Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.9 LAdmitted-Finance 1 225 5 6 SADAR BAZAR DELHI CANTT 110010 | NEW DELHI | DELHI | 110010 | ₹21.9 L | L1 | Admitted-Finance |
| 2 | L2₹24.0 L+₹2.1 L (9.56%)Admitted-Finance | ₹24.0 L+₹2.1 L (9.56%) | L2 | Admitted-Finance |
| 3 | L3₹25.5 L+₹3.6 L (16.5%)Admitted-Finance 205 PARSHAV VIHAR PLOT NO 50 1 P EXTN PATPARGANJ DELHI 110092 | DELHI | EAST DELHI | DELHI | 110092 | ₹25.5 L+₹3.6 L (16.5%) | L3 | Admitted-Finance |
| 4 | L4₹26.6 L+₹4.7 L (21.2%)Admitted-Finance | ₹26.6 L+₹4.7 L (21.2%) | L4 | Admitted-Finance |
| 5 | L5₹28.2 L+₹6.3 L (29.0%)Admitted-Finance 19 62 1ST FLOOR WEST MOTI BAGH SARAI ROHILLA NEW DELHI 110035 | NEW DELHI | NEW DELHI | DELHI | 110035 | ₹28.2 L+₹6.3 L (29.0%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SANJEEV ENTERPRISES L3 | RUCHIKA ENGG.WORKS L6 | sheetal engineering L4 | Swastik Real Estate L2 | SNOWY ENGINEERING INC L5 | M P TYAGI ENGINEERS AND CONTRACTORS L1 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Taking down for servicing of split type AC 1.5/2 TR Capacity including cleaning of cooling coil, air filters/plasma filters etc, (Indoor unit), condenser, compressors, fan motor etc,(Out door unit) with vacuum cleaner or cleaning solution including checking the serviceability of electrical/electronic circuits relays, wiring kit, thermostat switches knobs, Remote control unit including PCB, fan, blower, etc., keeping the AC unit in satisfactory working condition after necessary servicing as required and refixing the same in existing position complete all as specified and as directed . | 210 | Each Job | 350 ₹73,500 | 200 ₹42,000 | 300 ₹63,000 | 250 ₹52,500 | 150 ₹31,500 Lowest | 349 ₹73,290 |
| 2.00 | All as per srl item No 1.00 here-in-before but window type AC of capacity 1.5/ 2 TR complete all as specified and as directed. | 50 | Each Job | 350 ₹17,500 | 200 ₹10,000 Lowest | 300 ₹15,000 | 250 ₹12,500 | 250 ₹12,500 | 299 ₹14,950 |
| 3.00 | All as per srl item No 1.00 here-in-before but Tower type AC of any capacity complete all as specified and as directed. | 2 | Each Job | 400 ₹800 | 400 ₹800 | 999 ₹1,998 | 300 ₹600 | 800 ₹1,600 | 299 ₹598 Lowest |
| 4.00 | Material & Labour for changing mode of any type of AC from heating mode to cooling mode or vice-versa complete all as specified and as directed. | 55 | Each Job | 100 ₹5,500 | 50 ₹2,750 | 99 ₹5,445 | 100 ₹5,500 | 50 ₹2,750 | 49 ₹2,695 Lowest |
| 5.00 | Material & Labour for rectifying electrical wiring fault of any capacity type AC and make them functional and also carry out the required repair complete all as specified and as directed. | 135 | Each Job | 100 ₹13,500 | 100 ₹13,500 | 99 ₹13,365 | 100 ₹13,500 | 50 ₹6,750 | 49 ₹6,615 Lowest |
| 5.10Notes for item No. 1.00 to 5.00 (i) Adequate resources and manpower shall be deployed by the contractor for attending day to day defect being an essential installation. (ii) Contractor shall maintain register of servicing as per format given by Engr-in-Charge duly signed by User, where the servicing of equipment carry out and produce as and when asked complete all as specified and as directed. (iii) All complaint/repairs shall be attended/completed within 06 Hour failing which a recovery of Rs 500/- per day per complaint shall be made from contractor dues. | |||||||||
| 6.00 | Supply and fixing in replacement Running capacitor 36+6 MFD complete all as specified and as directed . | 35 | Each | 50 ₹1,750 | 80 ₹2,800 | 99 ₹3,465 | 50 ₹1,750 | 95 ₹3,325 | 49 ₹1,715 Lowest |
| 7.00 | Supply and fixing in replacement Running capacitor 45+5 MFD complete all as specified and as directed . | 25 | Each | 50 ₹1,250 | 80 ₹2,000 | 199 ₹4,975 | 50 ₹1,250 | 110 ₹2,750 | 49 ₹1,225 Lowest |
| 8.00 | Supply and fixing in replacement Running capacitor 50+6 MFD complete all as specified and as directed | 25 | Each | 150 ₹3,750 | 275 ₹6,875 | 300 ₹7,500 | 100 ₹2,500 | 250 ₹6,250 | 49 ₹1,225 Lowest |
| 9.00 | Supply and fixing in replacement Starting capacitor 80-100 MFD complete all as specified and as directed . | 5 | Each | 50 ₹250 | 50 ₹250 | 99 ₹495 | 50 ₹250 | 90 ₹450 | 49 ₹245 Lowest |
Tender Value
₹40 L
EMD Value
₹80,000
Closing Date
24 Aug 2026, 6:00 pmClosed
GE UTILITY PLANT AND MACHINERY DELHI CANTT-10
GE UTILITY PLANT AND MACHINERY KIRBY PLACE DELHI CANTT-10
REPAIR AND MAINTENANCE OF COOLING APPLIANCES AND CONNECTED ITEMS OF VARIOUS UNITS NEAR MALL ROAD UNDER GE (U) PM DELHI CANTT-10
2026_MES_780456_1
GE(U)/PM/D-38/2026-27
Open Tender
Miscellaneous Works
Item Rate
240 days
Delhi Cantt
Please refer tender documents
6 documents required · 6 mandatory
₹500
GE UTILITY PLANT AND MACHINERY DELHI CANTT-10
₹80,000
Yes
7 Sept 2026
23 Jul 2026
28 Aug 2026
23 Jul 2026
24 Aug 2026
10 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Taking down for servicing of split type AC 1.5/2 TR Capacity including cleaning of cooling coil, air filters/plasma filters etc, (Indoor unit), condenser, compressors, fan motor etc,(Out door unit) with vacuum cleaner or cleaning solution including checking the serviceability of electrical/electronic circuits relays, wiring kit, thermostat switches knobs, Remote control unit including PCB, fan, blower, etc., keeping the AC unit in satisfactory working condition after necessary servicing as required and refixing the same in existing position complete all as specified and as directed . | 210 | Each Job | - | - |
| 2 | All as per srl item No 1.00 here-in-before but window type AC of capacity 1.5/ 2 TR complete all as specified and as directed. | 50 | Each Job | - | - |
| 3 | All as per srl item No 1.00 here-in-before but Tower type AC of any capacity complete all as specified and as directed. | 2 | Each Job | - | - |
| 4 | Material & Labour for changing mode of any type of AC from heating mode to cooling mode or vice-versa complete all as specified and as directed. | 55 | Each Job | - | - |
| 5 | Material & Labour for rectifying electrical wiring fault of any capacity type AC and make them functional and also carry out the required repair complete all as specified and as directed. | 135 | Each Job | - | - |
| 6 | Supply and fixing in replacement Running capacitor 36+6 MFD complete all as specified and as directed . | 35 | Each | - | - |
| 7 | Supply and fixing in replacement Running capacitor 45+5 MFD complete all as specified and as directed . | 25 | Each | - | - |
| 8 | Supply and fixing in replacement Running capacitor 50+6 MFD complete all as specified and as directed | 25 | Each | - | - |
| 9 | Supply and fixing in replacement Starting capacitor 80-100 MFD complete all as specified and as directed . | 5 | Each | - | - |
| 10 | Supply and fixing in replacement Starting capacitor 100-120 MFD complete all as specified and as directed . | 5 | Each | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.42 MB
BOQ_874227.xls
BOQ • 0.32 MB
Tender38.pdf
Tender Documents • 1.20 MB
sch38.pdf
Additional Documents • 0.76 MB
D38pdf.pdf
PDF • 0.22 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .