Loading…
Loading…
Tender Value
₹14.3 L
EMD Value
₹28,666
Closing Date
3 Oct 2026, 6:00 pm
Deputy Conservator of Forests, Wildlife Division
Deputy Conservator of Forests, Wildlife Division, Haddo.
Renovation extension of protection camp at tarmugli island mgmnp range
2026_DCFWL_24761_1
WL/G-21/7/1843
Open Tender
Civil Works - Others
Works
30 days
Deputy Conservator of Forests WL
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹28,666
21 Sept 2026
21 Sept 2026
5 Oct 2026
21 Sept 2026
3 Oct 2026
21 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 0.81 | Cum | 1.25 | ₹1.01 |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lift. | 0.36 | Cum | - | - |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level :1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). | 0.16 | Cum | 100 | ₹16.2 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level :1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.42 | Cum | 53 | ₹22.42 |
| 5 | Centring and shuttering including strutting, propping etc. and removal of form work for : Foundations, footings, bases for columns | 5.76 | Sqm | 10 | ₹57.6 |
| 6 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 1.04 | Cum | 11 | ₹11.42 |
| 7 | Centring and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete. | 12.72 | Sqm | 1.25 | ₹15.9 |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Cold twisted bars | 117.56 | Kgs | - | - |
| 9 | Providing wood work in frames of false ceiling, partitions etc. sawn and fixed in position with necessary stainless steel screws etc Category - II (A) Sawn Timber | 3.11 | Cum | 100 | ₹311.1 |
| 10 | Providing and fixing Aluminium Composite of size 8ft x 4ft , 4 mm thick of solid / plain color with a non-toxic polyethylene (PE) or fire-retardant core is sandwiched between two metal sheets.on both side (inner & outer) of timber frame work including cutting in required size and shape, placing in position, making correct the joints etc. and fixing fixed with steel screws / nails all complete. (Timber frame work shall be paid for separately) | 139.87 | Sqm | 53 | ₹7,412.85 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.95 MB
Tendernotice_2.pdf
PDF • 1.05 MB
BOQ_26207.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .