of Alimumium finned coppwer tube with coil section, MS section pre-filter section. The complete AHU shall conform to standard specifications. The unit is complete with all accessories such as 3 wat automatic valves etc. and connection as required. The capacity of AHU shall be
minimum 18000 m3/hr
minimum 28000 m3/hr.
Piping, Auxilaries and Accessories
Supplying & Fixing of following nominal sizes of MS C class Chilled water piping, Y-Strainer, Valves, Expansion Tank, pressurisation unit, make up tank, combined dirt and air seperator, Auto Air vent etc. complete with companion flanges, nuts, bolts, gas kits fittings supports Chilled Water Plumbing (with necessary clamps, vibration isolators and fittings including valve,strainers,guages) etc. as required and as per specifications and drawings including all necessary civil work Duly Insulated with XLPE of thickness as per specifications.
Supplying & Fixing of following nominal sizes of MS C class Condenser water piping, Y-Strainer, Valves, make up Tank for cooling tower etc. complete with companion flanges, nuts, bolts, gas kits fittings supports Condensor water Plumbing (with necessary clamps, vibration isolators and fittings including valve, strainers ,guages, drain system etc. as required and as per specifications and drawings including all necessary civil work.
MCC/Electrical Panel with Switchgear
Supply, installtion testing and commissioning of MCC/ Electrical panel alongwith switchgear for complete 2x32 TR AC system. MCC panel shall have 2 incomers, with sepereate fedders for each componenet of the AC system with spare fedders.The MCC panels shall have fedders as per technical specification and as per direction of Engineer-in-charge
Supply, installtion testing and commissioning of MCC/ Electrical panel alongwith switchgear for complete 1x50 TR AC system. MCC panel shall have 2 incomers, with sepereate fedders for each componenet of the AC system with spare fedders.The MCC panels shall have fedders as per technical specification and as per direction of Engineer-in-charge
Power and Control Cable
Supply, laying, testing and commissioning of XLPE armoured power and control cable of 1.1KV grade including ceble end termination, glands and lugs, GI conduit etc.
Earthing strips/wires
Supply & laying of GI strip
supply & laying of 8mm SWG GI wire
Cable Tray
Supply, Installation, Testing and Commissioning of Factory Fabricated perforatedhot dipped galvanised cable Tray for electrical cables.
BMS/software and Operation Workstation
Supply, installation testing and commissioning of 1.Web based grahical software providing facilities to create static & and animate graphics, navigation b/w pages, display of logs, changing time zones,popup alarms as per I-O summary. Software shall be able to communicate with all the devices simultaneously. 2. Application software for BMS having facility to exchange information. Sofware shall be able to calculate total power consumption, total refrigration load consumed per day etc, critical alarms generated and its status should be mailed along with daily report. 3. Host PC with preloaded Operating system, Anti-virus, monitor, keyboard, laserjet printer etc Items shall be as per technical specifcation and direction of Engineer-in-charge. 4. Supervisory controllers: Netwrok area/supervisory controllers for BMS and shall support communication with AC plant controllers and other application controllers. Direct Digital controllers: DDC for CDW pump, cooling tower, pumps, AHU, fresh air fan, return air fan etc. Each controller shall be equiped with universal Inputs. Controllers shall have 15% extra IO capacity. 5. Field instrument sensors: supply installation testing and commissioning of tempreture sensors for condensor water system, Ambiant air , humidity sensor, current rely for pumps & vents, fans. Differential pressure switch for AHU blower, Fan filters, tempreture sensor for rreturn tempreture monitoring, level sensor for expansion tank & cooling towers etc. Items shall also include communication cables signal cables and conduits
Total supply Cost
Mandatory spares
Supply of mandatory spares such as drier filter, expansion valve, compressor, cooling tower fan motor, motor for AHUs, microprocessor controllers, starter for AHU, contactor, MCCBs
Dismantling of Existing AC System
Dismantling and removal of existing AHU,pumps, cooling towers, water softeing plant, compressors piping cabling MCC electrical panels etc. and shifting the same to scrap yard. Complete work as per scope of work.
Buyback of dismantled AC system
Buyback of dismantled compressor, motors, pumps, AHU piping valves etc.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html
~$-Annexure - A (BDS) QR Vol-I.doc
doc • 0.00 MB
~$-Annexure-I to Section-V (SCC).docx
docx • 0.00 MB
~$-Section - I IFB SSTE Vol-I.doc
doc • 0.00 MB
~$-Section - I IFB SSTE Vol-I.docx
docx • 0.00 MB
~$-Section - II ITB SSTE SI_SRM_March 2016.doc
doc • 0.00 MB
~$-Section - III BDS SSTE Vol -I.docx
docx • 0.00 MB
~$-Section - V SCC SSTE Vol-I.doc
doc • 0.00 MB
01-Section - I IFB SSTE Vol-I.docx
docx • 0.05 MB
02-Section - II ITB SSTE SI - Sep 2018.pdf
pdf • 0.43 MB
03-Section - III BDS SSTE Vol -I.docx
docx • 0.07 MB
04-Annexure - A (BDS) QR Vol-I.doc
doc • 0.05 MB
05-Annexure - B (BDS) eRA.docx
docx • 0.03 MB
06-Annexure - C (BDS) Make in India.docx
docx • 0.02 MB
07-Annexure - D (BDS) Sample Format for eRA.docx
docx • 0.03 MB
08-Section - IV GCC -S&I Rev 3-DCB.pdf
pdf • 1.93 MB
09-Section - V SCC SSTE Vol-I.doc
doc • 0.08 MB
10-Appendix-I to SCC.doc
doc • 0.17 MB
11-Annexure-I to Section-V (SCC).docx
docx • 0.02 MB
12-Section - VI Forms and Procedures Vol-I.doc
doc • 0.41 MB
Scope of work of HVAC Work.pdf
pdf • 5.27 MB
Bill of Quantities - Detailed description.xlsx
xlsx • 0.02 MB
Check List before Uploading bids.docx
docx • 0.02 MB
1-1st Envelope-Attachments.xls
xls • 4.69 MB
2-Attachment-8_First Envelope.doc
doc • 0.03 MB
3 - Attachment 14 - Integrity Pact.pdf
pdf • 0.20 MB
4-(Mandatory) Attachment 20- Affidavit for self-certification.DOCX
docx • 0.02 MB
5-(Not Applicable) Attachment 21- Certificate by Auditor.docx
docx • 0.02 MB
6-(Mandatory) Attachment 22- Compliance to eRA process.doc
doc • 0.03 MB
7-(Mandatory) Attachment 23 - Declaration regarding events.docx
docx • 0.03 MB
1-1st Envelope-Attachments_1.xls
xls • 4.69 MB
2-Attachment-8_First Envelope_1.doc
doc • 0.03 MB
3 - Attachment 14 - Integrity Pact_1.pdf
pdf • 0.20 MB
4-(Mandatory) Attachment 20- Affidavit for self-certification_1.DOCX
docx • 0.02 MB
5-(Not Applicable) Attachment 21- Certificate by Auditor_1.docx
docx • 0.02 MB
6-(Mandatory) Attachment 22- Compliance to eRA process_1.doc
doc • 0.03 MB
7-(Mandatory) Attachment 23 - Declaration regarding events_1.docx
docx • 0.03 MB
Clarification-01.pdf
pdf • 0.20 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .