Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.8 LAccepted-Finance F 16 GANESH SHANKAR VIDYARTHI NAGAR PANKI KANPUR | KANPUR | KANPUR | UTTAR PRADESH | L1 | Accepted-Finance FOUND OK | |
| 2 | L2₹11.0 L+₹1.2 L (12.8%)Accepted-Finance | L2 | Accepted-Finance FOUND OK | |
| 3 | L3₹11.9 L+₹2.1 L (21.9%)Accepted-Finance PAHROOPUR DARIYABAD RAM SANEHI GHAT BARABANKI BARABANKI UTTAR PRADESH 225404 | BARABANKI | UTTAR PRADESH | 225404 | L3 | Accepted-Finance FOUND OK |
Tender Value
Refer Docs
EMD Value
₹9,900
Closing Date
30 Mar 2021, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE EDC BARABANKI
33/11 KV SUBSTATION BADHEL BARABANKI
Execution of work against deposit head for shifting of lines etc at Palhari Xing and Civil line Xing in EDD BBK 1st under EDC Barabanki .
2021_MVVNL_573146_2
111/EDC BARABANKI/2020-21
Open Tender
Electrical Works
Fixed-rate
30 days
EDD BARABANKI
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
SE EDC BARABANKI
₹9,900
Yes
31 Mar 2021
24 Mar 2021
31 Mar 2021
24 Mar 2021
30 Mar 2021
24 Mar 2021
150 days
Amount
Safe loading Carriage including unloading and proper stacking of following materials from central store Barabanki / JE Store to site of work.
STP Pole 11/13 Mtr long
ACSR Rabbit/Racoon Conductor
Stay Set Complete
ABC 3x95/120 sqmm
Other Line Material
11 KV 3x185 sqmm XLPE Cable.
Erection of Stay set of 16x1800 mm rod duly painted with red oxide,anchor plate, thumble turn buckle and stay insulate etc. digging of pit of size of size 0.4x0.6x1.6 m for grouting 1:3:6 cement concrete, with stay of size 7/8 SWG, nuzzling & Grouting.
Stringing and sagging of 11 KV line with ACSR Rabbit/ Raccon Conductor including nuzzling binding and jumpering (weasal conductor will be provided by the department)
Errection , Grouting, Plinthing of Substation type double pole with PCC Pole 8.5 Mtr. Long including mounting of Top Channal Dropper Channel, base angle with clamps with nut & bolt 11 KV line including grouting of support and plinthing 300 mm above ground level, fitting of 11 KV pin & Pin insulator. 1/6 of total lenght of poles will remain under the ground and planted on stone pad of Size 300x300x75 MM.
Errection , Grouting, Plinthing of single ST Pole for Stringing and sagging of conductor 1/6 of total length of poles will remain under the ground and planted on stone pad of size 300x300x75 mm.
Stringing & sagging of 3x95sqmm LT AB Cable
Provinding & Fixing of various nut & bolts.
Dismentalling of Double Pole, 250 KVA TY/f etc with cartage of 250 KVA T/f for new place and on new plinth with cartage of old material 1000 kg to Store Centre Barabanki.
Guarding of 11 KV line with GI wire of Size 8 SWG as per RESPO Norms.
Construction of masonry type t/f plinth of size 2X2X1.5 M brick , cement coarse sand and brick ballast ,filling of sand in hellow space , plastring outer surface in ratio 1:4:6 top of the plinth 4" thickness grouting of 2 nos. MS Channel of size 100X50X2000 mm on the top of the plinth for replacement of T/F ( All the material should be arranged by the contractor)
Construction of rataining wall , fabrication & erection of wiremesh fencing of size 5+3 &2.0 M height around T/F and with retaining wall & 1 no. gate with locking arrangement made of MS angle iron of size 50X50X6 mm jointed with nut & bolts . The panel must be supported with MS flat of size 50X6 mm. Wiremesh of size 10 SWC rectangle type , its painting as per norms of RESO( All the material should be arranged by the contractor)
Boring type earthing of Double Pole & Transforemr by boring and lowering of 20M deep or upto water level 1.5" dia B class' Jindal make GIPipe its connection in between transformer and boring with G.I. Strip of size 50x6 mm (All the material will be arranged by the contractor)
Installation of 250 KVA T/F with energisation.
Laying of 11 KV 3x185 Sq. mm XLPE cable .Cable will be laid with the gap in between both the cable 0.15 M in between two consecutive rows of first class bricks after making 3” pad of local sand on the bottom of trench, filling of local sand in hollow space upto covering level and covered with first class bricks mm Construction of Packa Tranch 1 mt. wide and 1.5 Mtr. Deep with first class bricks and sand mortar.(All the material will be arranged by the contractor )
Hoisting of 11 kV 3x185 Sq. mm XLPE cable on double pole with proper jumpering. The cable will be passed through GI pipe of size 150 mm diapipe will be clamped with pole at the bottom, middle and top .(All the material will be arranged by the contractor )
High pressure testing of 11 kV 3x120 Sq. mm XLPE cable upto 18 KV for the duration of 05 minutes after completion of laying, joints and terminations (Testing Equipment will be arranged by the contractor).
Providing & fixing of Straight throught 1x185 sqmm cable boxes.
Providing & fixing of Outdoor 1x185 sqmm cable boxes.
Providing & fixing GI Pipe 6".
OM SUNIL CONTRATOR AND SUPPLIERS
M/s Shyam Ji Gramin Sewa Sansthan
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .