| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹78.0 LAccepted-AOC 49 B 139 B TIRUNELVELI BYPASS ROAD SALAI PUDUR KAYATHAR THOOTHUKUDI | TIRUNELVELI | TAMIL NADU | 627001 | L1 | Accepted-AOC Work awarded to L1 Contactor 0.11percentage less than the Estimate rate | |
| 2 | L2₹82.1 L+₹4.1 L (5.22%)Rejected-Finance 26 10 627 759 | TENKASI | TAMIL NADU | 627759 | L2 | Rejected-Finance L2 Rejected |
| Sl No | Description | Qty | Unit | N. Ravichandran L2 | S VELLAPANDI & CO L1 |
|---|---|---|---|---|---|
| 1.00Strengthening of Karisalkulam to Kodukkamparai Road 0/0 - 2/0 (R-133) | |||||
| 2.00 | Clearing the Scrub jungle including all labour charges for burrying and burning etc., | 2,828.16 | Squre Meter | 7 ₹19,797.12 | 6.36 ₹17,987.1 Lowest |
| 3.00 | Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting side drain etc, complete. as per SS20 A | 795.42 | Cubic Meter | 147 ₹1,16,926.74 | 140.45 ₹1,11,716.74 Lowest |
| 4.00 | Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m | 2,455 | Squre Meter | 25 ₹61,375 | 23.36 ₹57,348.8 Lowest |
| 5.00Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction | |||||
| 6.00 | 0/0-1/0 | 357.84 | Cubic Meter | 416 ₹1,48,861.44 | 395.79 ₹1,41,629.49 Lowest |
| 7.00 | 1/0-2/0 | 349.2 | Cubic Meter | 430 ₹1,50,156 | 409.46 ₹1,42,983.43 Lowest |
| 8.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 1,104.74 | Cubic Meter | 2,618 ₹28,92,209.32 | 2,493.76 ₹27,54,956.42 Lowest |
| 9.00 | Providing and laying Prime Coat using Emulsion at the rate of 7 Kg Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 502 of MORTH Rev-5 | 7,364.99 | Squre Meter | 90 ₹6,62,849.1 | 85.26 ₹6,27,939.05 Lowest |
| 10.00 | Providing and laying Tack Coat over WMM surface using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5 | 7,387.5 | Squre Meter | 21 ₹1,55,137.5 | 19.78 ₹1,46,124.75 Lowest |
Tender Value
₹84.2 L
EMD Value
₹85,000
Closing Date
3 Sept 2025, 3:00 pmClosed
Additional Collector (D), DRDA, Thoothukudi
Additional Collector (D), DRDA, Thoothukudi
Thoothukudi District -TN/Tut-22/2025-26-MGSMT/Phase III-Kovilpatti Block - Strengthening / Renewal of 1No of Rural Roads
2025_RDTN_594190_15
DRDPR/DIPR/4437/dt18.08.2025
Open Tender
Civil Works
Item Rate
180 days
Thoothukudi District
As per Tender Documents
4 documents required · 4 mandatory
₹0
₹85,000
DRDA, Thoothukudi
12 Nov 2025
19 Aug 2025
3 Sept 2025
19 Aug 2025
3 Sept 2025
19 Aug 2025
28 Aug 2025
Amount
Strengthening of Karisalkulam to Kodukkamparai Road 0/0 - 2/0 (R-133)
Clearing the Scrub jungle including all labour charges for burrying and burning etc.,
Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting side drain etc, complete. as per SS20 A
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying Prime Coat using Emulsion at the rate of 7 Kg Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 502 of MORTH Rev-5
Providing and laying Tack Coat over WMM surface using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5
Providing and laying Bituminous Concrete to 25/30/40 mm thick using 0.13 cum of 19.00-9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30 kgs of VG30/ VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Vibratory / Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP .(using Power Roller)
Provision for Kilometer stone
Provision for Hectometer Stone
Sub Estimate for Cause way @1250m
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete. (BELOW GROUND LEVEL)
Guard Stone (Two line dressed for 45cm) 23cm dia 1.0m long
Providing Tar pad
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for overall quoted amount (for Construction) above this row in column "BB" for all works in this package}
N. Ravichandran (BID ID -1447701)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .