Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹1.1 CrAdmitted-Finance | ₹1.1 Cr | Admitted-Finance |
| 2 | Rejected-Technical | - | Rejected-Technical not fulfill all tender conditions |
| 3 | Rejected-Technical | - | Rejected-Technical Not fullfill all tender conditions |
| Sl No | Description | Qty | Unit | Desapex Engineering Consultants LLP |
|---|---|---|---|---|
| 1.00Item | ||||
| 1.01 | STP surveys, data collection, workshops & submission of inception report for all 13 STP’s, as per ToR | 1 | Nos | 4,66,573 ₹5.5 L |
| 1.02 | Ongoing Construction BIM Models in LOD-300 for 13 STP’s, as per ToR | 1 | Nos | 9,33,147 ₹11.0 L |
| 1.03 | Ongoing construction BIM models with complete Asset Register for 13 STPs, as per ToR | 1 | Nos | 9,33,147 ₹11.0 L |
| 1.04 | Augmented Reality Implementation for 13 STP’s, as per ToR | 1 | Nos | 27,99,440 ₹33.0 L |
| 1.05 | Development of HD Video’s (60 Seconds) for 13 STP’s, as per ToR | 1 | Nos | 9,33,147 ₹11.0 L |
| 1.06 | Final As-Built BIM Models in LOD-300 with complete Asset Register for 13 STP’s, as per ToR | 1 | Nos | 23,32,866 ₹27.5 L |
| 1.07 | Trainings, as per ToR | 1 | Nos | 9,33,147 ₹11.0 L |
Tender Value
Refer Docs
EMD Value
₹82,000
Closing Date
6 Mar 2026, 3:00 pmClosed
chief engg.
3rd floor, Drainage dept, Savarkar Bhavan, Shivajinagar, Pune-05
IMPLEMENTATION OF BIM
2026_PMCP_1277798_1
PMC/DRAINAGE/2025/265
Open Tender
Civil Works - Others
270 days
pmc limit
Please refer Tender documents.
3 documents required · 3 mandatory
₹6,079
₹82,000
3rd floor, Drainage dept, Savarkar Bhavan, Shivaji
8 Apr 2026
13 Feb 2026
9 Mar 2026
13 Feb 2026
6 Mar 2026
13 Feb 2026
20 Feb 2026
STP surveys, data collection, workshops & submission of inception report for all 13 STP’s, as per ToR
Ongoing Construction BIM Models in LOD-300 for 13 STP’s, as per ToR
Ongoing construction BIM models with complete Asset Register for 13 STPs, as per ToR
Augmented Reality Implementation for 13 STP’s, as per ToR
Development of HD Video’s (60 Seconds) for 13 STP’s, as per ToR
Final As-Built BIM Models in LOD-300 with complete Asset Register for 13 STP’s, as per ToR
Trainings, as per ToR
Note :- 1) The amount mentioned for each item shall not exceed the minimum percentage of the total bid amount, as mentioned in Vol-2; Table 6.1.6 Payment Schedule, 2) In case of any further delay in construction of any STP within the contract, the partial payment to the bidder shall be made on the estimation basis, as per MLD developed by the Pune Municipal Corporation.
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
technical_2198543.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.53 MB
PackageB1Volume1.pdf
Tender Documents • 5.82 MB
PackageB1Volume2.pdf
Tender Documents • 7.29 MB
BOQ_2198543.xls
BOQ • 0.30 MB
PackageB1Volume3.pdf
Tender Documents • 5.42 MB
Download all tender documents and submit your bid