| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.6 LAccepted-Finance | L1 | Accepted-Finance QUALIFIED | |
| 2 | L2₹2.7 L+₹10,411.50 (3.95%)Accepted-Finance | L2 | Accepted-Finance QUALIFIED | |
| 3 | L3₹3.1 L+₹43,269 (16.4%)Accepted-Finance | L3 | Accepted-Finance QUALIFIED |
Tender Value
₹2.6 L
EMD Value
₹3,000
Closing Date
16 Aug 2023, 11:00 amClosed
EDC 2 BULANDSHAHR
EDC 2 BULANDSHAHR
CONSTRUCTION OF 11 KV LINE IN FULL DEPOSIT UNDER EDD-IV SYANA.
2023_PVVNL_825511_1
29/EDC-II/BSR/2023-24
Open Tender
Electrical Works
Lump-sum
30 days
BULANDSHAHR
CONSTRUCTION OF 11 KV LINE IN FULL DEPOSIT UNDER EDD-IV SYANA.
2 documents required · 2 mandatory
₹1,180
SE EDC 2 BULANDSAHHR
₹3,000
17 Aug 2023
31 Jul 2023
16 Aug 2023
31 Jul 2023
16 Aug 2023
31 Jul 2023
Amount
Carriage of fallowings from ESC BSR to pit site on kachcha pakkaa road including loading and unloading chagres at both ends, required ccompletion of work, distance about to 0 to 70 Km. approx.
Cartage of material from ESC PVVNL to J.E store to work site including loading unloading at both ends Distt.
PCC Pole. 8.5 Mtr. Long
Carriage of line accessories, ACSR Weasal Conductor, D/P accessories as X-arm M.S. channel, Angle, Earthing rod, 11 KV Disc insulator with fitting 11 KV pin insulator with pin etc for construction of single suport and D/P. & 11 KV Metering Panel. 11 KV XLPE cable., CT/PT Unit, Static TVM Meter, Cable Jointing Kit, Dropper, Top Channel Etc.
11 KV VCB for O/G CTR 200/100/5 A
Erection & fabrication of following supports including fitting of all required accessories of H.T/L.T line as per RESPO schedule. All type of M.S. Clamps Nuts, Bolts, stone pad etc. Required for the above work shall be provided by the contractor at his own cost.
Single support on PCC pole 8.5 Mtr. Long.
D/P on PCC pole 8.5 Mtr. Long.
Grouting concreting & Plinthing of Pcc Pole 8.5 Mtr Long as per RESPO norms.
Fixing erection & grouting of Stay set complete with binding & Nozzling of Stay wire.
Earthing of supports with the help of Earthing rod & GI wire/Earth wire.
Fixing of Cable Joining kit of size 3x50/70/120 sq mm Cable Indoor/Outdoor 11KV.
Laying stringing & sagging of WEASEL/Rabbit conductor in 3 phase
Laying stringing & sagging of 11 KV XLPE Cable 3x70 sq mm
Mounting of CT/PT on the D/P.
Installation of 11 KV VCB for O/G 200/100/5 A
Fixing & grouting of 11 KV Metering Panel complete.
Making of Cable Trunch with Sand & Bricks as per RESPO Drawing
Earthing of VCB O/G CTR 200/100/5A (water level)
Shifting of 11 KV Pilfer proof Metering Cubicle, existing to proposed location
Providing and fixing of the following material by the material as per RESPO Drawing.
Cross Arms holding Clamp
F-Clamp
Stay Insulator
Stay Clamp
Earthing Clamp
D/P Clamp with Nut & bolt
Nut & Bolt with Washers all sizes.
Stone Pad
Danger Board with Clamp
All work will be done as per UPPCL/RESPO Rules.
C B S ENTERPRISES
Vivek Electricals
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .