Tender Value
₹98.7 L
EMD Value
₹1.7 L
Closing Date
9 Sept 2026, 6:00 pm
CWE JABALPUR
HQ COMMANDER WORKS ENGINEER, SUPPLY MARG, P B NO. 54, JABALPUR - 482001
PROVN OF KOTE AND MAGAZINE (ARMOURIES) AT 506 ABW UNDER GE (EAST) JABALPUR
2026_MES_783975_1
82763/E8
Open Tender
Civil Works
Lump-sum
180 days
JABALPUR
As per NIT
7 documents required · 7 mandatory
₹1,000
Yes
GE (EAST) JABALPUR
₹1.7 L
Yes
11 Aug 2026
11 Aug 2026
16 Sept 2026
11 Aug 2026
9 Sept 2026
2 Sept 2026
11 Aug 2026 - 1 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Schedule 'A' Part - I: BUILDING This Schedule contains Sl item No. 1.01 which is not prepriced by MES and the prepriced rate indicated in Col - 5 as `0.00 indicates this fact only. The tenderer is required to quote their rates in Column 6. | |||||
| 1.01 | Lumpsum price worked out by the contractor against Schedule 'A' Part-I (Building) for Design, development of structural design and construction of PROVN OF KOTE AND MAGAZINE (ARMOURIES) complete in all respect as per architectural drawings, Schedule of finishes, relevant TD drawings, Design Basis Report and specifications complete all as specified and as shown on drawings. | 1 | Lump sum | - | - |
| 2 | Sch 'A' Part-II (Internal Water Supply) Lump sum price worked out by the contractor for 'Internal Water Supply' as listed in Schedule 'A' Part-II against the lump sum price inserted by the MES. | 1 | Lump sum | 41,316.23 | ₹41,316.23 |
| 3 | Sch 'A' Part-III (Internal Electric Supply) Lump sum price worked out by the contractor for 'Internal Electric Supply' as listed in Schedule 'A' Part-III against the lump sum price inserted by the MES. | 1 | Lump sum | 3,60,102.98 | ₹3,60,102.98 |
| 4 | Sch 'A' Part-IV (External Water supply) Lump sum price worked out by the contractor for 'External Water supply' as listed in Schedule 'A' Part-IV against the lump sum price inserted by the MES. | 1 | Lump sum | 28,960.54 | ₹28,960.54 |
| 5 | Sch 'A' Part-V (External Electric supply) Lump sum price worked out by the contractor for 'External Electric supply' as listed in Schedule 'A' Part-V against the lump sum price inserted by the MES. | 1 | Lump sum | 64,022.19 | ₹64,022.19 |
| 6 | Sch 'A' Part-VI (PATH ) Lump sum price worked out by the contractor for 'Road & Hard standing' as listed in Schedule 'A' Part-VI against the lump sum price inserted by the MES. | 1 | Lump sum | 12,49,502.82 | ₹12,49,502.82 |
| 7 | Sch 'A' Part-VII (Sewage Disposal) Lump sum price worked out by the contractor for 'Sewage Disposal' as listed in Schedule 'A' Part-VII against the lump sum price inserted by the MES. | 1 | Lump sump | 1,94,869.85 | ₹1,94,869.85 |
| 8 | Sch 'A' Part-VIII (Area Drainage) Lump sum price worked out by the contractor for 'Area Drainage' as listed in Schedule 'A' Part-VIII against the lump sum price inserted by the MES. | 1 | Lump sump | 11,16,089.5 | ₹11,16,089.5 |
| 9 | Sch 'A' Part-IX (Compound Wall and Gate) Lump sum price worked out by the contractor for '(Compound Wall and Gate)' as listed in Schedule 'A' Part-VIII against the lump sum price inserted by the MES. | 1 | Lump sump | 6,07,950.65 | ₹6,07,950.65 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
BOQ_878397.xls
BOQ • 0.30 MB
Tender_82763.pdf
Tender Documents • 2.55 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].