Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹12.8 LAdmitted-Finance | L1 | Admitted-Finance |
Tender Value
₹15.4 L
EMD Value
₹1.4 L
Closing Date
3 Jul 2026, 4:00 pmClosed
CHIEF ENGINEER
VARANASI NAGAR NIGAM
WARD NO 85 DHUPCHANDI ANTRGART VIJAYGRAM COLONY PARK KI MARMMAT V RANGAI PUTAI V PATHVE NIRMAN KA KARYA
2026_NNVAR_1145871_33
14_2026-27
Open Tender
Civil Works
Percentage
90 days
NAGAR NIGAM VARANASI
AS PER TENDER DETAILS
3 documents required · 3 mandatory
₹1,538
TENDER COST, Account no- 50100642535388
₹1.4 L
13 Jul 2026
25 Jun 2026
3 Jul 2026
25 Jun 2026
3 Jul 2026
25 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1वार्ड सं० 85 धुपचण्डी अन्तर्गत विजयग्राम कालोनी पार्क की मरम्मत, रंगाई-पुताई व पाथवे निर्माण का कार्य | | |||||
| 1.01 | Dismantling of brick work or stone work in lime or cement mortar.etc all complete(SOR. 2020- 692) | 53.36 | cum | 380 | ₹20,276.8 |
| 1.02 | Excavation in foundation in ordinary soil including lift up to 1.5m and 30m lead etc all complete (SOR.2020.SI. No.252) | 13.86 | cum | 130 | ₹1,801.8 |
| 1.03 | P/L of Cement conc. Work in 1:6:12 cement send and 40 mm brick ballast etc all complete. | 21.22 | cum | 4,060 | ₹86,169.44 |
| 1.04 | Earth work in cutting and cartage up to 8 km. with all complete.(SOR -SI No. CARTAGE 231a +253 E/W) | 31.68 | SQM | 310 | ₹9,820.8 |
| 1.05 | P/L of RCC work in slab of roof work 1:1.5:3 cemen concret for reinforced cement concree. Etc all ( SOR No. 283) | 21.19 | kg | 8,050 | ₹1,70,579.5 |
| 1.06 | Mild steel or iron work of small size such and section. Etc all complete work.(SOR. 502) | 831.78 | cum | 63 | ₹52,402.14 |
| 1.07 | B/W in sub structure for side wall with cement mortar in 1:3 (C : F/sand )etc. all complete. SOR SI No. 307+309 | 96.61 | cum | 5,450 | ₹5,26,524.5 |
| 1.08 | Mild steel or iron work of havey sizec such and section. Etc all complete work.(SOR. PWD) | 2,225 | kg | 70 | ₹1,55,750 |
| 1.09 | 12mm thick plaster work 1:3 cement mortar consisting of 1part cement and 3 part c-sand. Etc all complete. (SOR. 2024-I.no.583) | 522.28 | SQM | 185 | ₹96,621.8 |
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
14TD-3.pdf
Tender Documents • 4.29 MB
BOQ_2181990.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .