Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹21.1 LAccepted-AOC | ₹21.1 L | L-1 | Accepted-AOC L-1 Elangovan
Lowest Rate |
| 2 | L2₹21.5 LRejected-AOC | ₹21.5 L | L2 | Rejected-AOC L-2 Dhandayuthabani
Highest Rate |
| Sl No | Description | Qty | Unit | Dhandayuthabani L2 | elangovan L1 |
|---|---|---|---|---|---|
| 1.00Arcot Block | |||||
| 2.00Renewal of the Road of Punnapadi Road of Km 0/0 - 2/175 (R-45) VPR in Arcot Block,Ranipet District | |||||
| 3.00 | Clearing the scrub jungles including cutting the scrubs and removing away from site etc complete | 642.6 | /sqm | 7 ₹4,498.20 | 5 ₹3,213 |
| 4.00 | Earthwork excavation in all classes of soils and subsoils including shoring and strutting with initial lead and lift etc complte, as per MOST specification asper SS20 A. | 214.2 | /Cum | 150 ₹32,130 | 50 ₹10,710 |
| 5.00Applying Tack coat over WMM surface using 3.00 kgs of bitumen emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of bitumen emulsion including conveyance of bitumen emulsion to actual workspot handling charges including labour charges for brushing , cleaning and preparing the surface for laying the required quantity of bitumen emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges as per Clause 502 of MORTH Rev-5. | |||||
| 6.00 | KM 0/0 - 2/175 | 2,343.75 | /sqm | 20.21 ₹47,367.19 | 17.2 ₹40,312.50 |
| 7.00Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonne per hour using crushed aggregates of specified grading,premixed with bituminous binder @4.0 to 4.5 percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment,rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT & H speciications clause 507 complete in all respects | |||||
| 8.00 | KM 0/0 - 2/175 | 117.19 | /Cum | 8,983.42 ₹10.5 L | 8,983.42 ₹10.5 L |
| 9.00BITUMINOUS CONCRETE 25/30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 | |||||
| 10.00 | KM 0/0 - 2/175 | 58.59 | /Cum | 11,524.16 ₹6.8 L | 11,524.16 ₹6.8 L |
Tender Value
₹21.4 L
EMD Value
₹22,800
Closing Date
12 Feb 2026, 3:00 pmClosed
Arcot BDO Office
Arcot BDO Office
Village Panchayat and Panchayat Union Road Maintenance works of Renewal of the Road of Punnapadi Road of Km 0/0 - 2/175 (R-45) VPR in Arcot Panchayat Union of Ranipet District for the Year 2025 -26
2026_RDTN_652000_1
A3/4030/2025
Open Tender
Civil Works
90 days
Arcot BDO Office
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹22,800
16 Mar 2026
6 Feb 2026
12 Feb 2026
6 Feb 2026
12 Feb 2026
6 Feb 2026
Arcot Block
Renewal of the Road of Punnapadi Road of Km 0/0 - 2/175 (R-45) VPR in Arcot Block,Ranipet District
Clearing the scrub jungles including cutting the scrubs and removing away from site etc complete
Earthwork excavation in all classes of soils and subsoils including shoring and strutting with initial lead and lift etc complte, as per MOST specification asper SS20 A.
Applying Tack coat over WMM surface using 3.00 kgs of bitumen emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of bitumen emulsion including conveyance of bitumen emulsion to actual workspot handling charges including labour charges for brushing , cleaning and preparing the surface for laying the required quantity of bitumen emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges as per Clause 502 of MORTH Rev-5.
Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonne per hour using crushed aggregates of specified grading,premixed with bituminous binder @4.0 to 4.5 percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment,rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT & H speciications clause 507 complete in all respects
BITUMINOUS CONCRETE 25/30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Provision for 60 cm equilateral Triangle
Provision for Hectometer Stone
GST Amount for providing service to Government contract works for the above construction works. { GST amount is the Total GST amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.20 MB
TB.pdf
Tender Documents • 1.86 MB
BOQ_781816.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid