| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹18.0 LAccepted-AOC VILLAGE LOHANA DIST REWARI 2025R20245 | LOHANA | REWARI | HARYANA | 1 | Accepted-AOC Successful | |
| 2 | 2₹20.2 L+₹2.1 L (11.9%)Rejected-Finance JOGINDER NAGAR RAJA GARDEN COLONY HIRA NAGAR NEAR PIR BABA MOSQUE YAMUNA NAGAR | YAMUNA NAGAR | YAMUNANAGAR | HARYANA | 2 | Rejected-Finance ok |
Tender Value
₹18.1 L
EMD Value
₹16,100
Closing Date
23 Jan 2026, 9:00 amClosed
Davender Singh
Horticulture Gurugram
Development of Parks with Construction of toe wall Barbed Wire Fencing and Footpath in Parks under MMAY in Sector-18 Rewari
2026_HBC_497544_1
2026D0500EDA DE73 4C92 82C2 5EA3E65D446A261HSV
Open Tender
Civil Works
Works
365 days
Gurugram
2 documents required · 2 mandatory
₹1,000
Yes
₹16,100
Yes
17 Mar 2026
17 Jan 2026
23 Jan 2026
17 Jan 2026
23 Jan 2026
17 Jan 2026
17 Jan 2026 - 19 Jan 2026
[10.100.2]Cement Concrete 1:8:16 Flooring 2. Cement Concrete 1:8:16 with stone aggregate 40 mm size in foundation and plinth. [Through Rate]
[10.29.2]Providing and laying of chequered terrazzo tiles 20 to 22 mm thick with graded marble chips of size up to 6 mm in floors, jointed with neat cement slurry mixed with pigment to match the shade of the tiles, including rubbing and polishing complete, on 20 mm thick bed of cement mortar 1:4 (1 cement :4 coarse sand) : 2. Medium shade pigment using 50% white cement, 50% ordinary cement [Through Rate]
[11.6.1]15 mm cement plaster on the rough side of single or half brick wall of mix : 1. 1:4 (1 cement: 4 fine sand) [Through Rate]
[11.62.2]Colour washing such as green, blue or buff to give an even shade : 2. New work (two or more coats) with a base coat of whiting [Through Rate]
[11.68.3]Applying priming coat: 3. With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/ steel works [Through Rate]
[13.29.2]Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 2. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works [Through Rate]
[B0749] B0749. Galvanised wire mesh of average width of aperture 1.4 mm and nominal dia of wire 0.63 mm [Rate]
[26.2]Supplying and stacking of good quality top layer garden earth free from debris and weeds, at site including royalty and carriage/lead 5 km (good earth measured in stacks will be reduced by 20 % for payment) only for filling of pots and flower beds [Through Rate]
[4.12.1]Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soil [Through Rate]
[6.1.2]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 2. 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) [Through Rate]
[6.29.1]Centering and shuttering including strutting, propping etc. and removal of form work for : 1. Foundations, footings, bases for columns [Through Rate]
[6.3.1]Providing and laying cement concrete in kerbs, steps and the like at or near ground level excluding the cost of centering, shuttering and finishing. 1. 1:1½:3 (1 Cement: 1½ coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size) [Through Rate]
[6.8.3]Providing and laying damp-proof course with cement concrete 1:2:4 (1 cement : 2 coarse sand (zone-III): 4 graded stone aggregate 12.5mm nominal size) 3. 25 mm thick [Through Rate]
[7.20.2]Brick work with common burnt clay modular bricks of class designation 10.5 in foundation and plinth in: 2. Cement Mortar 1:6 (1 cement : 6 coarse sand) [Through Rate]
[7.89.2]Coursed rubble masonry with hard stone (first or second sort) in superstructure above plinth level and up to floor four level. 2. Masonry work (second sort), in cement mortar 1:6 (1 cement: 6 coarse sand) [Through Rate]
Analysis of rates for Providing and Fixing of 7`-0` High RCC Pillar Fencing with G.I. barbed wire fencing with 5 Horizontal and 2 Cross wires
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.94 MB
BOQ_576103.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .