Loading…
Loading…
Tender Value
₹5.7 L
EMD Value
₹11,310
Closing Date
27 Jul 2026, 12:00 pmDue tomorrow
Exe. Engineer Roads Division No 3 MC Chandigarh
Exe. Engineer Roads Division No 3 MC Chandigarh
RAISING KERB LEVEL TO STOP ILLEGAL PARKINGS IN OPEN LANDS IN SECTOR 17, CHANDIGARH.
2026_MCC_92839_4
MCC/2026/ROADS-III/04-19
Open Tender
Civil Works - Others
Percentage
60 days
Work
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,000
₹11,310
20 Jul 2026
20 Jul 2026
27 Jul 2026
20 Jul 2026
27 Jul 2026
20 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Taking out existing kerb stones of all types from footpath/ central verge,including removal of mortar etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction Engineer-in-Charge. (N.S.) | - | Rmt | - | - |
| 2 | Laying at or near ground level old kerb stones of all types in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints, except at sharp curve, shall not be more than 5 mm), including making drainage opening wherever required etc. complete as per direction of Engineer-in-charge. | - | Rmt | - | - |
| 3 | Providing and fixing PCC kerbs of size 1'-0" x 1'-0" having 4" thickness at bottom and 3" thickness at top and made of plain cement concrete 1:2:4 duly vibrated and compacted. The rates also includes fixing in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints, except at sharp curve, shall not be more than 5 mm), including making drainage opening wherever required etc. complete as per direction of Engineer-in-charge. Length of finished kerb edging shall be measured for payment. | - | Rmt | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.97 MB
BOQ_115419.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].