| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹74.5 LAccepted-Finance RAHMANPUR LUCKNOW | ₹74.5 L | L1 | Accepted-Finance L1 |
| 2 | L2₹82.0 LRejected-Finance | ₹82.0 L | L2 | Rejected-Finance L2 |
| 3 | L3₹76.0 LRejected-Finance | ₹76.0 L | L3 | Rejected-Finance L3 |
Tender Value
₹1.1 Cr
EMD Value
₹7.5 L
Closing Date
23 Mar 2026, 12:00 pmClosed
Office of the S.E, Jhansi Circle, P.W.D., Jhansi
Office of the S.E, Jhansi Circle, P.W.D., Jhansi
Construction of Chiapai ka mazra Pathla Link road
2026_CEJNS_1126654_3
1195/ 44 C- Jhansi Circle/25 Date 14.02.2026
Open Tender
Civil Works - Roads
270 days
Lalitpur
Please refer Tender documents.
3 documents required · 3 mandatory
₹4,100
₹7.5 L
Yes
Office of the S.E, Jhansi Circle, P.W.D., Jhansi
8 Apr 2026
18 Mar 2026
23 Mar 2026
18 Mar 2026
23 Mar 2026
18 Mar 2026
19 Mar 2026
Construction of embankment with approved material obtained from local pits with a lift up to 1.50 m, transporting to site, spreading, grading to required slope and compacted to meet requirement of Tables 300.1 and 300.2 with a lead up to 1000 m as per Technical Specification Clause 301.5 (Excluding GST)
Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (Excluding GST)
Construction of Granular sub-base with 53-9.5 mm materials (Table 400.13) by mix in place method normal construction of granular sub base by providing material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method by Rotavator at once and compacting with smooth wheel roller to achieve the desired density, complete as per clause 401 as per MORD Technical Soecification Clause 401
WBM Grading 2 Providing, laying, spreading and compacting stone aggregates of specific sizes to Water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fillup the interstices of course aggregate, watering and compacting to the reqiured density Grading 2 as per MORD Technical Specification Clause 405 (Excluding GST)
WBM Grading 3 Providing, laying, spreading and compacting stone aggregates of specific sizes to Water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fillup the interstices of course aggregate, watering and compacting to the reqiured density Grading 3 as per MORD Technical Specification Clause 405 (Excluding GST)
Low porosity providing and applying primer coat with bitumen emulsion on prepared surface of granular base including cleanin of road surface and spraying primer @ 0.70 kg./sqm using mechanical means as per MORD technical specification clause 502 (Excluding GST)
Providing and applying tack coat with bitumen VG-10 using bitumen distributor @ 0.30 kg / sqm on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per MORD technical specification clause 503 (Excluding GST)
Providing and laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by Seal coat of Type C as per MORD Technical Specification Clause 508. (Excluding GST)
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grede and cross fall using Type C as per Technical Specification MORD sepecification no. Clause 510. as per Data Book item No. 5.12 (B) Case - III TypeC (Excluding GST)
Brick edging on both sides of the road of first class bricks 8 cm (3") wide and 12 cm 4.5" deeps laid with mud mortar including labour and supply of bricks finished to required template and proper alignment and also including dressing and ramming the excavated earth as directed by E-in-C. (Excluding GST)
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202. (Excluding GST)
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. (Excluding GST)
Sand/Stone dust Fillling in foundation trenches as per drawing and technical specification Clause 305.3.9 (Excluding GST)
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 (P.C.C grade M-10 ) (Excluding GST)
Random course rubble masonary in 1:3 cement and course sand mortar in foundation and plinth, including supply of material as order by the E/I, Labour, T&P etc., required for proper completion of work. As per schedule (chapter 8 additional item no. 2) (Excluding GST)
Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 (R.C.C. Grade M 30) (Excluding GST)
Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 (Excluding GST)
Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specification Clause 1302 (Excluding GST)
Dewatering of foundation by 5HP Diesel Engine Pump (Excluding GST)
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 (Excluding GST)
Cement concrete with 2 cm guage approved stone ballast,coarse sand & cement proportion 1:2:4 including supply of all material,labour and T&P.as per schedule item No 279(a). (Excluding GST)
Construction of embankment with approved material obtained from local pits with a lift up to 1.50 m, transporting to site, spreading, grading to required slope and compacted to meet requirement of Tables 300.1 and 300.2 with a lead up to 1000 m as per Technical Specification Clause 301.5 (Excluding GST)
Providing and applying reinforced cement concrete 1000 mm dia pipe NP-3 for culvert on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection work, back filling, concrete and masonary works in head walls and parapets Clouse 1106. (Excluding GST)
TRAFFIC SIGNS - HAZARD MARKER (LEFT/RIGHT) Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 mad of high intensity grade sheeting vide clause 801.3, fixed cover aluminium shting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x75 mm x6 mm firmly fixed to th ground by means of properly dsignd foundation with M-15 grade cment conc. 45 cm x 45 cm x 60 cm, 60 cm below ground lvel as per approved drawing (Excluding GST)
Supplying and installation of delineators (road way indicators, hazard markers, object markers), 80-100 cm high above ground level, painted black and white in 15 cm wide strips, fitted with 80 x 100 mm rectangular or 75 mm dia circular reflectorised panels at the top, buried or pressed into the ground and conforming toIRC-79 and the drawings. MORTH-805(8.150) (Excluding GST)
Excavation in foundation in soil requring the use of special tools and plant such as pickaxes/sabbals etc. including lift up to 1.5m and lead up to 50m as (Excluding GST)
Stone Dust Filling in foundation trenches as per drawing and technical specification clause 305.3.9 (Excluding GST)
Providing concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203P.C.C grade M 10 (Nominal mix 1:3:6) (Excluding GST)
Supply & Fixing & jointing of NP-3 Hume pipe 1000 mm dia (S&S Type) up to site. (Excluding GST)
Supply & Fixing & jointing of NP-3 Hume pipe 600 mm dia (S&S Type) up to site. (Excluding GST)
Providing concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 (Nominal mix 1:2:4) (Excluding GST)
RCR Stone masonary work in cement mortar in foundation complete as per drawing and technical specification Clauses 702, 704, 1202 & 1203. In 1:3 cement mortar (Excluding GST)
Pointing with cement mortar (1:3) on Stone work as per drawing and technical specification Clauses 613.3 and 1204 (Excluding GST)
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 1st year maintenance cost (0.00% Construction Cost) (But Excluding GST)
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 2nd year maintenance cost (0.75% Construction Cost) (Excluding GST) (But Excluding GST)
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 3rd year maintenance cost (1.50% Construction Cost) (Excluding GST) (But Excluding GST)
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 4th year maintenance cost (2.25% Construction Cost) (But Excluding GST)
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 5th year maintenance cost (3.00% Construction Cost) (But Excluding GST)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
techsummary_2101123.pdf
BOQ Comparative Chart
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.55 MB
T2.pdf
Tender Documents • 0.51 MB
BOQ_2101123.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid