| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-AOC ARENGABAD CHARGOLA BAZAR DIST SRIBHUMI | SEPAHIJALA | TRIPURA | 799011 | ₹1.2 Cr | L1 | Accepted-AOC Lowest Bidder |
| 2 | L2₹1.2 CrRejected-AOC MOHANPUR PT III P O MOHANPUR P S ALGAPUR HAILAKNDI PIN 788150 | HAILAKANDI | ASSAM | 788150 | ₹1.2 Cr | L2 | Rejected-AOC 2nd Lowest Bidder |
| 3 | Rejected-Technical PURBOKITTERBOND II AMALA MONACHERRA CITY TOWN HAILAKANDI P O AMALA P S HAILAKANDI DISTRICT HAILAKANDI PIN 788164 | HAILAKANDI | ASSAM | 788164 | - | - | Rejected-Technical Technically Dis-Qualified |
| 4 | Rejected-Technical VILL LOWAIRPOA PO HATIKHIRA SRIBHUMI | - | - | Rejected-Technical Hard Copy of Technical Bid Not submitted |
| 5 | Rejected-Technical VILL BONOMALI ROAD SRIBHUMI | - | - | Rejected-Technical Hard Copy of Tecnnical Bid not submitted |
| Sl No | Description | Qty | Unit | U G BUILDER AND CONSULTANCY L2 | RAJAN DEY L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), luding dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 559 | Cum | 315 ₹1,76,085 | 314 ₹1,75,526 |
| 2.00 | Providing and laying 75 mm thick compacted bed of dry brick aggregate of 40 mm thick nominal size including spreading, well ramming, consolidating and grouting with jamuna sand, including finishing smooth etc. complete as per direction of Engineerin- charge | 768.92 | Sqm | 216 ₹1,66,086.72 | 215 ₹1,65,317.8 |
| 3.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :4.1.5 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 34.59 | Cum | 7,490 ₹2,59,079.1 | 7,483 ₹2,58,836.97 |
| 4.00 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.5.22.6 Thermo-Mechanically Treated bars of grade Fe-500D or more | 840.25 | Kg | 98 ₹82,344.5 | 98 ₹82,344.5 |
| 5.00 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level.5.22A.6 Thermo-Mechanically Treated bars of grade Fe-500D or more. | 1,229.3 | Kg | 98 ₹1,20,471.6 | 98 ₹1,20,471.6 |
| 6.00 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) | 54.3 | Cum | 9,160 ₹4,97,388 | 9,159 ₹4,97,333.7 |
| 7.00 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size) | 45.65 | Cum | 11,160 ₹5,09,454 | 11,153 ₹5,09,134.45 |
| 8.00 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). | 60.23 | Cum | 11,800 ₹7,10,714 | 11,738 ₹7,06,979.74 |
| 9.00 | Centering and shuttering including strutting, propping etc. and removal of form for :5.9.1 Foundations, footings, bases of columns, etc. for mass
concrete | 124.32 | Sqm | 350 ₹43,512 | 337 ₹41,895.84 |
| 10.00 | Centering and shuttering including strutting, propping etc. and removal of form for :Suspended floors, roofs, landings, balconies and access platform | 345.26 | Sqm | 950 ₹3,27,997 | 839 ₹2,89,673.14 |
Tender Value
₹1.1 Cr
EMD Value
₹2.2 L
Closing Date
4 Jun 2026, 2:00 pmClosed
SE PWD Silchar Building Circle Silchar
SE PWD Silchar Building Circle Silchar
Civil, Sanitary and Water supply and Electrical Work
2026_PWBNH_52366_1
SBC/CS/2026-27/03
Open Tender
Civil Works - Building
540 days
Near District Library, Sribhumi
As per NIT
5 documents required · 5 mandatory
₹2,500
₹2.2 L
Yes
SE PWD Silchar Building Circle Silchar
15 Jun 2026
16 May 2026
4 Jun 2026
16 May 2026
4 Jun 2026
16 May 2026
16 May 2026 - 4 Jun 2026
27 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), luding dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | - | Cum | 108.82 | - |
| 2 | Providing and laying 75 mm thick compacted bed of dry brick aggregate of 40 mm thick nominal size including spreading, well ramming, consolidating and grouting with jamuna sand, including finishing smooth etc. complete as per direction of Engineerin- charge | 1 | Sqm | 345.61 | ₹345.26 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :4.1.5 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | - | Cum | 4,292.86 | - |
| 4 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.5.22.6 Thermo-Mechanically Treated bars of grade Fe-500D or more | - | Kg | 181.99 | - |
| 5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level.5.22A.6 Thermo-Mechanically Treated bars of grade Fe-500D or more. | 0.29 | Kg | 7,250.67 | ₹2,124.45 |
| 6 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) | 1 | Cum | 8,197.46 | ₹8,189.26 |
| 7 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size) | 1 | Cum | 7,994.66 | ₹7,986.67 |
| 8 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). | 1 | Cum | 8,820.29 | ₹8,811.47 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for :5.9.1 Foundations, footings, bases of columns, etc. for mass
concrete | 1 | Sqm | 368.71 | ₹368.34 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for :Suspended floors, roofs, landings, balconies and access platform | 1 | Sqm | 6,045.24 | ₹6,039.19 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.40 MB
Tendernotice_2.pdf
PDF • 0.65 MB
FOB.pdf
Additional Documents • 0.17 MB
BOQ_82788.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid