Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.0 LAdmitted-Finance 00 BARETHAR KHURD BARETHAR KHURD KHAJUHA FATEHPUR UTTAR PRADESH 212657 | FATEHPUR | UTTAR PRADESH | 212657 | -1.96% | ₹5.0 L | L1 | Admitted-Finance |
| 2 | L2₹5.1 L+₹4,928.83 (0.98%)Admitted-Finance | -1.00% | ₹5.1 L+₹4,928.83 (0.98%) | L2 | Admitted-Finance |
Tender Value
₹5.1 L
EMD Value
₹51,000
Closing Date
28 May 2026, 5:00 pmClosed
Executive Engineer Minor Irrigation Div- Prayagraj
Executive Engineer Minor Irrigation Div- Prayagraj
CONSTRUCTION OF ROOF TOP RAIN WATER HARVESTING CLUSTER 13 DISTRICT FATEHPUR
2026_UPMID_1147904_13
126/M.I./AC./NIVIDA SUCHNA/2026-27 DATE 02-05-2026
Open Tender
Civil Works
Percentage
60 days
as per Work/Item Description
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
Executive Engineer Minor Irrigation Division
₹51,000
Yes
11 Sept 2026
13 May 2026
29 May 2026
15 May 2026
28 May 2026
15 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of cement concrete or brick or granolithic floor i/c base concrete and i/c dismantled material disperse in distance 60 m. | 36 | Sqm | 620 | ₹22,320 |
| 2 | E/W excavation for boring pit recharge pit in ordinary soil lift up to 1.5 m and lead up to 50 m. | 34.12 | Cum | 100.59 | ₹3,432.13 |
| 3 | C .C Cin 1:3:6 (cement : fine sand :40-mm B/B normal size ) and curing complete i/c cost of fromwork in foundation and floor. | 1.36 | Cum | 4,596 | ₹6,250.56 |
| 4 | Class M-150 B/W in 1:4 (cement and coarse sand) mortar in recharge pit and small chamber at 0.35 m thick wall. | 7.1 | Cum | 5,801 | ₹41,187.1 |
| 5 | 20 mm thick cement plaster in 1:4 with cement ,course sand mortar two coat 17mm and finished coat 3mm thick neat cement . | 51.4 | Sqm | 194.4 | ₹9,992.16 |
| 6 | R.C.C .work in 1:2:4 with cement , coarse sand and 20 mm stone ballast cover slab of reacharge pit , small chamber. | 2.04 | Cum | 6,989.5 | ₹14,258.58 |
| 7 | C.C .work in 1:2:4 with cement , coarse sand and 20 mm stone ballast cover slab of reacharge pit , small chamber. | 1.94 | Cum | 6,989.51 | ₹13,559.65 |
| 8 | Mild steel or iron plain such as R.C.C .and R.B work | 1.92 | Qtl | 7,550 | ₹14,496 |
| 9 | Supply and laying 40mm B/B for filter meadia. | 0.64 | Cum | 1,855 | ₹1,187.2 |
| 10 | Supply and laying of bricks M-150 Flat soling (S.O.B.) | 3.18 | Sum | 428 | ₹1,361.04 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.64 MB
BOQ_2148118.xls
BOQ • 0.32 MB
corrigendumRooftop.pdf
PDF • 0.10 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .