Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹159.9 CrAdmitted-Finance J HOUSE B 103 SOUTH CITY 1 SECT 30 NEAR SIGNATURE TOWN GURUGRAM 122001 | GURUGRAM | GURUGRAM | HARYANA | 122001 | ₹159.9 Cr | L1 | Admitted-Finance |
| 2 | L2₹173.2 CrAdmitted-Finance 201 ROYAL ARCADE DR B BARUAH ROAD ULUBARI GUWAHATI 781007 | GUWAHATI | KAMRUP METRO | ASSAM | 781007 | ₹173.2 Cr | L2 | Admitted-Finance |
| 3 | L3₹188.6 CrAdmitted-Finance BADRI RAI COMPANY ARUN KUMAR RAI DULIAJAN STATION ROAD P O DULIAJAN P S DULIAJAN DIBRUGARH PIN 786602 | DULIAJAN | DIBRUGARH | ASSAM | 786602 | ₹188.6 Cr | L3 | Admitted-Finance |
| 4 | L4₹194.5 CrAdmitted-Finance | ₹194.5 Cr | L4 | Admitted-Finance |
| 5 | L5₹198.8 CrAdmitted-Finance | ₹198.8 Cr | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | UCN CONSTRUCTION COMPANY PRIVATE LIMITED L8 | M/s.Badri Rai and Co. L3 | JAINCO ENTERPRISES PVT. LTD. L7 | M/S NITHINSAI CONSTRUCTIONS L4 | Ganpati Bharat Private Limited L5 | J INFRATECH LIMITED L1 | Bhartia Infra Projects Ltd L2 | BCC Buildtech Limited L9 | Dhariwal Buildtech Limited L6 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Improvement and Widening to two lane with Paved Shoulder of NH-13 & 15 (Old NH-52) from Existing Km 745.60 (Design Km 0.000) to Existing km 770.600 (Design Km 24.819) (Brahmakund T-junction to Kamlang T-Junction, Existing Length: 25.00 Km, Design Length: 24.819 Km, Pkg-01) in the state of Arunachal Pradesh on EPC mode. | 1 | Lump sum | 2,16,96,54,750 ₹217.0 Cr | 1,88,64,00,000 ₹188.6 Cr | 2,00,01,11,000 ₹200.0 Cr | 1,94,53,50,999 ₹194.5 Cr | 1,98,82,00,000 ₹198.8 Cr | 1,59,90,00,000 ₹159.9 Cr | 1,73,16,56,250 ₹173.2 Cr | 2,30,34,71,250 ₹230.3 Cr | 1,99,99,00,000 ₹200.0 Cr |
Updated dates
Tender Value
₹294.8 Cr
EMD Value
₹2.9 Cr
Closing Date
27 Jan 2026, 3:00 pmClosed
Surendra Yadav
NHIDCL, HQ New Delhi
Improvement and Widening to two lane with Paved Shoulder of NH 13 15 from Design Km 0.000 to Design Km 24.819 Brahmakund T junction to Kamlang T Junction Design Length 24.819 Km Pkg 01 in the state of Arunachal Pradesh on EPC mode.
2025_NHIDC_888644_1
NHIDCL/Ar.Pr./NH-13 15/B-C (Pkg-I)/Re-Bid/2025
Open Tender
Civil Works - Roads
730 days
Arunachal Pradesh
Please refer Tender Documents
5 documents required · 5 mandatory
₹35,400
MD NHIDCL
₹2.9 Cr
NHIDCL HQ
28 Mar 2026
5 Dec 2025
28 Jan 2026
5 Dec 2025
27 Jan 2026
13 Jan 2026
8 Dec 2025 - 12 Dec 2025
3 Jan 2026
Improvement and Widening to two lane with Paved Shoulder of NH-13 & 15 (Old NH-52) from Existing Km 745.60 (Design Km 0.000) to Existing km 770.600 (Design Km 24.819) (Brahmakund T-junction to Kamlang T-Junction, Existing Length: 25.00 Km, Design Length: 24.819 Km, Pkg-01) in the state of Arunachal Pradesh on EPC mode.
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.52 MB
RFPBK.pdf
Tender Documents • 6.49 MB
DRaftDCA.pdf
Tender Documents • 2.02 MB
PlanProfile.pdf
Tender Documents • 10.66 MB
Drawing.pdf
Tender Documents • 11.61 MB
TCS.pdf
Tender Documents • 2.09 MB
BOQ_934027.xls
BOQ • 0.25 MB
FinalSchedule.pdf
Tender Documents • 6.50 MB
Download all tender documents and submit your bid