Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹14.5 LAccepted-AOC LANE NO 14 SECTOR I DOGRA NAGAR JAMMU | JAMMU | JAMMU | JAMMU AND KASHMIR | 1 | Accepted-AOC Lowest Bidder | |
| 2 | 2₹16.8 L+₹2.3 L (15.7%)Rejected-Finance KURUKSHETRA | KURUKSHETRA | HARYANA | 136030 | 2 | Rejected-Finance 2nd Lowest | |
| 3 | 3₹18.7 L+₹4.2 L (28.7%)Rejected-Finance | 3 | Rejected-Finance 3rd lowest | |
| 4 | 4₹19.4 L+₹4.9 L (33.6%)Rejected-Finance | 4 | Rejected-Finance 4th lowest |
Tender Value
₹15.7 L
EMD Value
₹31,320
Closing Date
15 Dec 2022, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
MUNEESH BABBAR
Saraswati Heritage Divn.2, Kurukshetra
To increase the ground water level
2022_HRY_247250_1
2022D160F768 7E2C 43B0 BF66 254025BC6D7D1598IRR
Open Tender
Civil Works
Works
180 days
RAMPURA (153)
2 documents required · 2 mandatory
₹1,000
₹31,320
Yes
25 Jan 2023
25 Nov 2022
16 Dec 2022
25 Nov 2022
15 Dec 2022
25 Nov 2022
Amount
Works Details
[10.40.1]Providing and fixing of 40 mm thick fine dressed stone flooring over 20 mm (average) thick base of cement mortar 1:5 (1 cement : 5 coarse sand), including pointing with cement mortar 1:2 (1 cement : 2 stone dust) with an admixture of pigment to match the shade of stone. 1. Red sand stone Through Rate
[10.42]Extra for pre finished nosing in treads of steps of Kota stone/ sand stone slab. Through Rate
[11.5.2]12 mm cement plaster of mix : 2. 1:3 (1 cement: 3 fine sand) Through Rate
[14.32.1]Single layer brick lining for irrigation channels for discharge above 150 cusecs but up to 1000 cusecs, consisting of: (i)10 mm thick cement plaster 1 :6 on sub grade. (ii)12 mm thick cement plaster 1:3 over first plaster. (iii) First layer of 68.3 mm thick brick layer (228.6x111.1 mm) laid in1:3 mortar over 6mm thick 1 :3 cement mortar. (total thickness of lining as 9.63 cm) 1. In Bed Through Rate
[14.32.2]Single layer brick lining for irrigation channels for discharge above 150 cusecs but up to 1000 cusecs, consisting of: (i)10 mm thick cement plaster 1 :6 on sub grade. (ii)12 mm thick cement plaster 1:3 over first plaster. (iii) First layer of 68.3 mm thick brick layer (228.6x111.1 mm) laid in1:3 mortar over 6mm thick 1 :3 cement mortar. (total thickness of lining as 9.63 cm) 2. On Side Slopes Through Rate
[21.95.3]Providing lowering cutting jointing and testing RCC pipe class NP3 as per IS-458-2003 with spigot and socketed joints manufactured with ISI marked sulphate resistance cement as per ISI 12330 with rubber rings ISI marked antiternmite as required at site in to trenches for all depths and laying out the same to correct alignment gradients and levels including dressing and trimming and cutting of concrete beds and side of trenches, if required jointing with rubber rings in trenches and jointing with 1:3/2 cement sand mortar and with end dowels filled with 1:3/2 cement sand mortar and finishing the joints at an angle of 45 degree with faces of spigot of socket joints cutting and finishing the cut surface to a uniform finish etc. as fully described in item No. 21.38, item 21.44, item 21.45, and item 21.46 including cartage loading and unloading complete in all respects. the internal diametric of the sewer being: 3. 450 mm Through Rate
[4.12.1]Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soil Through Rate
[4.14.1]Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 1. All kinds of soil. Through Rate
[4.8.1]Earth work in rough excavation, banking excavated earth in layers not exceeding 20cm in depth, breaking clods, watering, rolling each layer with ½ tonne roller or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, lead up to 50 m and lift up to 1.5 m : 1. All kinds of soil Through Rate
[6.1.4]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 4. 1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 20 mm nominal size) Through Rate
[7.21.1]Brick work with common burnt clay non-modular bricks of class designation 10.5 in foundation and plinth in: 1. Cement mortar 1:4 (1 cement : 4 coarse sand) Through Rate
[7.22.1]Brick work with common burnt clay non-modular bricks of class designation 10.5 in superstructure above plinth level up to floor IV level in all shapes and sizes in : 1. Cement mortar 1:4 (1 cement : 4 coarse sand) Through Rate
THE AVISH COOPERATIVE LABOUR & CONSTRUCTION SOCITY LTD KURUKSHETRA
MANJEET SINGH MOR CONTRACTOR
RAJIV MALIK
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .