| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-AOC 201 205 SAI SAMARTH COMPLEX MANEJA MAKARPURA MANEJA VADODARA GUJARAT 390013 UDYAM GJ 24 0031890 | VADODARA | GUJARAT | 390013 | ₹1.2 Cr | L1 | Accepted-AOC Awarded as L1 Bidder |
| 2 | Rejected-Technical 36 SHESHACHAL AJANTA NAGAR BHARUCH GUJARAT 392001 | BHARUCH | GUJARAT | 392001 | - | - | Rejected-Technical Not Qualified |
| 3 | Rejected-Technical 96 BARTHAKUR MILL ROAD ULUBARI KAMRUP ASSAM 781007 | KAMRUP METRO | ASSAM | 781007 | - | - | Rejected-Technical Not Qualified |
| 4 | Rejected-Technical | - | - | Rejected-Technical Not Qualified |
| 5 | Rejected-Technical | - | - | Rejected-Technical Not Qualified |
Tender Value
Refer Docs
EMD Value
₹2.2 L
Closing Date
10 May 2021, 2:30 pmClosed
DGM GMB
Assam Gas Company Limited P.O. Duliajan, Dist. Dibrugarh Assam - 786602 Mob 9435038804
SURVEY OF PIPELINE ROUTE AND STATIONS FOR GOLAGHAT TO BCPL LAKWA GAS PIPELINE PROJECT
2021_ICD_21594_1
AGCL/GMB/BCPL/SURVEY/2021/35
Open Tender
Survey
Works
210 days
Golaghat, Assam
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
Yes
₹2.2 L
Yes
AGCL Guwahati Office
6 Nov 2021
7 Apr 2021
10 May 2021
7 Apr 2021
10 May 2021
20 Apr 2021
8 Apr 2021 - 24 Apr 2021
19 Apr 2021
Amount
PART -A PIPELINE SURVEY RECONNAISSANCE SURVEY FOR PIPELINE (GOLAGHAT TO BCPL TO LAKWA PLANT PIPELINE ROUTE)
Carryout reconnaissance survey as per Specification/ Scope of work in the tender and instructions of Engineer-in-Charge and submission of four coloured drawings and report. The reconnaissance survey shall be carried out proposing minimum three or more feasible alternative routes and giving details of likely crossings and other constraints that is likely to be encountered during pipeline construction on each route, future development plans of land owning authorities like Municipal corporation, Gram Panchayat, PWD, NHAI , etc., availability of land including ownership details and recommending the best feasible route
DETAILED SURVEY FOR MAINLINE (GOLAGHAT TO BCPL TO LAKWA PLANT PIPELINE ROUTE)
Carrying out detailed pipeline route survey and all associated works along the pipeline route including Centerline Survey, Detailed Route Survey, Crossing survey (minor) , Collection of population density data, permanent monuments along the pipeline route, collection of all data, submission of Alignment sheet, providing all manpower, tools, tackles, materials, equipments and other support, facilities (including mobilization and demobilization as required) necessary for the work, in accordance with requirement of Scope of Work document no. (C211031-00-PP-SOW-2001) and in compliance Specification for Topographic Survey (Annexure) enclosed with the tender document and as per instructions of the COMPANY ’s Representative including meeting all responsibilities and furnishing all documents for survey.
SOIL STRATIFICATION & CLASSIFICATION SURVEY Carrying out Soil Stratification work along the pipeline route as per specification including and providing all men, tools, tackles, materials, testing equipment and other equipment other support facilities including mobilization and demobilization as required etc. as per tender document, The boring minimum 150 dia bore hole shall be either terminated at a depth of 3 M below NGL or on top of bed rock if rock is encountered at a depth of less than 3 M. and Boreholes shall be made at intervals of 250 M along the pipeline route, at all intermediate points where there is apparently a change in the type of soil and at any other place as directed by direction of Engineer-in-Charge. Note: Interval can be increased to 500 M then to 1 km in case soil strata is found to be same.This will required Approval of Company`s Representative / PMC. Atleast 2 borehole shall be carriedout on the two side of each NH & SH crossing.
CORROSION SURVEY Carrying out corrosion survey including measurement of soil resistivity at a depth of 1.0, 1.5 & 2.0 m interval at every 500 m, chemical analysis of soil/water, collection of additional data related to cathodic protection as per specification including providing man power, tools, tackles, materials, soil resistivity testing equipment, pipe/cable locator & other supporting facilities etc. including mobilization & demobilization necessary for survey and associated works, including compilation and presentation of data in four sets of Corrosion Survey Report as per technical specification, drawings, implementation schedule and other provisions of the tender document and instructions of Engineer-in-charge
MAJOR CROSSING SURVEY Crossing Survey (To carry out a detailed survey covering a proposed crossing for Gas Pipeline using survey instruments and Providing Planimetry and ground profile (Section) details and levels at 5m interval as per technical specification, tender document and direction of EIC ) Survey shall be covering at least width of 20 m (SH/NH) on either side of proposed crossing, including making of Crossing drawings required for laying of pipeline, all complete as per specifications and the direction on Engineer-in-charge. Note : All other crossing shall be inculded in SOR item number PI002.00.01.
Through a road (NH/SH), covering at least width of 20 m (Beyond NH/SH RoU) on either side of proposed crossing all complete as per specifications and the direction on Engineer-in-charge
Railway crossing covering at least a width of 60 m (Beyond Railway RoU) on either side of proposed crossing all complete as per specifications and the direction of Engineer-in-charge
Major water crossings (Rivers) / Major Canal Crossing (Contionous Water flow canal ) (For depth beyond 4 m ) - covering at least a width of 50m (From bank of River/Canal or upto Highest Flood level whichever is more) on either side of proposed crossing all complete as per specifications and the direction of Engineer-incharge.
CADASTRAL SURVEY
Carrying out Cadastral survey for RoU acquisition involving Collection of (a) Village Maps(Revenue Map), digitization of Village Map and transfer of alignment and RoU under acquisition in the maps. (b) Ownership details. (c) Field Measurement Book (FMB) etc. and submission to AGCL as specified in Scope of work/Technical Specifications by providing all man power, tools, tackles, materials, equipment and other support, facilities (including mobilization and demobilization as required) necessary for the work, and as per instructions of AGCL Submission of drawing/Documents in hard as well as soft copies for each pipeline as per requirement of tender documents and instruction of AGCL.
GIS/ LIS WORK (GOLAGHAT TO BCPL TO LAKWA PLANT PIPELINE ROUTE)
Digitization and Development of GIS/LIS of detailed route survey pipeline data and uploading of same data in Client GIS Platform and submission of drawing /documents in hard as well as soft copies for each pipeline as per requirement of tender documents and instruction of the engineer-in-charge.
PART B- PERMISSIONS Preparing the map for applying and Obtaining of permission from Municpal corporation, Gram Panchayat or various land owning authorities using Google map or secondary maps or survey maps or crossing maps as applicable ( With authorisation from concerned agency) and submission to concerned land owning agencies in the required format and /or uploading in the website as required for applying of permission and submitting 4 copies of the applied permission drawings along with soft editable copies and CAD output on CD to COMPANY/PMC. All liasioning works for applying and obtaining secondary maps is included in this item. Note: 1. Payment will be made for the final approved route for which application has been made to the land agencies. 2. Item covers all works towards successful receipt of Permision for Laying Pipeline & OFC and stations from Concerned authorities & Land owners.
National Highway / Expressway Crossing
Along the National Highway (in ROU of Highway)
Railway Crossing
Along the Railways (in ROU of Railway)
State Highway
River Crossings
Other Pipeline and Utilities
Forest Crossing permission Social Forest (Per Division)
Forest Crossing permission Protected and Reserved Forest (Per Division)
Gazette 6(1) Notification from Ministry
PART-C(CIVIL)GEOTECHNICAL INVESTIGATION FOR STATIONS
Mobilization of plant and personnel at site including shifting of plant and personnel from one site to another and demobilization, complete for investigation work as described in scope of work ,Specifications, and as per instruction of Engineer –in –charge
Boring of minimum 150 mm dia boreholes as specified through all kinds of soil A. In pipeline stations, (for maximum 10m depth of borehole from Existing Ground/ Bed Level as per instruction of Engineer-in-charge ).
Boring of minimum 150 mm dia boreholes as specified through all kinds of soil A. In pipeline stations, (for maximum 15m depth of borehole from Existing Ground/ Bed Level as per instruction of Engineer-in-charge ).
Drilling through rock with minimum Nx size bit up to a maximum depth of 15m from existing Ground as per instruction of Engineer –in –charge at Pipeline stations
Using Tungsten Bit
Using Diamond Bit
Conducting Standard Penetration tests in boreholes as specified.
Collecting 100 mm dia undisturbed samples from boreholes as specified .
Conducting Electrical Resistivity Tests (ERT) as specified
Conducting the following laboratory tests as specified
Atterberg’s Limit (LL & PL)
Natural water content
Bulk and Dry density, optimum moisture content dry density relationship
Specific Gravity and Void ratio
Grain Size Analysis
Sieve analysis
Hydrometer Analysis
Tri axial tests:
Unconsolidated un drained
Consolidated undrained
Unconfined compression test on UDS
Consolidation test as specified
Test on rock samples as per relevant IS code
Uniaxial compression test
Point load test
Chemical test as specified
On soil samples
On ground water samples
Shrinkage Limit test as per relevant IS code**
Swelling potential test as per relevant IS code**
Swelling pressure test as per relevant IS code**
GEOTECHNICAL INVESTIGATION FOR RIVER/CROSSINGS
Carrying out geotech investigation of rivers as defined in Scope of Work & specific requirements for geotech investigations (clause no. 2 c) (Document no. - C211031-00-CS-SOW-6001) including hydrological data collection from statuory authorities. The job includes scour depth calculation for each river and submit for EIC/PMC for review
Boring of minimum 150 mm dia boreholes as specified through all kinds of soil A. In pipeline rover/crossings, (for maximum 15m depth of borehole from Existing Ground/ Bed Level as per instruction of Engineer-in-charge ).
Boring of minimum 150 mm dia boreholes as specified through all kinds of soil A. In pipeline river/crossings, (for maximum 20m depth of borehole from Existing Ground/ Bed Level as per instruction of Engineer-in-charge ).
Drilling through rock with minimum Nx size bit up to a maximum depth of 20m from existing Ground as per instruction of Engineer –in –charge at Pipeline stations
Using Tungsten Bit
Using Diamond Bit
Conducting the following laboratory tests as specified
Atterberg’s Limit (LL & PL)
Natural water content
Bulk and Dry density, optimum moisture content dry density relationship
Specific Gravity and Void ratio
Grain Size Analysis
Sieve analysis
Hydrometer Analysis
Chemical test as specified
Shrinkage Limit test as per relevant IS code**
Swelling potential test as per relevant IS code**
Swelling pressure test as per relevant IS code**
** These tests shall be conducted if soil appears to be expansive in nature
Topo Graphical Survey Works
Conducting topographical ground/land survey in the specified area as shown in the tender drawings by conventional/GPS or any other standard method, covering details of physical features like Rivers, Nallahs, Lakes, Ponds, wells, pits, Forest, Trees, Roads, culverts, transmission lines, telegraph/ telephone and electric poles, underground or any other services, cross drainage works including cross sectional details of nallah etc. including establishing high flood level with source of information, identification of any monument, historical structure, wild life sanctuary in the vicinity, storm water disposal point with levels, cross-section details of nallah, recording spot levels, including providing in tabulation girth wise no. of trees etc as specified, plotting and developing topographical contour maps, showing true north including establishing survey reference stations, key plan etc. including all equipment's, instruments, personnel's, clearing of bushes as per requirement for intervisibility to carry out survey work etc. , complete work in all respects as per drawings, specifications and directions of Engineer-in-Charge including submitting hard copies of drawings/map and supply of electronic files. Note: Survey work shall be carried out by survey agency approved by Contractor and shall be submitted to PMC/EPC for review. Note: (1) Surveyors having adequate practical knowledge and experienced in survey works with advanced equipment is essential. Man and equipment required are to be arranged by the contractor at his own cost. (2) The contractors shall include the cost towards mobilisation/de-mobilisation of equipment and men. (3) The contractor shall include the cost towards clearing of bushes/vegetation/cutting and removing tree branches (if required), in his quoted rates. (4) This work shall be carried at different places. (5) Contractor shall include the cost of Grid Pillar,Boundary Pillar & Permanent Pillar etc. in the quoted rates
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .