| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹8.7 LAccepted-AOC | L-1 | Accepted-AOC l-1 | |
| 2 | L-2₹8.9 L+₹877.07 (0.10%)Rejected-Finance C O R WALL NEAR GOVT SR SEC SCHOOL SANJAULI IN WARD NO 17 BENMORE | L-2 | Rejected-Finance 2nd lowest |
| Sl No | Description | Qty | Unit | Shiv Singh L1 | Govind Singh L2 |
|---|---|---|---|---|---|
| 1.00 | Excavation in soil in Hilly Area in all kind of sand by mechanical/manual means including cutting and trimming of side slopes and disposing of excavated earth with a lift upto any lead and lift as per Technical Specification Clause 1603.1 and as per HPPWD, specification of 1990 Volume-I, or as directed by the Engineer-In-Charge. | 45 | Per Cubic meter | 260 ₹11,700 Lowest | 262 ₹11,790 |
| 2.00 | Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a any lead and lift , dressing of sides and bottom and backfilling in trenches with excavated suitable material.useful material available from excavation to be properly stacked and handed over to the department free of cost including all leads and lifts, as per HPPWD, specification of 1990 volume-I or as directed by the Engineer-In-Charge | 49.73 | Per Cubic | 410 ₹20,389.3 Lowest | 412 ₹20,488.76 |
| 3.00 | Providing and Laying concrete concrete 1:6:12 (1cement: 6 sand: 12 graded stone aggregate 40mm nominal size)for plain/reinforced concrete in open foundations complete as per drawing and technical specification clauses 802, 803, 1202 and 1203 including all leads and lifts, as per HPPWD, specification of 1990 volume-I or as directed by the Engineer-In-Charge | 14.54 | Per Cubic meter | 5,500 ₹79,970 Lowest | 5,505 ₹80,042.7 |
| 4.00 | Providing and Laying concrete concrete 1:4:8 (1cement: 4 sand: 8 graded stone aggregate 40mm nominal size) in open foundations complete as per drawing and technical specification clauses 802, 803, 1202 and 1203 including all leads and lifts, as per HPPWD, specification of 1990 volume-I or as directed by the Engineer-In-Charge | 9.45 | Per Cubic meter | 5,660 ₹53,487 Lowest | 5,662 ₹53,505.9 |
| 5.00 | Random rubble masonrystone masonry(un-coursed/brought to courses)with hard stone ofapproved quality in foundation in cement mortar 1:6(1cement:6sand) complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203.including all leads and lifts, or as per HPPWD,. Specification of 1990 Volume-I, asdirected by the Engineer-In-Charge. | 88.17 | Per Cubic meter | 5,100 ₹4,49,667 Lowest | 5,105 ₹4,50,107.85 |
| 6.00 | Construction of dry rubble masonary for retaining walls, breast walls,revetment walls and parapets etc. for sub-structure and super structure complete as per drawing and technical specification clauses 704.6 & 1302.5 including all leads and lifts, as per HPPWD, specification of 1990 volume-I as directed by the Engineer-In-Charge | 77.58 | Per Cubic meter | 3,560 ₹2,76,184.8 Lowest | 3,562 ₹2,76,339.96 |
Tender Value
₹8.5 L
EMD Value
₹17,000
Closing Date
12 Sept 2022, 6:00 pmClosed
E E B and R Divn HPPWD ROHRU
E E B and R Divn HPPWD ROHRU
SH C O B Wall at Rd.1.620 to 1.665
2022_PWD_64072_12
PW-RD-GA-Tender/22-6223-6322 dt.01.07.2022
Open Tender
Civil Works
Item Rate
60 days
ROHRU
Please refer Tender documents.
11 documents required · 11 mandatory
₹500
₹17,000
27 Dec 2025
5 Sept 2022
13 Sept 2022
5 Sept 2022
12 Sept 2022
5 Sept 2022
Amount
Excavation in soil in Hilly Area in all kind of sand by mechanical/manual means including cutting and trimming of side slopes and disposing of excavated earth with a lift upto any lead and lift as per Technical Specification Clause 1603.1 and as per HPPWD, specification of 1990 Volume-I, or as directed by the Engineer-In-Charge.
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a any lead and lift , dressing of sides and bottom and backfilling in trenches with excavated suitable material.useful material available from excavation to be properly stacked and handed over to the department free of cost including all leads and lifts, as per HPPWD, specification of 1990 volume-I or as directed by the Engineer-In-Charge
Providing and Laying concrete concrete 1:6:12 (1cement: 6 sand: 12 graded stone aggregate 40mm nominal size)for plain/reinforced concrete in open foundations complete as per drawing and technical specification clauses 802, 803, 1202 and 1203 including all leads and lifts, as per HPPWD, specification of 1990 volume-I or as directed by the Engineer-In-Charge
Providing and Laying concrete concrete 1:4:8 (1cement: 4 sand: 8 graded stone aggregate 40mm nominal size) in open foundations complete as per drawing and technical specification clauses 802, 803, 1202 and 1203 including all leads and lifts, as per HPPWD, specification of 1990 volume-I or as directed by the Engineer-In-Charge
Random rubble masonrystone masonry(un-coursed/brought to courses)with hard stone ofapproved quality in foundation in cement mortar 1:6(1cement:6sand) complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203.including all leads and lifts, or as per HPPWD,. Specification of 1990 Volume-I, asdirected by the Engineer-In-Charge.
Construction of dry rubble masonary for retaining walls, breast walls,revetment walls and parapets etc. for sub-structure and super structure complete as per drawing and technical specification clauses 704.6 & 1302.5 including all leads and lifts, as per HPPWD, specification of 1990 volume-I as directed by the Engineer-In-Charge
Govind Singh
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .