Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC | ₹1.1 Cr | L1 | Accepted-AOC Lowest Amount Quoted BY M VENKATESHBABU(11128623.66)accepted |
| 2 | L2₹1.3 Cr+₹15.7 L (14.1%)Rejected-Finance NO 33 PILLAYAR KOIL ST PULIYAMBEDU CHENNAI 77 | CHENNAI | ₹1.3 Cr+₹15.7 L (14.1%) | L2 | Rejected-Finance Above Estimate Rate |
| 3 | Not Admitted-Fee/PreQual/Technical NO 99 A VILAPAKKAM ROAD ARUMBAKKAM VILLAGE MANNAVEDU POST TIRUVALLUR DISTRICT 602 021 | ARUMBAKKAM | TIRUVALLUR | TAMIL NADU | 602021 | - | - | Not Admitted-Fee/PreQual/Technical EMD Not Furnished |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical EMD Not Furnished |
Tender Value
₹1.1 Cr
EMD Value
₹1.1 L
Closing Date
3 May 2023, 3:00 pmClosed
Collector/Chairman
Collector/Chairman DADR Tiruvallur
1 Strengthening of BT Road at Meppur golden city to navasakthi nagar main road at Meppur Panchayat 2 Strengthening of BT Road at Meppur to Chembarambakkm Road at Meppur Panchayat 3 Strengthening of BT Road in Kattupakkam Senthurpuram Road to 50fee
2023_RDTN_305135_1
DIPR/2142/Tender/2023
Open Tender
Civil Works
Item Rate
180 days
AC(D)DADR Tiruvallur
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹1.1 L
Yes
AC(D)DADR Tiruvallur
10 Jul 2023
22 Apr 2023
3 May 2023
22 Apr 2023
3 May 2023
25 Apr 2023
25 Apr 2023
Amount
1.Strengthening of BT Road at Meppur golden city to navasakthi nagar main road in Meppur panchayat
Picking the Worn-out BT Surface including incidential charges and cleaning of all labour charges and machinery charges etc,..complete.
Clearing the Scrub jungle removing from away site including incidential charges and all labour charges with burning and ashes including all labour charges etc,..complete.
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 150mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Providing and laying 50 MM Compacted thick Bituminous macadam using 26.5 - 11.2 mm graded metal and 0.10 cum of 13.20 - 2.6 mm graded metal and 0.10 cum of 2.36 mm and below with 49.50 kgs of buitumen for premixing per 10 sqm including cost and conveyance of materials to the work site and stacking them to the department metric gauge for premeasurement, heating the bitumen in bitumen boiler, heating the aggregates and mixing them with bitumen in Mini Hot Mix plant for premix carpet only, rolling by 80-100 power roller for premix carpet and seal coat separately including labour charges for spreading the mix of premix carpet, application of bitumen for seal coat over premix carpet etc, including hire charges and fuel charges for Mini Hot Mix Plant, bitumen boiler, Power roller and all other tools and plants employed etc., complete as per clause 504 of MORTH specification.(50 mm thick),
BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen and Plastic Waste Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
collection and supply of carted earth from approved quarry an average lead 1km including cost and conveyance of all materials to site anf labour charges etc.
Provision for Road Marking with hot applied Thermoplastic Compound wuith Reflectorising Glass Beds on Bitiminous surface etc,..
Provision for HM Stone Charges etc,.
Provision for Sign Board
Provision for Name board citizen information board charges with painting
MAINTANCE
For the First Year from the date of completion of work
For the Second Year from the date of cpmpletion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
2.Strengthening of BT Road at Meppur to chembarambakkam road in Meppur panchayat
Picking the Worn-out BT Surface including incidential charges and cleaning of all labour charges and machinery charges etc,..complete.
Clearing the Scrub jungle removing from away site including incidential charges and all labour charges with burning and ashes including all labour charges etc,..complete.
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 150mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Providing and laying 50 MM Compacted thick Bituminous macadam using 26.5 - 11.2 mm graded metal and 0.10 cum of 13.20 - 2.6 mm graded metal and 0.10 cum of 2.36 mm and below with 49.50 kgs of buitumen for premixing per 10 sqm including cost and conveyance of materials to the work site and stacking them to the department metric gauge for premeasurement, heating the bitumen in bitumen boiler, heating the aggregates and mixing them with bitumen in Mini Hot Mix plant for premix carpet only, rolling by 80-100 power roller for premix carpet and seal coat separately including labour charges for spreading the mix of premix carpet, application of bitumen for seal coat over premix carpet etc, including hire charges and fuel charges for Mini Hot Mix Plant, bitumen boiler, Power roller and all other tools and plants employed etc., complete as per clause 504 of MORTH specification.(50 mm thick)
BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen and Plastic Waste Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for and compaction with power roller etc.complete, for Side berms etc,.complete,.
Provision for Road Marking with hot applied Thermoplastic Compound wuith Reflectorising Glass Beds on Bitiminous surface etc,..
Provision for HM Stone Charges etc,.
Provision for Sign Board
Provision for Name board citizen information board charges with painting
MAINTANCE
For the First Year from the date of completion of work
For the Second Year from the date of cpmpletion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
3.Strengthening of BT Road in Kattupakkam Senthurpuram Road to 50feet road via Murugan Koil Street at Kattupakkam Panchayat
Picking the Worn-out BT Surface including incidential charges and cleaning of all labour charges and machinery charges etc,..complete.
Clearing the Scrub jungle removing from away site including incidential charges and all labour charges with burning and ashes including all labour charges etc,..complete.
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 150mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Providing and laying 50 MM Compacted thick Bituminous macadam using 26.5 - 11.2 mm graded metal and 0.10 cum of 13.20 - 2.6 mm graded metal and 0.10 cum of 2.36 mm and below with 49.50 kgs of buitumen for premixing per 10 sqm including cost and conveyance of materials to the work site and stacking them to the department metric gauge for premeasurement, heating the bitumen in bitumen boiler, heating the aggregates and mixing them with bitumen in Mini Hot Mix plant for premix carpet only, rolling by 80-100 power roller for premix carpet and seal coat separately including labour charges for spreading the mix of premix carpet, application of bitumen for seal coat over premix carpet etc, including hire charges and fuel charges for Mini Hot Mix Plant, bitumen boiler, Power roller and all other tools and plants employed etc., complete as per clause 504 of MORTH specification.(50 mm thick)
BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen and Plastic Waste Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for and compaction with power roller etc.complete, for Side berms etc,.complete,.
Provision for Road Marking with hot applied Thermoplastic Compound wuith Reflectorising Glass Beds on Bitiminous surface etc,..
Provision for HM Stone Charges etc,.
Provision for Sign Board
Provision for Name board citizen information board charges with painting
MAINTANCE
For the First Year from the date of completion of work
For the Second Year from the date of cpmpletion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
M/s. New Mohana Constructions
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .