Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹2.2 Cr
EMD Value
₹3.0 L
Closing Date
26 Nov 2026, 6:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
CWE(Navy) Chennai
Commander Works Engineer(Navy) Military Engineer Services Fort St George RajajiSalai Chennai600009
81515 PROVN OF INFRASTRUCTURE FOR SETTING UP FOR FOB AT TUTICORIN UNDER GE TIRUNELVELI
2026_MES_796438_1
CWE/NAVY/TVL/81513/E8 OF 2026-27
Open Tender
Civil Works
Item Rate
120 days
TUTICORIN
AS PER NIT AND TENDER DOCUMENTS
8 documents required · 8 mandatory
₹2,000
GE Tirunelveli
₹3.0 L
Yes
29 Oct 2026
29 Oct 2026
28 Nov 2026
29 Oct 2026
26 Nov 2026
19 Nov 2026
29 Oct 2026 - 5 Nov 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation in all kinds of soil by mechanical means (Hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5m, as directed by Engineer-in charge. | 1,597.5 | Cum | - | - |
| 2 | All as per Item No. 01 above, but depth exceeding 1.50m and not exceeding 3.0m complete all as specified. | 1,597.5 | Cum | - | - |
| 3 | Material and labour for rubble stone boulders weighing 30 kg to 50 kg obtained from approved quarries and quality as specified including stacking at site for taking stack measurements and filling in gabion boxes, hand packed tightly in layers including interstices filled with small stones not exceeding 10% of the volume complete all as specified and as directed.
Notes:
a. Gabion boxes shall be measured and paid for seperately.
b. The measurement shall be as per the volume of gabion box given here-in-after. | 3,195 | Cum | - | - |
| 4Supply and erecting/placing in position gabion boxes of the following sizes, made of 16 mm diameter polypropylene rope, mechanically woven with mesh opening size of 150mm x 150mm having following properties including placing at desired locations, profiles, elevation after filling with boulders/pitching including tying of all gabion boxes together using the same 16 mm PP rope, T&P, frame work for lifting etc complete all as specified and as directed. a) Mesh opening size - 150 mm x 150 mm b) Liner density of rope – 116 Ktex c) Mass in kg per sqm of gabions – 2.3 d) Breaking strength of rope – Min 34 KN e) Breaking strength after abrasion resistance of rope for 1000 cycles – Min 30 KN f) Breaking strength after thermal stability at 45 degree C for 3 hours – Min 30 KN g) Rope net strength – 200 KN/m h) Punching shear strength – Min 80 KN i) Retention in breaking strength of rope after UV Exposure – Min 70 % j) Retention in breaking strength after exposure to saline water cyclic corrosion test for 168h – 90. Notes :(a) Stone boulders / pitching stones for filling gabion boxes shall be measured and paid separately under relevant item. (b) The Contractor is responsible for securing the gabion boxes intact in position considering all adverse conditions due to the action of sea waves. The boxes shall be tied together in such a way that it will not get washed away even in case of high tides. In worst case of any such mishappenings, the lost gabion box shall be replaced by the Contractor at no extra cost to the Governrment. | |||||
| 4.01 | Size - 1.50 x 1.00 x 1.00 m | 304 | Each | - | - |
| 4.02 | Size - 2.00 x 1.00 x 1.00 m | 304 | Each | - | - |
| 4.03 | Size - 3.00 x 1.00 x 1.00 m | 710 | Each | - | - |
| 4.05 | d) The manufacturer shall possess in house design facility and also shall have product supervision capacity.
e) The manufacturer shall possess sufficient & demonstrable in house manufacturing capacity to manufacture and supply flexible rope gabions in the given project completion timelines.
f) Manufacturer shall have flexible rope gabion manufacturing facility in India
g) The manufacturing company of flexible rope gabions shall have experience of minumum 10 years in manufacturing and sales/use of flexible rope gabions satisfactorily. Necessary documentary proof in support of the same shall be produced for product approval by GE. | - | - | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
81513PS.pdf
Additional Documents • 0.19 MB
Drg.pdf
Additional Documents • 0.72 MB
81513GENERALPAGES.pdf
Tender Documents • 0.55 MB
BOQ_893311.xls
BOQ • 0.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .