Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.8 LAccepted-AOC | L1 | Accepted-AOC Ok | |
| 2 | L2₹8.8 L+₹6,171.33 (0.70%)Rejected-AOC | L2 | Rejected-AOC Reject | |
| 3 | L3₹9.9 L+₹1.1 L (12.8%)Rejected-AOC | L3 | Rejected-AOC Reject | |
| 4 | L4₹9.9 L+₹1.1 L (13.0%)Rejected-AOC CHENNAI | CHENNAI | TAMIL NADU | 600001 | L4 | Rejected-AOC Reject |
| Sl No | Description | Qty | Unit | M ELUMALAI L4 | KAVYA ENTERPRISES L1 | RER civil works L2 | DREAM ENTERPRISES L3 |
|---|---|---|---|---|---|---|---|
| 1.00construction of Community Sanitary Complex for Boys Toilet at PUMS at Senneerkuppam village in Senneerkuppam Panchayat. -Type 4 | |||||||
| 2.00 | Earth work excavation for foundation in all classes of soils and sub soil to full depth except in hard rock requiring blasting but inclusive of shoring strutting if required for the sides of foundation. | 29.19 | cum | 256 ₹7,472.64 | 200 ₹5,838 Lowest | 200 ₹5,838 Lowest | 256 ₹7,472.64 |
| 3.00 | Filling withM sand including cost and coveyance of all materials to work site and all labour charges etc. | 5.38 | cum | 1,724 ₹9,275.12 | 1,500 ₹8,070 Lowest | 1,900 ₹10,222 | 1,724 ₹9,275.12 |
| 4.00 | Filling with Carted Earth including cost and coveyance of all materials to work site and all labour charges etc. | 7.69 | cum | 42.5 ₹326.83 Lowest | 100 ₹769 | 100 ₹769 | 42.5 ₹326.83 Lowest |
| 5.00 | CC 1:4:8 mix using 40mm HBG metal including cost and conveyance and all labour charges and materials charges etc,.. | 5.13 | cum | 5,600 ₹28,728 | 5,000 ₹25,650 Lowest | 5,000 ₹25,650 Lowest | 5,600 ₹28,728 |
| 6.00 | Supply and fabrication of steel including cost and conveyance and all labour charges etc. complete. | 0.86 | mt | 89,990 ₹77,391.4 | 90,000 ₹77,400 | 87,000 ₹74,820 Lowest | 89,990 ₹77,391.4 |
| 7.00 | Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete | 6.39 | cum | 8,900 ₹56,871 | 5,500 ₹35,145 Lowest | 6,000 ₹38,340 | 8,900 ₹56,871 |
| 8.00 | ABOVE | 5.05 | cum | 9,300 ₹46,965 | 8,500 ₹42,925 Lowest | 9,000 ₹45,450 | 9,200 ₹46,460 |
| 9.00Supplying and errecting for sides & soffits including supports and strutting upto 3.29m height for plane surface in all floors including cost and conveyance and all labour charges etc. | |||||||
| 10.00 | BELOW | 33.77 | sqm | 520 ₹17,560.4 | 530 ₹17,898.1 | 500 ₹16,885 Lowest | 520 ₹17,560.4 |
Tender Value
₹9.9 L
EMD Value
₹25,000
Closing Date
18 Aug 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Block Development office VP
Poonamallee union
construction of Community Sanitary Complex for Girls Toilet at PUMS at Senneerkuppam village in Senneerkuppam Panchayat
2026_RDTN_690144_1
SBM2065/2026/A9 PME-05
Open Tender
Civil Works
Works
Poonamallee
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹25,000
Yes
Block Development office VP
31 Oct 2026
1 Aug 2026
18 Aug 2026
1 Aug 2026
18 Aug 2026
1 Aug 2026
1 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | construction of Community Sanitary Complex for Boys Toilet at PUMS at Senneerkuppam village in Senneerkuppam Panchayat. -Type 4 | - | - | - | - |
| 2 | Earth work excavation for foundation in all classes of soils and sub soil to full depth except in hard rock requiring blasting but inclusive of shoring strutting if required for the sides of foundation. | 29.19 | cum | 263.78 | ₹7,699.74 |
| 3 | Filling withM sand including cost and coveyance of all materials to work site and all labour charges etc. | 5.38 | cum | 1,967.8 | ₹10,586.76 |
| 4 | Filling with Carted Earth including cost and coveyance of all materials to work site and all labour charges etc. | 7.69 | cum | 120.99 | ₹930.41 |
| 5 | CC 1:4:8 mix using 40mm HBG metal including cost and conveyance and all labour charges and materials charges etc,.. | 5.13 | cum | 5,661.23 | ₹29,042.11 |
| 6 | Supply and fabrication of steel including cost and conveyance and all labour charges etc. complete. | 0.86 | mt | 91,887.94 | ₹79,023.63 |
| 7 | Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete | 6.39 | cum | 6,664.36 | ₹42,585.26 |
| 8 | ABOVE | 5.05 | cum | 9,390.85 | ₹47,423.79 |
| 9 | Supplying and errecting for sides & soffits including supports and strutting upto 3.29m height for plane surface in all floors including cost and conveyance and all labour charges etc. | - | - | - | - |
| 10 | BELOW | 33.77 | sqm | 547.5 | ₹18,489.08 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.92 MB
Tenderdocument.pdf
Tender Documents • 0.59 MB
BOQ_829595.xls
BOQ • 0.33 MB
Date.pdf
PDF • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .