Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹35.1 L
EMD Value
₹70,120
Closing Date
14 Oct 2026, 4:00 pm3d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer RnB DIVISION SUMBAL
Sumbal Sonawari
Completion of two roomed school building at HS Ganastan
2026_PWDJK_327233_1
NIT NO 71 OF 2026-27/SUMBAL DIVISION
Open Tender
Civil Works
Percentage
90 days
Sumbal Sonawari
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,100
Executive Engineer RnB DIVISION SUMBAL
₹70,120
6 Oct 2026
6 Oct 2026
15 Oct 2026
6 Oct 2026
14 Oct 2026
6 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and laying of soling stone size over 150mm on level (hand packed) watering ramming complete under raft and flooring.. | 20.33 | Cum | 1,000 | ₹20,330 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering all work upto plinth level. M-7.5 1:4:8 (1 cement: 4 coarse sand: 8 graded stone aggregate) 40mm nominal size crushed in foundation and under flooring. | 9.35 | Cum | 5,202 | ₹48,638.7 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering – all works upto plinth level: M-10 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 40 mm nominal size crushed ) | 0.82 | Cum | 5,673.4 | ₹4,652.19 |
| 4 | Providing and laying in position specified grade of Reinforced cement concrete M20 (1:1.5:3) excluding the cost of centering, shuttering, finishing and reinforcement.All works above plinth including carriage complete. | 30.22 | Cum | 9,106.5 | ₹2,75,198.43 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work (Kitply shuttering) for:-Foundation ,footings,bases of columns | 4.11 | SM | 286.35 | ₹1,176.9 |
| 6 | suspended floors, slab | 153.73 | SM | 718.2 | ₹1,10,408.89 |
| 7 | Beam,lintels | 51.02 | SM | 577.55 | ₹29,466.6 |
| 8 | Reinforcement for R.C.C work including straighening, cutting, bending, placing in position and bending all complete. (TMT bars). | 2,719.56 | KG | 123.2 | ₹3,35,049.79 |
| 9 | Brick work with common burnt clay (non modular) bricks claas designation 75 in in superstructure above plinth level upto floor five level including curing in 1:6 cement mortar | 52.7 | Cum | 9,027 | ₹4,75,722.9 |
| 10 | Demolishing brick work manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: In cement mortar | 0.99 | Cum | 1,458.45 | ₹1,443.87 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.19 MB
BOQ_1107082.xls
BOQ • 0.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .