| 1 | L1₹3.4 LAccepted-AOC 112 49 NEW BONBEHARI COLONY ROAD BONGAON NORTH 24 PARGANAS | BONGAON | NORTH 24 PARGANAS | WEST BENGAL | ₹3.4 L | L1 | Accepted-AOC L1 |
| 2 | L2₹3.5 LRejected-AOC 50 PRINCE ANWAR SHAH ROAD KOLKATA KOLKATA 700033 | KOLKATA | WEST BENGAL | 700033 | ₹3.5 L | L2 | Rejected-AOC L2 |
| 3 | L3₹3.5 LRejected-AOC T G 4 4 TEGHARIA MAIN ROAD KOLKATA 700157 | 24 PARAGANAS NORTH | WEST BENGAL | 700157 | ₹3.5 L | L3 | Rejected-AOC L3 |
Tender Value
₹3.4 L
EMD Value
₹7,000
Closing Date
23 Jan 2026, 12:00 pmClosed
Executive Engineer
28a. k.n.sen.rd. kol-42
INSTALLATION AND IMPROVEMENT OF STREET LIGHTING SYSTEM AT 56 TO 90 DR. G.S. BOSE RD. IN WARD NO-67.
2026_KMC_989391_1
KMC/LTG/B-7/APAS/67/25-26/448
Open Tender
ELECTRICAL WORKS M/R
15 days
kmc ward no-67
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹7,000
2 Jun 2026
15 Jan 2026
23 Jan 2026
15 Jan 2026
23 Jan 2026
15 Jan 2026
Outdoor Lighting Installation, Steel Tubular Pole, M.S. Pipe, G.I. Pipe, Pole CAP etc Supplying of Swaged Steel Tubular pole as per IS 2713, Pt. II, 1980 for following designation and of following dimensions.(Outside dia & thickness are given in Annexture -1)g) 410 SP - 21 ; 8.5 Mtr., 129.00 Kg.
Outdoor Lighting Installation, Steel Tubular Pole, M.S. Pipe, G.I. Pipe, Pole CAP etc Supplying of Swaged Steel Tubular pole as per IS 2713, Pt. II, 1980 for following designation and of following dimensions.(Outside dia & thickness are given in Annexture -1) b) 4 SWG ;5.0 mtrs; 45 Kg
SCHEDULE OF RATES FOR OH LINE INSTALLATION (LT DISTRIBUTION).Erection of Poles.Erection of Single Steel tubular pole of length as given below with/without sole plate & Cap etc. in CC foundation (Proportion and dimension indicated below), having 600x600x150 mm thick CC (4:2:1) base block below sole plate/pole with hard jhama metal including CC (6:3:1) muffing 0.30 mts. dia and 0.30 mts. above ground level including 3 mm thick neat cemented finish and GI earth bolt after making drilled holes etc. on pole & carriage of pole upto 1.6 Km from Store to work(site including filling up the excavated earth pit with shifted soil and ramming properlyUpto 9.0 mtr. Size 0.6x0.6x1.70 mts
SCHEDULE OF RATES FOR EARTHING INSTALLATIONS.Earthing Installation ... with Pipe Electrode.Earthing with 50 mm dia GI pipe 3.64 mm thick x 3.04 Mts. long and 1 x 4 SWG GI (HOT Dip) wire (4 Mts. long), 13 mm dia x 80 mm long GI bolts, double nuts, double washers incl. S & F 15 mm dia GI pipe protection (1 Mts. long) to be filled with bitumen partly under the ground level and partly above ground level driven to an average depth of 3.65 Mts. below the ground level as below:(a)By ISI Medium GI pipe.
S/F arm bracket of 50 mm bore tubular Pipe (M.S.) of 1. 5 m (5') length for fixing on 75/100 mm pole top including S/F 4 mm thick M.S. plate welded with bolts, nuts & clamps, etc. as required with fabrication work
S/F of special head type M S loop box (3 mm thick) with connecting bar and other accessories fixed on the top the pole as required and as per direction of Engineer-In-Charge. For 3 phase connection.
Supplying Al.conductor PVC insulated and sheathed unarmoredcable (1.1KVgrade, Gloster/Havells/Polycab). 10sqmm x 2core
Supply and drawing of 7/14 SWG galvanised stranded wire for drawing unarmored cable (supply of cable is not included in the scope) by catenary system of wiring with 3nos. reel insulator per mtr. and binding with binding wires etc,as reqd. for drawing
Supplying Al.conductor PVC insulated and sheathed unarmoredcable (1.1KVgrade,Gloster/Havells/Polycab). 4sqmm x 2core
Laying through RCC/Hume/GI Pipe.(a)Laying only Cable upto 50 sqmm through existing RCC/Hume/ GI Pipe/open masonary trench FOR single, 2, 3, 3... & 4 core
Erection of Galv. (HOT Dip) Cross arms/ `D... Iron Clamp7).Supplying & Erection of Galv. `D... iron complete with suitable pole clamp 75mmx88mm porcelain shackle insulator & 15 mm dia Galv. bolts & nuts. incl. painting
A N N E X U R E - I Basic Rate of Materials: (All Rates of materials from K-1 to K-14 are excluding VAT) 145. Galv. Straining screw 12"x5/8" dia
Painting of Steel Tubular Pole of lengths and no. of coats of paint, as given below with ready mixed paint/primer of(approved make, and brand incl. preparation of surface by sand paper/emery paper, cleaning etc. FOR receiving fresh coat of paint.Upto 9.0 mtr. long pole.(i)1st coat of aluminium paint over 1 coat of RO priming
Painting of Steel Tubular Pole of lengths and no. of coats of paint, as given below with ready mixed paint/primer of(approved make, and brand incl. preparation of surface by sand paper/emery paper, cleaning etc. FOR receiving fresh coat of paint.Upto 9.0 mtr. long pole.ii2nd coat of aluminium paint over 1st coat
Hoisting fixing and commissioning of luminaries including making necessary connection and earthing attachment: HPMV/HPSV luminaries/LED fittings of any wattage.
SUPPLY AND DELIVERY 200 W LED STREET LIGHT FITTINGS
SUPPLY AND DELIVERY 40 W LED STREET LIGHT FITTINGS
SCHEDULE OF RATES FOR OVERHEAD LINE INSTALLATION - REPAIR 14. Dismantling steel tubular/Rail/Strut embedded in CC foundation incl. excavation, filling of holes, restoring surface,loading at site and delivering, unloading, sorting, stacking properly at any place as per direction upto a lead of 1.6 km
(H) Street lights :2. Distribution wiring FOR steel light on pole FOR outdoor fluorescent/SV/MV light fitting with 2x1/1.40 PVC insulated and sheathed wire (single core) in 15 mm dia GI Pipe (ISI Medium), without control switch, incl. fitting and fixing the light fitting by providing 32 mm dia GI Pipe bracket of lengh 1.05 mts, on pole incl. S&F sutable MS flat clamps with bolts, nuts etc. as required and painting
(H) Street lights : 5. Supplying & Fixing GI waterproof type looping cable box size 200x150x100 mm deep having 4 mm thick comprising of one 250 V 15 A kit-kat fuse unit, one NL on porcelain insulator, one compression type brass cable gland FOR upto 2- core 16 sqmm PVC/A cable and having lined with rubber gasketted GI top cover with brass machine screws etc., earthing terminal with lug, on steel tubular pole near base, including S&F 40x6 mm thick, MS clamps with bolts, nuts etc. including painting with anticorrosive paint
Laying on Wall / surface with Saddles / clamps.(a)Laying of cable upto 2 core 25 sqmm on wall/surface incl. S & F MS saddles with earthing attachment in 10 SWG GI (HOT Dip) Wire, making holes etc. as necy. mending good damages and painting
SUPPLY AND DELIVERY OF 200 W LED FLOOD LIGHT FITTINGS
Fixing only Floodlight fittings on top of masonary structure by 3 Nos. 10 mm dia x 87 mm long rag bolts, nuts & double washers complete either 37 mm x 10 mm MS flat support/or by other means as required
ESTIMATED AMOUNT
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.36 MB
FORM448.pdf
Tender Documents • 0.64 MB
BOQ_2417329.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid