| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.0 LAccepted-AOC 0 MUNSHIPURA MUNSHIPURA MAU MAU UTTAR PRADESH 275101 | MAU | UTTAR PRADESH | 275101 | ₹14.0 L | L1 | Accepted-AOC L1 bidder |
| 2 | L2₹17.7 LRejected-Finance | ₹17.7 L | L2 | Rejected-Finance Not L1 bidder |
| Sl No | Description | Qty | Unit | Maa Sharda Enterprises L1 | M/S SINGH BUILDERS L2 |
|---|---|---|---|---|---|
| .10Civil Works | |||||
| 1.00 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.
All kinds of soil | 421 | cum | 71 ₹29,891 Lowest | 150 ₹63,150 |
| 2.00 | Filling available excavated earth (excluding rock) in trenches, plinth,sides of foundations etc. in layers not exceeding 20cm in depth,consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 316 | cum | 71 ₹22,436 Lowest | 120 ₹37,920 |
| 3.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) | 36 | cum | 4,501 ₹1,62,036 | 3,200 ₹1,15,200 Lowest |
| 4.00 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement -All work up to plinth level :
1:1.5:3 (1 cement : 1.5 coarse sand (zone-Ill) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 11 | cum | 5,001 ₹55,011 Lowest | 6,700 ₹73,700 |
| 5.00 | Centering and shuttering including strutting, propping etc. and removal of form for all heights :
Foundations, footings, bases of columns, etc. for mass concrete | 93 | sqm | 201 ₹18,693 | 200 ₹18,600 Lowest |
| 6.00 | Centering and shuttering including strutting, propping etc. And removal of form for all heights :
Lintels, beams, plinth beams, girders, bressumers and cantilevers | 93 | sqm | 201 ₹18,693 Lowest | 210 ₹19,530 |
| 7.00 | Steel reinforcement for R.C.C. work including straightening, cutting,bending, placing in position and binding all complete upto plinth level.
Thermo-Mechanically Treated bars of grade Fe-500D or more. | 1,424 | kg | 61 ₹86,864 Lowest | 85 ₹1,21,040 |
| 8.00 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand) | 173 | cum | 4,501 ₹7,78,673 Lowest | 6,300 ₹10,89,900 |
| 9.00 | 12 mm cement plaster of mix : 1:4 (1 cement: 4 coarse sand) | 372 | sqm | 231 ₹85,932 Lowest | 250 ₹93,000 |
Tender Value
₹19.6 L
EMD Value
₹58,770
Closing Date
8 Apr 2026, 6:00 pmClosed
SM Engg Civil
LBSI Airport Varanasi
Boundary wall and Miscellaneous Civil works at 02 nos of Primary Schools fouling in Runway extension area at LBSI Airport Varanasi
2026_AAI_271973_1
AAI/VNS/ENGG/Bwall/Misc/NIT-02
Open Tender
Civil Works
Item Rate
60 days
LBSI Airport Varanasi
Please refer Tender documents.
13 documents required · 13 mandatory
₹1,180
₹58,770
21 Aug 2026
18 Mar 2026
10 Apr 2026
19 Mar 2026
8 Apr 2026
19 Mar 2026
19 Mar 2026 - 2 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.9 | Civil Works | - | - | - | - |
| 1Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. All kinds of soil | |||||
| - | Filling available excavated earth (excluding rock) in trenches, plinth,sides of foundations etc. in layers not exceeding 20cm in depth,consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | - | cum | - | - |
| 3Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) | |||||
| - | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement -All work up to plinth level :
1:1.5:3 (1 cement : 1.5 coarse sand (zone-Ill) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | - | - |
| 5Centering and shuttering including strutting, propping etc. and removal of form for all heights : Foundations, footings, bases of columns, etc. for mass concrete | |||||
| - | Centering and shuttering including strutting, propping etc. And removal of form for all heights :
Lintels, beams, plinth beams, girders, bressumers and cantilevers | - | sqm | - | - |
| 7Steel reinforcement for R.C.C. work including straightening, cutting,bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | |||||
| - | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand) | - | cum | - | - |
| 912 mm cement plaster of mix : 1:4 (1 cement: 4 coarse sand) | |||||
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.79 MB
MiscDocs.pdf
Tender Documents • 9.81 MB
BOQ_317258.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].