| 1 | 1₹16.4 LAccepted-AOC | ₹16.4 L Quoted ₹1.6 Cr | 1 | Accepted-AOC 1 |
| 2 | 2₹1.7 Cr+₹4.1 L (2.48%)Rejected-Finance MAHUADABAR PACHAT MISHROLIYA DISTRICT GORAKHPUR UTTAR PRADESH | GORAKHPUR | UTTAR PRADESH | 273001 | ₹1.7 Cr+₹4.1 L (2.48%) | 2 | Rejected-Finance 2 |
| 3 | 3₹2.2 Cr+₹51.5 L (31.3%)Rejected-Finance | ₹2.2 Cr+₹51.5 L (31.3%) | 3 | Rejected-Finance 3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical Rejected as per Evaluation |
Tender Value
₹2.3 Cr
EMD Value
₹13.5 L
Closing Date
10 Apr 2026, 12:00 pmClosed
Superintending Engineer
Office of the Superintending Engineer Gorakhpur Circle PWD Gorakhpur
Janpad Maharajganj me Gram Bhagwanpur Amahwa Jharuta ghat par Seu 5x5x5 M Box culvert pahuch marg awam Atirikt pahuch marg ka Nirman Kary Lot No 1 of 1
2026_CEGKP_1132753_1
2335/33Com-Gkp Circle/2026 Dated 25-03-2026
Open Tender
Civil Works
Percentage
Mahrajganj
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹13.5 L
12 Jun 2026
3 Apr 2026
10 Apr 2026
3 Apr 2026
10 Apr 2026
3 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of embankment with material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 & MORD specification Sr N0-3.4 (GST will be paid extra as applicable but including labour cess) | - | cum. | - | - |
| 2 | CTSB- Providing, Laying and spreading Material on a prepared sub grade, adding cement (OPC) @ 2% by weight to the spread material, manully, mixing in place with rotavator and compaction with the road roller at OMC to achive the desired unconfined compressive strength and to from a layar sub-base. (GST will be paid extra as applicable but including labour cess) | - | cum. | - | - |
| 3 | CTB- Providing, Laying and spreading Material on a prepared sub-base, adding cement (OPC) @ 4% by weight to the spread material, manully, mixing in place with rotavator and compaction with the road roller at OMC to achive the desired unconfined compressive strength and to from a layar base. (GST will be paid extra as applicable but including labour cess) | - | cum. | - | - |
| 4 | Tack Coat- Providing and applying tack coat with bitumen VG- 10 grade using pressure distributor at the rate of 0.35 kg per sqm on the prepared bituminous/ granular surface cleaned with mechanical broom. As per T.S.C. 503 & MORD specification Sr N0-5.2(IV). (GST will be paid extra as applicable but including labour cess & Bitumen. | - | Sqm | - | - |
| 5 | Premix Carpet- Providing, laying and rolling of open - graded premix surfacing of 20 mm thickness composed of 13.2 mm and 11.2 mm aggregates (Dala quarry) either using VG-10 grade bitumen to required line grade and level to serve as wearing coarse on a previously prepared base by manual means including mixing in a sutabule mixol laying and rolling with a smooth wheeled roller 8-10 tonne capacity, finished to required level and grades. as per T.S.C. 508. & MORD specification Sr No-5.9 (GST will be paid extra as applicable but including labour cess & Bitumen. | - | Sqm | - | - |
| 6 | Seal Coat type C- Providing and laying seal coat by manual means with VG- 10 grade Bitumen sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per T.S.C. 510 & MORD specification Sr. N0-5.12 (GST will be paid extra as applicable but including labour cess & Bitumen. | - | Sqm | - | - |
| 7 | Excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.5 m. & Iead upto 30 m. Including filling, watering & ramming of excavated earth into the trenches or into the space between the building & the sides of foundation trenches or in to the plinth removal & disposal of surplus earth as directed by the engineer in charge upto a distance of 30m from the foundation trenches. (Excluding Royalty). as per S.I. No 251 (GST will be paid extra as applicable but including labour cess & Bitumen. | - | cum. | - | - |
| 8 | Concrete with 4cm(1½"). Gauge brick ballast, fine sand of 1.25 fineness modulous and cement in proportion of 8:4:1 in foundation and under floor, including supply of all materials, Iabour and T&P etc. required for proper completion of the work. as per S.I.No. 275 (GST will be paid extra as applicable but including labour cess & Bitumen. | - | cum. | - | - |
| 9 | Brick masonry work in Cement mortar in foundation complete excluding pointing and plastering as per drawing and technical specification clause 600, 1202 and 1203 II & Sl No 11.5 II Brick masonery in 1:4 cement mortar (GST will be paid extra as applicable but including labour cess & Bitumen. | - | cum. | - | - |
| 10 | Supply of 600 mm dia Hume pipe NP-3 type (GST will be paid extra as applicable but including labour cess & Bitumen. | - | Rm. | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.03 MB
Tendernotice_2.pdf
PDF • 0.68 MB
BOQ_2114280.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .