| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.5 LAccepted-AOC | ₹17.5 L | L1 | Accepted-AOC L1 QUOTED |
| 2 | L2₹20.0 L+₹2.5 L (14.0%)Rejected-AOC | ₹20.0 L+₹2.5 L (14.0%) | L2 | Rejected-AOC L2 QUOTED |
| 3 | L3₹26.9 L+₹9.4 L (53.5%)Rejected-AOC KOTHI NO 901 2ND FLOOR PHASE 3B 2 SAS NAGAR MOHALI PB 160059 | MOHALI | SAS NAGAR | PUNJAB | 160059 | ₹26.9 L+₹9.4 L (53.5%) | L3 | Rejected-AOC L3 QUOTED |
| 4 | L4₹29.6 L+₹12.1 L (69.0%)Rejected-AOC 368 PHASE 4 SAS NAGAR MOHALI 160059 PB | S A S NAGAR | PUNJAB | 160059 | ₹29.6 L+₹12.1 L (69.0%) | L4 | Rejected-AOC L4 QUOTED |
| Sl No | Description | Qty | Unit | SARJIT SINGH AND CO. L1 | M/s VARINDER PAL SINGH AND CO L3 | Baba Engineers and Contractors L4 | yogesh kumar contractor L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | De-silting of drain at depth upto 1.50 metre by rough excavation for cleaning existing drain and getting out in muddy soil including cutting small bushes, small trees girth not exceeding 30 cm from sides of brick lined drain, including removing excavated materials exceeding 50 metre but not exceeding 250 metre and depositing where directed at a level not exceeding 1.5 metre above from the starting point, complete all as specified and directed. | 3,000 | CUBIC METRE | 126 ₹3,78,000 Lowest | 190 ₹5,70,000 | 150 ₹4,50,000 | 216 ₹6,48,000 |
| 2.00 | De-silting of drain at depth from 1.50m to 3.00 m by rough excavation for cleaning existing drain and getting out in muddy soil including cutting small bushes, small trees girth not exceeding 30 cm from sides of brick lined drain, including removing excavated materials exceeding 50 metre but not exceeding 250 metre and depositing where directed at a level not exceeding 1.5 metre above from the starting point , complete all as specified and directed. | 900 | CUBIC METRE | 131.4 ₹1,18,260 Lowest | 270 ₹2,43,000 | 150 ₹1,35,000 | 270 ₹2,43,000 |
| 3.00 | Material and labour for Brick work with sub-class `B' bricks, straight or curved on plan exceeding 6 M mean radius built in cement sand mortar 1:4 complete in and including demolition of brickwork or stone boulder masonary built in cement mortar including all quoins, arches, pillars etc for the area where unservicable bricks retrived and removal of rubbish outside MoD land , complete all as specified and directed. | 2 | CUBIC METRE | 3,600 ₹7,200 Lowest | 6,200 ₹12,400 | 6,500 ₹13,000 | 3,600 ₹7,200 Lowest |
| 4.00 | Material and labour for Rendering 15 mm thick on other than fair faces of brick work or concrete surfaces in cement mortar 1:4 finished even and smooth without using extra cement , complete all as specified and directed. | 10 | SQUARE METRE | 225 ₹2,250 Lowest | 270 ₹2,700 | 250 ₹2,500 | 270 ₹2,700 |
| 5.00 | Providing and operating two Tractors (with driver) with Jungle Jim for removal of grass shrubs / vegetation, scraping / cutting or ploughing with harrow/ cultivator) on requirements basis (within 48 hrs of notice / demand) including two casual labours / day for removing the rubbish from site to out side MoD land complete all as specified and directed.
Note: (I) Providing and operating two tractors with jungle Jims alongwith drivers including two labourers shall be measured as one unit i.e one Hour.
(II). In case only one tractor (with driver with jungle jims and one labour is required and deployed, the payment under this item shall be reduced by 50% i.e half unit shall be considered against one hour working. | 1,020 | Per Hour | 891 ₹9,08,820 | 1,470 ₹14,99,400 | 1,800 ₹18,36,000 | 810 ₹8,26,200 Lowest |
| 6.00 | Providing and operating two Bush cutter (with operator) with Bush cutter Blade for grass shrubs / Vegetation scraping / cutting on requirement basis (within 48 Hrs of notice / demand) and Two casual labour / day for removing the rubbish from the outside MoD land, complete all as specified and directed.
Note: (I) Providing and operating two Bush cutter alongwith operators including two labourers shall be measured as one unit i.e one Hour.
(II). In case only one Bush cutter (with operator with Bush cutter and one labour is required and deployed, the payment under this item shall be reduced by 50% i.e half unit shall be considered against one hour working. | 745 | Per Hour | 450 ₹3,35,250 | 480 ₹3,57,600 | 700 ₹5,21,500 | 360 ₹2,68,200 Lowest |
| 6.01Notes :- (a) The work will be carried out by patch work near runway. (b). Minimum one JCB, tractor required for drain cleaning as when reqd. (c) Dedicated team are required for drain cleaning. Safety kits to be provided by contractor for safety of Labours without any extra cost. Snake bite kit is necessary during execution of work. Necessary T&P is to be ready at every stage during execution of wks all as directed and specified by Engr-in-charge. (e) Contractor shall arrange/provide the safety life jackets for all concerned Trademen, labour and supervisor deployed at site. (f) Contractor shall also provide at site the necessary precautionary Sign boards and Flags. (g) All arrangements shall be made to comply the rules/regulatuons of the airfield aurthorities. (h) The quoted rates shall deem to be included for above provisions and nothing extra shall be admissible on this account. | |||||||
Tender Value
₹35 L
EMD Value
₹70,000
Closing Date
13 Jul 2026, 6:00 pmClosed
GE (AF) Chandigarh
GE (AF) Chandigarh, 12 wing (AF) Chandigarh
REPAIR TO DRAIN, JUNGLE JIM AND BUSH CUTTER IN THE AIRFIELD AREA AT AF STATION CHANDIGARH
2026_MES_772341_1
GE (AF)/CHD/T-08/2026-27
Open Tender
Civil Works
Item Rate
183 days
Chandigarh
Please refer Tender documents.
10 documents required · 10 mandatory
₹500
GE (AF) Chandigarh
₹70,000
Yes
10 Sept 2026
15 Jun 2026
20 Jul 2026
15 Jun 2026
13 Jul 2026
29 Jun 2026
15 Jun 2026 - 22 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | De-silting of drain at depth upto 1.50 metre by rough excavation for cleaning existing drain and getting out in muddy soil including cutting small bushes, small trees girth not exceeding 30 cm from sides of brick lined drain, including removing excavated materials exceeding 50 metre but not exceeding 250 metre and depositing where directed at a level not exceeding 1.5 metre above from the starting point, complete all as specified and directed. | 3,000 | CUBIC METRE | - | - |
| 2 | De-silting of drain at depth from 1.50m to 3.00 m by rough excavation for cleaning existing drain and getting out in muddy soil including cutting small bushes, small trees girth not exceeding 30 cm from sides of brick lined drain, including removing excavated materials exceeding 50 metre but not exceeding 250 metre and depositing where directed at a level not exceeding 1.5 metre above from the starting point , complete all as specified and directed. | 900 | CUBIC METRE | - | - |
| 3 | Material and labour for Brick work with sub-class `B' bricks, straight or curved on plan exceeding 6 M mean radius built in cement sand mortar 1:4 complete in and including demolition of brickwork or stone boulder masonary built in cement mortar including all quoins, arches, pillars etc for the area where unservicable bricks retrived and removal of rubbish outside MoD land , complete all as specified and directed. | 2 | CUBIC METRE | - | - |
| 4 | Material and labour for Rendering 15 mm thick on other than fair faces of brick work or concrete surfaces in cement mortar 1:4 finished even and smooth without using extra cement , complete all as specified and directed. | 10 | SQUARE METRE | - | - |
| 5 | Providing and operating two Tractors (with driver) with Jungle Jim for removal of grass shrubs / vegetation, scraping / cutting or ploughing with harrow/ cultivator) on requirements basis (within 48 hrs of notice / demand) including two casual labours / day for removing the rubbish from site to out side MoD land complete all as specified and directed.
Note: (I) Providing and operating two tractors with jungle Jims alongwith drivers including two labourers shall be measured as one unit i.e one Hour.
(II). In case only one tractor (with driver with jungle jims and one labour is required and deployed, the payment under this item shall be reduced by 50% i.e half unit shall be considered against one hour working. | 1,020 | Per Hour | - | - |
| 6 | Providing and operating two Bush cutter (with operator) with Bush cutter Blade for grass shrubs / Vegetation scraping / cutting on requirement basis (within 48 Hrs of notice / demand) and Two casual labour / day for removing the rubbish from the outside MoD land, complete all as specified and directed.
Note: (I) Providing and operating two Bush cutter alongwith operators including two labourers shall be measured as one unit i.e one Hour.
(II). In case only one Bush cutter (with operator with Bush cutter and one labour is required and deployed, the payment under this item shall be reduced by 50% i.e half unit shall be considered against one hour working. | 745 | Per Hour | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.47 MB
Tender08.pdf
Tender Documents • 1.03 MB
BOQ_864842.xls
BOQ • 0.28 MB
Amdt1.pdf
PDF • 0.69 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .