Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.9 LAdmitted-Finance | ₹5.9 L | L1 | Admitted-Finance |
| 2 | L2₹6.9 LAdmitted-Finance | ₹6.9 L | L2 | Admitted-Finance |
| 3 | L3₹7.9 LAdmitted-Finance | ₹7.9 L | L3 | Admitted-Finance |
| 4 | L4₹8.2 LAdmitted-Finance | ₹8.2 L | L4 | Admitted-Finance |
| 5 | L5₹10.9 LAdmitted-Finance | ₹10.9 L | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | GAUTAM GOGOI L2 | R M ASSOCIATE L5 | JITU GOGOI L4 | LAMBIT CHETIA L3 | M/S NORTH EASTERN CONSTRUCTION L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Applying priming coat : With readymixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/steelworks. | 4,062.56 | Sqm | 42.47 ₹1.7 L | 67.4 ₹2.7 L | 50.94 ₹2.1 L | 49.2 ₹2.0 L | 17.52 ₹71,176.05 |
| 2.00 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade: One or more coats on old work | 4,062.56 | Sqm | 66 ₹2.7 L | 102.8 ₹4.2 L | 77.69 ₹3.2 L | 75.04 ₹3.0 L | 110.92 ₹4.5 L |
| 3.00 | Cleaning of dust, dirt and rust from the existing structural metal surface by manual method using emery paper, grinding wheels and necessary power tools. All consumable such as safety belt, emery paper, grinder wheels and necessary power tools. All consumable such as safety belt, emery paper, grinder wheels ,wire brush , painting brush etc. will be applicator scope. | 4,062.56 | Sqm | 24 ₹97,501.44 | 38.42 ₹1.6 L | 29.04 ₹1.2 L | 28.05 ₹1.1 L | 8.49 ₹34,491.13 |
| 4.00 | Making bamboo scaffolding for cleaning & painting of structural materials of gas pipeline, Service water & Drinking water pipeline & cable tray etc. , plant area AGBPS, NEEPCO Ltd. | 3,576 | Sqm | 43 ₹1.5 L | 67.49 ₹2.4 L | 51.01 ₹1.8 L | 49.27 ₹1.8 L | 9.44 ₹33,757.44 |
Tender Value
Refer Docs
EMD Value
₹21,778
Closing Date
24 Mar 2026, 4:30 pmClosed
GM ( C),CWC
CWC,AGBPS, NEEPCO LTD, Bokuloni,Pin-786191
Painting of Service water and Drinking water pipelines Cable tray structure the related Peripheral structures interconnecting the pump house DMplantGBS, ETP buildingCooling water pump house CW Electrical bay and the CW pump house and the
2026_NEEPC_268257_1
NIT NO.15 DATED 21/02/2026
Open Tender
Civil Works
180 days
Plant areacwcAGBPS NEEPCO
As per NIT
2 documents required · 2 mandatory
₹590
Yes
SBCOLLECTINTONEEPCOSBIBOKULONI
₹21,778
Yes
1 Jun 2026
21 Feb 2026
27 Mar 2026
23 Feb 2026
24 Mar 2026
23 Feb 2026
23 Feb 2026 - 23 Mar 2026
Applying priming coat : With readymixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/steelworks.
Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade: One or more coats on old work
Cleaning of dust, dirt and rust from the existing structural metal surface by manual method using emery paper, grinding wheels and necessary power tools. All consumable such as safety belt, emery paper, grinder wheels and necessary power tools. All consumable such as safety belt, emery paper, grinder wheels ,wire brush , painting brush etc. will be applicator scope.
Making bamboo scaffolding for cleaning & painting of structural materials of gas pipeline, Service water & Drinking water pipeline & cable tray etc. , plant area AGBPS, NEEPCO Ltd.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.57 MB
BOQ_312170.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid