| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAdmitted-Finance NO 74 NEERPAZHANI VIRAALIMALAI TALUKA PUDUKKOTTAI DISTRICT 622 515 | PUDUKKOTTAI | TAMIL NADU | 622515 | ₹1.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.5 Cr+₹7.3 L (5.00%)Admitted-Finance | ₹1.5 Cr+₹7.3 L (5.00%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | MEGALA CONSTRUCTION L1 | P GANESAN L2 |
|---|---|---|---|---|---|
| 1.00Desilting of Alamarathu Oorani and Construction of Bathing ghat, Baby Bond Lining wall and Inlet @ Kidavankudi in Kathalur Panchayat | |||||
| 1.01 | Clearing the Light jungle without uprooting and disposing of the same as directed by the Engineer in charge of the Works and as per technical specification | 140.4 | Sqm | 5.05 ₹709.02 Lowest | 5.3 ₹744.12 |
| 1.02 | Earth work excavation in all Soils except requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deployed earth moving machinery and tippers including benching and formation of bunds, breaking clods sectioning etc., complete | 1,573.69 | Cum | 50 ₹78,684.5 Lowest | 52.5 ₹82,618.73 |
| 1.03 | Sectioning during farming bunds when earth mooving machinery Lorries and rollers are used for consolidation. | 1,557.94 | Cum | 12 ₹18,695.28 Lowest | 12.6 ₹19,630.04 |
| 1.04 | Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification. | 28.32 | Cum | 193.2 ₹5,471.42 Lowest | 202.86 ₹5,745 |
| 1.05 | Collection and supply of M.Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications. | 5.07 | Cum | 1,726.14 ₹8,751.53 Lowest | 1,812.45 ₹9,189.12 |
| 1.06 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete | 12.38 | Cum | 4,721.76 ₹58,455.39 Lowest | 4,957.85 ₹61,378.18 |
| 1.07 | Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer. | 67.83 | Sqm | 418.5 ₹28,386.86 Lowest | 439.43 ₹29,806.54 |
| 1.08 | Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete | 44.82 | Cum | 6,060.12 ₹2,71,614.58 Lowest | 6,363.13 ₹2,85,195.49 |
| 1.09Leading Channel and Lining wall in Baby Pond | |||||
Tender Value
₹1.5 Cr
EMD Value
₹1.5 L
Closing Date
3 Aug 2022, 3:00 pmClosed
Project Director,
DRDA, Pudukkottai
Deepening and Improvements to the Ooranies_13 nos. in AGAMT-II-2021-22 Village panchayats of Viralimalai Block in Pudukkottai District in Package no.71
2022_RDTN_242400_1
PUDUKKOTTAI DISTRICT - AGAMT II - 2021-2022
Open Tender
Civil Works
Item Rate
180 days
PUDUKKOTTAI
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹1.5 L
23 Aug 2022
18 Jul 2022
3 Aug 2022
18 Jul 2022
3 Aug 2022
18 Jul 2022
Amount
Desilting of Alamarathu Oorani and Construction of Bathing ghat, Baby Bond Lining wall and Inlet @ Kidavankudi in Kathalur Panchayat
Clearing the Light jungle without uprooting and disposing of the same as directed by the Engineer in charge of the Works and as per technical specification
Earth work excavation in all Soils except requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deployed earth moving machinery and tippers including benching and formation of bunds, breaking clods sectioning etc., complete
Sectioning during farming bunds when earth mooving machinery Lorries and rollers are used for consolidation.
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Collection and supply of M.Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Leading Channel and Lining wall in Baby Pond
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Inlet .
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Collection and supply of M.Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Supplying, hoisting, laying and fixing in position of RCC hume pipes NP3 class with suitable collars for sluices including labour and jointing materials as directed by the departmental officers and complying with standard specification.
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Desilting of Veerammal Oorani and Construction of Bathing ghat, Baby Bond, Lining wall and Inlet @ Akkalnayakkanpatti in Kathalur Panchayat
Clearing the Light jungle without uprooting and disposing of the same as directed by the Engineer in charge of the Works and as per technical specification
Earth work excavation in all Soils except requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deployed earth moving machinery and tippers including benching and formation of bunds, breaking clods sectioning etc., complete
Sectioning during farming bunds when earth mooving machinery Lorries and rollers are used for consolidation.
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Collection and supply of M.Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Leading Channel and Lining wall in Baby Pond
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Inlet .
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Collection and supply of M.Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Supplying, hoisting, laying and fixing in position of RCC hume pipes NP3 class with suitable collars for sluices including labour and jointing materials as directed by the departmental officers and complying with standard specification.
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Desilting of Thammakulam Oorani and Construction of Bathing ghat,Baby Bond, Lining wall, Inlet and Retaining wall @ Vadakkiyur in Boothakudi Panchayat
Clearing the Light jungle without uprooting and disposing of the same as directed by the Engineer in charge of the Works and as per technical specification
Earth work excavation in all Soils except requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deployed earth moving machinery and tippers including benching and formation of bunds, breaking clods sectioning etc., complete
Sectioning during farming bunds when earth mooving machinery Lorries and rollers are used for consolidation.
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Collection and supply of M.Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Leading Channel and Lining wall in Baby Pond
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Inlet .
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Collection and supply of M.Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Supplying, hoisting, laying and fixing in position of RCC hume pipes NP3 class with suitable collars for sluices including labour and jointing materials as directed by the departmental officers and complying with standard specification.
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Retaining wall
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Collection and supply of M.Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Desilting of Periya Oorani and Construction of Bathing ghat, Baby Bond,Lining wall, Inlet, Outlet and Retaining wall @ Keelapatti in Kodumbalur Panchayat
Clearing the Light jungle without uprooting and disposing of the same as directed by the Engineer in charge of the Works and as per technical specification
Earth work excavation in all Soils except requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deployed earth moving machinery and tippers including benching and formation of bunds, breaking clods sectioning etc., complete
Sectioning during farming bunds when earth mooving machinery Lorries and rollers are used for consolidation.
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Collection and supply of M.Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Leading Channel and Lining wall in Baby Pond
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Inlet and Outlet .
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Collection and supply of M.Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Supplying, hoisting, laying and fixing in position of RCC hume pipes NP3 class with suitable collars for sluices including labour and jointing materials as directed by the departmental officers and complying with standard specification.
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Retaining wall
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Collection and supply of M.Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Deepening Construction of Bathing ghat, Lining wall to baby pond, Retaining wall, Inlet to the Kattapuli Oorani at Nathakadu in Mandaiyur Panchayat
Clearing light jungles and clearing away carefully and burning it including all labour charges etc
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed.
Sectionong during farming bunds when earth mooving machinerinies lorries and rollers are used for consolidation
Earth work excavation and depositing on sides with initial lead and lift in hard graually soil as per SS 20B for Narrow foundation.
Collection and supply of M.Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle of size 25 x 25 x 3mm for boarding laid over silver oak joists(Country wood) of size 10 x 6.5cm spaced @ about 90cm c/c and supported by casurina props of 10 - 13cm dia. spaced @ 75cm c/c etc., complete
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Cost & Supply of RCC Pipe 900mm dia (NP3)
Laying and fixing charges RCC 900mm NP3 pipe
Provision for Sitting Bench arrangements on Bund
Desilting of Tharma Oorani and Construction of Bathing ghat,Baby Bond, Lining wall and Inlet @ Therkku Kodikkalpatti in Viralur Panchayat
Clearing the Light jungle without uprooting and disposing of the same as directed by the Engineer in charge of the Works and as per technical specification
Earth work excavation in all Soils except requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deployed earth moving machinery and tippers including benching and formation of bunds, breaking clods sectioning etc., complete
Sectioning during farming bunds when earth mooving machinery Lorries and rollers are used for consolidation.
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Collection and supply of M.Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Leading Channel and Lining wall in Baby Pond
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Inlet .
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Collection and supply of M.Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Supplying, hoisting, laying and fixing in position of RCC hume pipes NP3 class with suitable collars for sluices including labour and jointing materials as directed by the departmental officers and complying with standard specification.
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Desilting of Athan Oorani and Construction of Bathing ghat,Baby Bond, Lining wall and Inlet @ Kodikkalpatti in Viralur Panchayat
Clearing the Light jungle without uprooting and disposing of the same as directed by the Engineer in charge of the Works and as per technical specification
Earth work excavation in all Soils except requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deployed earth moving machinery and tippers including benching and formation of bunds, breaking clods sectioning etc., complete
Sectioning during farming bunds when earth mooving machinery Lorries and rollers are used for consolidation.
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Collection and supply of M.Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Leading Channel and Lining wall in Baby Pond
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Inlet .
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Collection and supply of M.Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Supplying, hoisting, laying and fixing in position of RCC hume pipes NP3 class with suitable collars for sluices including labour and jointing materials as directed by the departmental officers and complying with standard specification.
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Desilting of Chellandiyamman Oorani and Construction of Bathing ghat, Baby Bond,Lining wall and Inlet @ Patnapatti in Rajalipatti Panchayat
Clearing the Light jungle without uprooting and disposing of the same as directed by the Engineer in charge of the Works and as per technical specification
Earth work excavation in all Soils except requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deployed earth moving machinery and tippers including benching and formation of bunds, breaking clods sectioning etc., complete
Sectioning during farming bunds when earth mooving machinery Lorries and rollers are used for consolidation.
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Collection and supply of M.Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Leading Channel and Lining wall in Baby Pond
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Inlet .
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Collection and supply of M.Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Supplying, hoisting, laying and fixing in position of RCC hume pipes NP3 class with suitable collars for sluices including labour and jointing materials as directed by the departmental officers and complying with standard specification.
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Deepening of Ayyan Oorani and Construction of Bathing ghat, Lining wall at Kallukattupatti in Rajalipatti Panchayat
Clearing the Light jungle without uprooting and disposing of the same as directed by the Engineer in charge of the Works and as per technical specification
Earth work excavation in all Soils except requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deployed earth moving machinery and tippers including benching and formation of bunds, breaking clods sectioning etc., complete
Sectioning during farming bunds when earth mooving machinery Lorries and rollers are used for consolidation.
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Collection and supply of M.Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Leading Channel and Lining wall in Baby Pond
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Inlet .
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Collection and supply of M.Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Supplying, hoisting, laying and fixing in position of RCC hume pipes NP3 class with suitable collars for sluices including labour and jointing materials as directed by the departmental officers and complying with standard specification.
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Desilting of Pulayakavundan Oorani and Construction of Bathing ghat, Baby Bond,Lining wall, Inlet and Retaining wall @ Kalkuthanpatti in Rajagiri Panchayat
Clearing the Light jungle without uprooting and disposing of the same as directed by the Engineer in charge of the Works and as per technical specification
Earth work excavation in all Soils except requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deployed earth moving machinery and tippers including benching and formation of bunds, breaking clods sectioning etc., complete
Sectioning during farming bunds when earth mooving machinery Lorries and rollers are used for consolidation.
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Collection and supply of M.Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Leading Channel and Lining wall in Baby Pond
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Inlet .
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Collection and supply of M.Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Supplying, hoisting, laying and fixing in position of RCC hume pipes NP3 class with suitable collars for sluices including labour and jointing materials as directed by the departmental officers and complying with standard specification.
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Retaining wall
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Collection and supply of M.Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Deepening of Kuppan Oorani and Construction of Bathing ghat,Baby Bond, Lining wall and Inlet @ Pootchipatti in Nambampatti Panchayat
Clearing the Light jungle without uprooting and disposing of the same as directed by the Engineer in charge of the Works and as per technical specification
Earth work excavation in all Soils except requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deployed earth moving machinery and tippers including benching and formation of bunds, breaking clods sectioning etc., complete
Sectioning during farming bunds when earth mooving machinery Lorries and rollers are used for consolidation.
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Collection and supply of M.Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Leading Channel and Lining wall in Baby Pond
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Inlet .
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Collection and supply of M.Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Supplying, hoisting, laying and fixing in position of RCC hume pipes NP3 class with suitable collars for sluices including labour and jointing materials as directed by the departmental officers and complying with standard specification.
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Deepening of Pattathalachi Oorani and Construction of Bathing ghat,Baby Bond, Lining wall, Outlet and Inlet @ Kavarapatti in Nambampatti Panchayat
Clearing the Light jungle without uprooting and disposing of the same as directed by the Engineer in charge of the Works and as per technical specification
Earth work excavation in all Soils except requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deployed earth moving machinery and tippers including benching and formation of bunds, breaking clods sectioning etc., complete
Sectioning during farming bunds when earth mooving machinery Lorries and rollers are used for consolidation.
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Collection and supply of M.Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Leading Channel and Lining wall in Baby Pond
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Inlet .
Earthwork excavation for foundation in all soils and depositing on bank inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing the surplus earth in places as shown by the departmental officers with the standard specification.
Collection and supply of M.Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Supplying, hoisting, laying and fixing in position of RCC hume pipes NP3 class with suitable collars for sluices including labour and jointing materials as directed by the departmental officers and complying with standard specification.
Providing Steel Centering for RCC Slabs, beams of plain surfaces including strutting 3m height using MS Sheet, BG 10 gauge thick of size 90 x 60 cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists os size 10cm 6.50 cm spaced at about 90cm and supported by causrina props of 10cm to 13cm dia spaced about 75cm centre to centre and removing the centering and strutting after specified period without damaging the concrete laid complying with standard specification and as directed by the Engineer.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Deepening Construction of baby pond, Retaining wall, Inlet to the Vellai Oorani at Mathayanaipatty in Mathayanaipatty Panchayat
Clearing light jungles and clearing away carefully and burning it including all labour charges etc
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed.
Sectionong during farming bunds when earth mooving machinerinies lorries and rollers are used for consolidation
Earth work excavation and depositing on sides with initial lead and lift in hard graually soil as per SS 20B for Narrow foundation.
Collection and supply of M.Sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle of size 25 x 25 x 3mm for boarding laid over silver oak joists(Country wood) of size 10 x 6.5cm spaced @ about 90cm c/c and supported by casurina props of 10 - 13cm dia. spaced @ 75cm c/c etc., complete
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Cost & Supply of RCC Pipe 900mm dia (NP3)
Laying and fixing charges RCC 900mm NP3 pipe
Provision for Sitting Bench arrangements on Bund
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
P GANESAN
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.44 MB
BOQ_286572.xls
BOQ • 0.44 MB
71_Tech.pdf
Tender Documents • 0.66 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .